X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274263001005

Well Details

Well ID: 0274263001005
Loading map...
Location: 00/01-30-027-26W4/5
Location Alias: 00/01-30-27-26 W4M
Location Alias 2: 00/01-30-027-26 W4/05
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 30
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 1-30-27-26
Operator Name: Ember Resources Inc.
License Number: 0268575
License Date: 2002-03-13
License Status: Issued
Spud Date: 2002-03-21
Final Drill Date: 2002-03-29
Well Total Depth: 1974.00 m
Surface Hole Latitude: 51.329730
Surface Hole Longitude: -113.639741

For data sources see[1][2]

Well History

Date Event
2002-03-13 Obtained License
2002-03-21 Well Log Performed
2002-03-22 Surface Casing Operation Performed
2002-03-22 Well Log Performed
2002-03-29 Finished Drilling
2002-03-29 Well Log Performed
2002-03-29 Well Mode changed to Drilled and Cased
2002-03-30 Plug Back Performed
2002-03-30 Production Casing Operation Performed
2002-03-30 Rig Released
2002-03-30 Well Log Performed
2002-07-28 Well Log Performed
2002-08-18 Perforation Treatment Performed - Jet Perforation
2002-08-26 Perforation Treatment Performed - Fractured
2002-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-09 Plug Back Performed
2002-09-14 Perforation Treatment Performed - Jet Perforation
2002-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-25 Plug Back Performed
2002-12-06 Perforation Treatment Performed - Jet Perforation
2003-01-14 Perforation Treatment Performed - Fractured
2003-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-05 Plug Back Performed
2003-02-08 Perforation Treatment Performed - Jet Perforation
2003-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-15 Plug Back Performed
2004-06-04 Perforation Treatment Performed - Jet Perforation
2004-06-05 Perforation Treatment Performed - Jet Perforation
2004-06-22 Perforation Treatment Performed - Fractured
2005-09-14 Well Began Production
2005-09-14 Well Fluid changed to Coalbed Methane-Coals Only
2005-09-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-08-18 Perforation 993.50 995.50 7
2003-02-08 Perforation 764.50 766.50 7
2003-03-15 Packing Device Capped w/Cement 747.00 755.00 0
2004-06-04 Perforation 405.50 407.50 13
2004-06-04 Perforation 446.00 447.00 13
2004-06-04 Perforation 505.50 506.50 13
2004-06-04 Perforation 512.00 513.00 13
2004-06-04 Perforation 515.50 516.50 13
2004-06-04 Perforation 530.50 531.50 13
2004-06-04 Perforation 538.20 539.20 13
2004-06-04 Perforation 545.50 546.50 13
2002-08-26 Fracture 993.50 995.50 0
2004-06-04 Perforation 549.80 550.80 13
2004-06-04 Perforation 568.90 569.90 13
2004-06-04 Perforation 572.40 573.40 13
2004-06-04 Perforation 579.30 580.30 13
2004-06-04 Perforation 602.50 603.50 13
2004-06-04 Perforation 609.80 610.80 13
2004-06-04 Perforation 618.00 619.00 13
2004-06-04 Perforation 632.20 633.20 13
2004-06-04 Perforation 642.00 643.00 13
2004-06-04 Perforation 646.10 647.10 13
2002-09-09 Packing Device Capped w/Cement 982.00 990.00 0
2004-06-04 Perforation 652.80 653.80 13
2004-06-04 Perforation 662.50 663.50 13
2004-06-04 Perforation 676.80 677.80 13
2004-06-04 Perforation 680.50 681.50 13
2004-06-05 Perforation 399.50 400.50 13
2004-06-05 Perforation 395.50 396.50 13
2004-06-05 Perforation 384.00 385.00 13
2004-06-05 Perforation 380.50 381.50 13
2004-06-05 Perforation 371.00 372.00 13
2004-06-05 Perforation 315.50 316.50 13
2002-09-14 Perforation 963.50 965.50 7
2004-06-05 Perforation 273.00 274.00 13
2004-06-05 Perforation 265.00 266.00 13
2004-06-05 Perforation 260.50 261.50 13
2004-06-22 Fracture 405.50 681.50 0
2002-11-25 Packing Device Capped w/Cement 948.00 956.00 0
2002-12-06 Perforation 777.00 779.00 13
2003-01-14 Fracture 777.00 779.00 0
2003-02-05 Packing Device Capped w/Cement 767.00 775.00 0
2003-02-08 Perforation 767.50 769.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2611 0.0 0.0 0.0
2006 8751 0.0 0.0 0.0
2007 8576 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8743 0.0 0.0 0.0
2011 8754 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8728 0.0 0.0 0.0
2015 8694 0.0 0.0 0.0
2016 8724 0.0 0.0 0.0
2017 8579 0.0 0.0 0.0
2018 8697 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References