X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274263309002

Well Details

Well ID: 0274263309002
Loading map...
Location: 00/09-33-027-26W4/2
Location Alias: 00/09-33-27-26 W4M
Location Alias 2: 00/09-33-027-26 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 33
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 9-33-27-26
Operator Name: Ember Resources Inc.
License Number: 0317028
License Date: 2004-10-19
License Status: Issued
Spud Date: 2005-01-28
Final Drill Date: 2005-01-29
Well Total Depth: 778.00 m
Surface Hole Latitude: 51.352731
Surface Hole Longitude: -113.592114

For data sources see[1][2]

Well History

Date Event
2004-10-19 Obtained License
2005-01-29 Finished Drilling
2005-01-29 Production Casing Operation Performed
2005-01-29 Rig Released
2005-01-29 Surface Casing Operation Performed
2005-01-29 Well Mode changed to Drilled and Cased
2005-02-05 Well Log Performed
2005-02-18 Perforation Treatment Performed - Jet Perforation
2005-05-21 Perforation Treatment Performed - Jet Perforation
2005-05-22 Perforation Treatment Performed - Jet Perforation
2005-05-29 Perforation Treatment Performed - Fractured
2007-07-11 Well Began Production
2007-07-11 Well Fluid changed to Coalbed Methane-Coals and Other
2007-07-11 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-18 Perforation 446.00 450.00 13
2005-05-21 Perforation 577.70 578.20 13
2005-05-21 Perforation 571.00 571.50 13
2005-05-21 Perforation 545.40 545.90 13
2005-05-21 Perforation 537.10 537.60 13
2005-05-21 Perforation 535.90 536.40 13
2005-05-21 Perforation 534.70 535.20 13
2005-05-21 Perforation 518.90 519.40 13
2005-05-21 Perforation 512.50 513.00 13
2005-05-21 Perforation 507.10 507.60 13
2005-05-21 Perforation 505.60 506.10 13
2005-05-21 Perforation 643.70 644.20 13
2005-05-22 Perforation 497.30 497.80 13
2005-05-22 Perforation 489.10 489.60 13
2005-05-22 Perforation 484.30 484.80 13
2005-05-22 Perforation 474.40 474.90 13
2005-05-22 Perforation 472.20 472.70 13
2005-05-22 Perforation 370.10 370.60 13
2005-05-22 Perforation 367.20 367.70 13
2005-05-22 Perforation 361.80 362.30 13
2005-05-22 Perforation 350.20 350.70 13
2005-05-22 Perforation 347.50 348.00 13
2005-05-21 Perforation 640.60 641.10 13
2005-05-22 Perforation 336.90 337.40 13
2005-05-22 Perforation 282.70 283.20 13
2005-05-22 Perforation 239.70 240.20 13
2005-05-22 Perforation 232.80 233.30 13
2005-05-22 Perforation 222.40 222.90 13
2005-05-22 Perforation 214.40 214.90 13
2005-05-29 Fracture 214.40 644.20 0
2005-05-21 Perforation 626.80 627.80 13
2005-05-21 Perforation 616.00 616.50 13
2005-05-21 Perforation 611.50 612.00 13
2005-05-21 Perforation 608.40 608.90 13
2005-05-21 Perforation 597.00 598.00 13
2005-05-21 Perforation 583.30 583.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 3993 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8743 0.0 0.0 0.0
2011 8754 0.0 0.0 0.0
2012 8638 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8728 0.0 0.0 0.0
2015 8694 0.0 0.0 0.0
2016 8724 0.0 0.0 0.0
2017 8580 0.0 0.0 0.0
2018 8697 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References