If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274263509003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.351503,"lon":-113.545682,"icon":""}]} |
| Location: 00/09-35-027-26W4/3 | |
| Location Alias: 00/09-35-27-26 W4M | |
| Location Alias 2: 00/09-35-027-26 W4/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 35 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 9-35-27-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0306651 | |
| License Date: 2004-03-30 | |
| License Status: Issued | |
| Spud Date: 2004-06-28 | |
| Final Drill Date: 2004-07-07 | |
| Well Total Depth: 751.00 m | |
| Surface Hole Latitude: 51.351503 | |
| Surface Hole Longitude: -113.545682 |
| Date | Event |
|---|---|
| 2004-03-30 | Obtained License |
| 2004-06-28 | Surface Casing Operation Performed |
| 2004-07-07 | Finished Drilling |
| 2004-07-07 | Production Casing Operation Performed |
| 2004-07-07 | Rig Released |
| 2004-07-07 | Well Mode changed to Drilled and Cased |
| 2004-07-22 | Well Log Performed |
| 2004-08-17 | Perforation Treatment Performed - Jet Perforation |
| 2004-09-21 | Perforation Treatment Performed - Fractured |
| 2004-11-05 | Perforation Treatment Performed - Jet Perforation |
| 2004-12-20 | Perforation Treatment Performed - Jet Perforation |
| 2005-01-09 | Perforation Treatment Performed - Fractured |
| 2005-02-26 | Well Began Production |
| 2005-02-26 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2005-02-26 | Well Mode changed to Flowing |
| 2017-03-14 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2017-03-14 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-08-17 | Perforation | 693.00 | 696.00 | 13 |
| 2004-12-20 | Perforation | 582.00 | 582.50 | 13 |
| 2004-12-20 | Perforation | 570.80 | 571.30 | 13 |
| 2004-12-20 | Perforation | 560.90 | 561.40 | 13 |
| 2004-12-20 | Perforation | 554.40 | 554.90 | 13 |
| 2004-12-20 | Perforation | 528.30 | 528.80 | 13 |
| 2004-12-20 | Perforation | 525.80 | 526.30 | 13 |
| 2004-12-20 | Perforation | 507.40 | 507.90 | 13 |
| 2004-12-20 | Perforation | 500.60 | 501.10 | 13 |
| 2004-12-20 | Perforation | 481.50 | 482.00 | 13 |
| 2004-12-20 | Perforation | 475.80 | 476.30 | 13 |
| 2004-09-21 | Fracture | 693.00 | 696.00 | 0 |
| 2004-12-20 | Perforation | 471.90 | 472.40 | 13 |
| 2004-12-20 | Perforation | 459.10 | 459.60 | 13 |
| 2004-12-20 | Perforation | 455.50 | 456.00 | 13 |
| 2004-12-20 | Perforation | 352.80 | 353.30 | 13 |
| 2004-12-20 | Perforation | 347.90 | 348.40 | 13 |
| 2004-12-20 | Perforation | 338.00 | 338.50 | 13 |
| 2004-12-20 | Perforation | 335.20 | 335.70 | 13 |
| 2004-12-20 | Perforation | 325.50 | 326.00 | 13 |
| 2004-12-20 | Perforation | 270.20 | 270.70 | 13 |
| 2004-12-20 | Perforation | 227.70 | 228.20 | 13 |
| 2004-11-05 | Perforation | 670.00 | 673.00 | 14 |
| 2004-12-20 | Perforation | 220.20 | 220.70 | 13 |
| 2004-12-20 | Perforation | 218.80 | 219.30 | 13 |
| 2005-01-09 | Fracture | 218.80 | 629.40 | 0 |
| 2004-12-20 | Perforation | 628.90 | 629.40 | 13 |
| 2004-12-20 | Perforation | 626.20 | 626.70 | 13 |
| 2004-12-20 | Perforation | 608.40 | 608.90 | 13 |
| 2004-12-20 | Perforation | 600.80 | 601.30 | 13 |
| 2004-12-20 | Perforation | 598.00 | 598.50 | 13 |
| 2004-12-20 | Perforation | 595.40 | 595.90 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 7415 | 0.0 | 0.0 | 0.0 |
| 2006 | 8712 | 0.0 | 0.0 | 0.0 |
| 2007 | 8689 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8722 | 0.0 | 0.0 | 0.0 |
| 2012 | 8739 | 0.0 | 0.0 | 0.0 |
| 2013 | 8752 | 0.0 | 0.0 | 0.0 |
| 2014 | 8625 | 0.0 | 0.0 | 0.0 |
| 2015 | 8614 | 0.0 | 0.0 | 0.0 |
| 2016 | 8698 | 0.0 | 0.0 | 0.0 |
| 2017 | 8544 | 0.0 | 0.0 | 0.0 |
| 2018 | 8638 | 0.0 | 0.0 | 0.0 |
| 2019 | 8659 | 0.0 | 0.0 | 0.0 |
| 2020 | 2108 | 0.0 | 0.0 | 0.0 |
For data sources see[5]