X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274263108002

Well Details

Well ID: 0274263108002
Loading map...
Location: 00/08-31-027-26W4/2
Location Alias: 00/08-31-27-26 W4M
Location Alias 2: 00/08-31-027-26 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 31
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 8-31-27-26
Operator Name: Ember Resources Inc.
License Number: 0262667
License Date: 2001-11-28
License Status: Issued
Spud Date: 2001-12-05
Final Drill Date: 2001-12-07
Well Total Depth: 750.00 m
Surface Hole Latitude: 51.350207
Surface Hole Longitude: -113.639689

For data sources see[1][2]

Well History

Date Event
2001-11-28 Obtained License
2001-12-05 Conductor Casing Operation Performed
2001-12-07 Finished Drilling
2001-12-07 Production Casing Operation Performed
2001-12-07 Rig Released
2001-12-07 Well Mode changed to Drilled and Cased
2001-12-13 Well Log Performed
2002-02-01 Perforation Treatment Performed - Jet Perforation
2002-02-02 Perforation Treatment Performed - Fractured
2002-02-22 Well Log Performed
2010-05-22 Perforation Treatment Performed - Jet Perforation
2010-07-07 Perforation Treatment Performed - Fractured
2010-07-13 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-02-01 Perforation 677.50 679.50 13
2002-02-01 Perforation 579.10 581.10 13
2002-02-01 Perforation 575.20 576.20 13
2002-02-01 Perforation 551.30 552.30 13
2002-02-01 Perforation 522.60 523.60 13
2002-02-01 Perforation 518.50 520.50 13
2002-02-01 Perforation 506.10 507.10 13
2002-02-01 Perforation 453.60 454.60 13
2002-02-01 Perforation 402.10 403.10 13
2002-02-01 Perforation 391.40 392.40 13
2002-02-01 Perforation 352.30 353.30 13
2002-02-01 Perforation 667.80 669.80 13
2002-02-01 Perforation 324.60 325.60 13
2002-02-01 Perforation 280.40 282.40 13
2002-02-01 Perforation 273.30 276.30 13
2002-02-01 Perforation 254.50 256.50 13
2002-02-01 Perforation 246.40 247.40 13
2002-02-02 Fracture 246.40 679.50 0
2010-05-22 Perforation 621.00 624.00 13
2010-05-22 Perforation 588.50 591.50 13
2010-05-22 Perforation 482.00 484.00 13
2010-05-22 Perforation 477.50 479.50 13
2002-02-01 Perforation 659.50 660.50 13
2010-05-22 Perforation 383.00 386.00 13
2010-05-22 Perforation 359.50 362.50 13
2010-05-22 Perforation 348.00 349.00 13
2010-05-22 Perforation 231.00 233.00 13
2010-07-07 Fracture 588.50 591.50 0
2002-02-01 Perforation 653.40 654.40 13
2002-02-01 Perforation 648.50 650.50 13
2002-02-01 Perforation 640.50 642.50 13
2002-02-01 Perforation 627.40 628.40 13
2002-02-01 Perforation 617.20 618.20 13
2002-02-01 Perforation 608.80 611.80 13

For data sources see[4]



References