If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274263209023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.353542,"lon":-113.615574,"icon":""}]} |
| Location: 02/09-32-027-26W4/3 | |
| Location Alias: 02/09-32-27-26 W4M | |
| Location Alias 2: 02/09-32-027-26 W4/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 32 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER 102 ENTICE 9-32-27-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0316715 | |
| License Date: 2004-10-14 | |
| License Status: Issued | |
| Spud Date: 2005-01-25 | |
| Final Drill Date: 2005-01-26 | |
| Well Total Depth: 1016.00 m | |
| Surface Hole Latitude: 51.353542 | |
| Surface Hole Longitude: -113.615574 |
| Date | Event |
|---|---|
| 2004-10-14 | Obtained License |
| 2005-01-26 | Finished Drilling |
| 2005-01-26 | Production Casing Operation Performed |
| 2005-01-26 | Surface Casing Operation Performed |
| 2005-01-26 | Well Mode changed to Drilled and Cased |
| 2005-01-27 | Rig Released |
| 2005-01-31 | Well Log Performed |
| 2005-02-17 | Perforation Treatment Performed - Jet Perforation |
| 2005-03-20 | Perforation Treatment Performed - Fractured |
| 2008-01-12 | Perforation Treatment Performed - Jet Perforation |
| 2008-01-18 | Perforation Treatment Performed - Fractured |
| 2010-10-12 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-05 | Perforation Treatment Performed - Fractured |
| 2010-11-25 | Well Began Production |
| 2010-11-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-11-25 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-02-17 | Perforation | 558.00 | 562.00 | 13 |
| 2008-01-12 | Perforation | 606.80 | 607.80 | 13 |
| 2008-01-12 | Perforation | 591.30 | 591.80 | 13 |
| 2008-01-12 | Perforation | 585.40 | 585.90 | 13 |
| 2008-01-12 | Perforation | 577.70 | 579.70 | 13 |
| 2008-01-12 | Perforation | 550.80 | 551.30 | 13 |
| 2008-01-12 | Perforation | 548.80 | 549.80 | 13 |
| 2008-01-12 | Perforation | 546.10 | 546.60 | 13 |
| 2008-01-12 | Perforation | 541.90 | 542.40 | 13 |
| 2008-01-12 | Perforation | 527.00 | 527.50 | 13 |
| 2008-01-12 | Perforation | 518.90 | 519.40 | 13 |
| 2005-03-20 | Fracture | 558.00 | 562.00 | 0 |
| 2008-01-12 | Perforation | 488.30 | 488.80 | 13 |
| 2008-01-12 | Perforation | 469.70 | 470.20 | 13 |
| 2008-01-12 | Perforation | 377.60 | 378.10 | 13 |
| 2008-01-12 | Perforation | 371.70 | 372.20 | 13 |
| 2008-01-12 | Perforation | 358.30 | 358.80 | 13 |
| 2008-01-12 | Perforation | 346.70 | 347.20 | 13 |
| 2008-01-12 | Perforation | 341.20 | 341.70 | 13 |
| 2008-01-12 | Perforation | 293.00 | 293.50 | 13 |
| 2008-01-12 | Perforation | 250.10 | 252.10 | 13 |
| 2008-01-12 | Perforation | 243.70 | 244.70 | 13 |
| 2008-01-12 | Perforation | 664.70 | 665.20 | 13 |
| 2008-01-18 | Fracture | 243.70 | 665.20 | 0 |
| 2010-10-12 | Perforation | 965.00 | 968.00 | 13 |
| 2010-10-12 | Perforation | 928.00 | 930.00 | 13 |
| 2010-10-12 | Perforation | 866.00 | 868.00 | 13 |
| 2010-10-12 | Perforation | 850.00 | 852.00 | 13 |
| 2010-10-12 | Perforation | 797.50 | 798.50 | 13 |
| 2010-10-12 | Perforation | 509.00 | 512.00 | 13 |
| 2010-10-12 | Perforation | 464.00 | 467.00 | 13 |
| 2010-10-12 | Perforation | 452.00 | 455.00 | 13 |
| 2010-10-12 | Perforation | 401.00 | 402.00 | 13 |
| 2008-01-12 | Perforation | 654.30 | 654.80 | 13 |
| 2010-10-12 | Perforation | 389.00 | 391.00 | 13 |
| 2010-10-12 | Perforation | 350.00 | 351.00 | 13 |
| 2010-10-12 | Perforation | 317.00 | 320.00 | 13 |
| 2010-10-12 | Perforation | 301.00 | 303.00 | 13 |
| 2010-11-05 | Fracture | 243.70 | 665.20 | 0 |
| 2008-01-12 | Perforation | 650.90 | 651.40 | 13 |
| 2008-01-12 | Perforation | 637.10 | 638.10 | 13 |
| 2008-01-12 | Perforation | 626.30 | 626.80 | 13 |
| 2008-01-12 | Perforation | 620.20 | 620.70 | 13 |
| 2008-01-12 | Perforation | 616.50 | 617.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 888 | 0.0 | 0.0 | 0.0 |
| 2011 | 8754 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8728 | 0.0 | 0.0 | 0.0 |
| 2015 | 8694 | 0.0 | 0.0 | 0.0 |
| 2016 | 8724 | 0.0 | 0.0 | 0.0 |
| 2017 | 8580 | 0.0 | 0.0 | 0.0 |
| 2018 | 8697 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]