If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274263013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.342336,"lon":-113.656454,"icon":""}]} |
| Location: 00/13-30-027-26W4/0 | |
| Location Alias: 00/13-30-27-26 W4M | |
| Location Alias 2: 00/13-30-027-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 30 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 13-30-27-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0306908 | |
| License Date: 2004-04-06 | |
| License Status: Issued | |
| Spud Date: 2005-01-23 | |
| Final Drill Date: 2005-01-24 | |
| Well Total Depth: 1033.00 m | |
| Surface Hole Latitude: 51.342336 | |
| Surface Hole Longitude: -113.656454 |
| Date | Event |
|---|---|
| 2004-04-06 | Obtained License |
| 2005-01-23 | Surface Casing Operation Performed |
| 2005-01-24 | Finished Drilling |
| 2005-01-24 | Production Casing Operation Performed |
| 2005-01-24 | Rig Released |
| 2005-01-24 | Well Mode changed to Drilled and Cased |
| 2005-01-31 | Well Log Performed |
| 2005-02-16 | Perforation Treatment Performed - Jet Perforation |
| 2005-02-27 | Well Fluid changed to Gas |
| 2005-02-27 | Well Mode changed to Testing |
| 2005-08-16 | Well Began Production |
| 2005-08-16 | Well Fluid changed to Gas |
| 2005-08-16 | Well Mode changed to Flowing |
| 2008-02-12 | Perforation Treatment Performed - Jet Perforation |
| 2008-02-21 | Perforation Treatment Performed - Fractured |
| 2008-12-12 | Perforation Treatment Performed - Jet Perforation |
| 2009-01-14 | Perforation Treatment Performed - Fractured |
| 2009-02-01 | Perforation Treatment Performed - Jet Perforation |
| 2009-02-19 | Perforation Treatment Performed - Jet Perforation |
| 2009-02-20 | Perforation Treatment Performed - Fractured |
| 2010-04-01 | Well Fluid changed to Gas |
| 2010-04-01 | Well Mode changed to Suspended |
| 2017-04-05 | Well Structure changed to Commingled |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-02-16 | Perforation | 978.50 | 982.50 | 13 |
| 2009-02-19 | Perforation | 265.40 | 265.90 | 14 |
| 2009-02-19 | Perforation | 269.60 | 270.10 | 14 |
| 2009-02-19 | Perforation | 391.00 | 392.00 | 14 |
| 2009-02-19 | Perforation | 402.90 | 403.40 | 14 |
| 2009-02-19 | Perforation | 278.40 | 278.90 | 14 |
| 2009-02-19 | Perforation | 321.40 | 321.90 | 14 |
| 2009-02-19 | Perforation | 386.00 | 389.00 | 14 |
| 2009-02-19 | Perforation | 403.50 | 405.50 | 14 |
| 2009-02-19 | Perforation | 254.50 | 255.50 | 14 |
| 2009-02-19 | Perforation | 263.00 | 264.00 | 14 |
| 2008-02-12 | Perforation | 942.00 | 945.00 | 13 |
| 2009-02-19 | Perforation | 248.30 | 248.80 | 14 |
| 2009-02-19 | Perforation | 256.90 | 257.40 | 14 |
| 2009-02-19 | Perforation | 432.00 | 434.00 | 14 |
| 2009-02-19 | Perforation | 439.00 | 441.00 | 14 |
| 2009-02-19 | Perforation | 508.00 | 508.50 | 14 |
| 2009-02-19 | Perforation | 655.00 | 656.00 | 14 |
| 2009-02-19 | Perforation | 659.20 | 659.70 | 14 |
| 2009-02-19 | Perforation | 627.00 | 627.50 | 14 |
| 2009-02-19 | Perforation | 646.50 | 647.50 | 14 |
| 2009-02-19 | Perforation | 684.50 | 685.00 | 14 |
| 2008-02-21 | Fracture | 942.00 | 945.00 | 0 |
| 2009-02-19 | Perforation | 686.40 | 686.90 | 14 |
| 2009-02-19 | Perforation | 666.50 | 667.00 | 14 |
| 2009-02-19 | Perforation | 673.70 | 675.70 | 14 |
| 2009-02-19 | Perforation | 538.70 | 539.20 | 14 |
| 2009-02-19 | Perforation | 564.20 | 564.70 | 14 |
| 2009-02-19 | Perforation | 530.00 | 530.50 | 14 |
| 2009-02-19 | Perforation | 533.60 | 534.10 | 14 |
| 2009-02-19 | Perforation | 590.60 | 591.10 | 14 |
| 2009-02-19 | Perforation | 595.70 | 596.70 | 14 |
| 2009-02-19 | Perforation | 619.00 | 622.00 | 14 |
| 2008-12-12 | Perforation | 830.50 | 832.50 | 13 |
| 2009-02-19 | Perforation | 592.70 | 593.20 | 14 |
| 2009-02-20 | Fracture | 254.50 | 441.00 | 0 |
| 2009-02-20 | Fracture | 248.30 | 686.90 | 0 |
| 2009-01-14 | Fracture | 830.50 | 832.50 | 0 |
| 2009-02-01 | Perforation | 761.00 | 763.00 | 13 |
| 2009-02-01 | Perforation | 767.00 | 769.00 | 13 |
| 2009-02-19 | Perforation | 274.10 | 274.60 | 14 |
| 2009-02-19 | Perforation | 276.60 | 277.10 | 14 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 3307 | 0.0 | 0.0 | 0.0 |
| 2006 | 8743 | 0.0 | 0.0 | 0.0 |
| 2007 | 8576 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[5]