If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274262814000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.341115,"lon":-113.606131,"icon":""}]} |
| Location: 00/14-28-027-26W4/0 | |
| Location Alias: 00/14-28-27-26 W4M | |
| Location Alias 2: 00/14-28-027-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 28 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 14-28-27-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0309262 | |
| License Date: 2004-05-28 | |
| License Status: Issued | |
| Spud Date: 2005-01-12 | |
| Final Drill Date: 2005-01-17 | |
| Well Total Depth: 1010.00 m | |
| Surface Hole Latitude: 51.341115 | |
| Surface Hole Longitude: -113.606131 |
| Date | Event |
|---|---|
| 2004-05-28 | Obtained License |
| 2005-01-13 | Surface Casing Operation Performed |
| 2005-01-17 | Finished Drilling |
| 2005-01-17 | Production Casing Operation Performed |
| 2005-01-17 | Rig Released |
| 2005-01-17 | Well Mode changed to Drilled and Cased |
| 2005-01-31 | Well Log Performed |
| 2005-02-06 | Perforation Treatment Performed - Jet Perforation |
| 2005-04-23 | Perforation Treatment Performed - Fractured |
| 2005-04-27 | Well Fluid changed to Gas |
| 2005-04-27 | Well Mode changed to Testing |
| 2005-07-26 | Well Began Production |
| 2005-07-26 | Well Fluid changed to Gas |
| 2005-07-26 | Well Mode changed to Flowing |
| 2005-09-29 | Perforation Treatment Performed - Jet Perforation |
| 2005-10-12 | Perforation Treatment Performed - Fractured |
| 2005-11-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2005-11-02 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-02-06 | Perforation | 860.00 | 864.00 | 13 |
| 2005-09-29 | Perforation | 614.00 | 614.50 | 13 |
| 2005-09-29 | Perforation | 610.80 | 611.30 | 13 |
| 2005-09-29 | Perforation | 601.60 | 602.10 | 13 |
| 2005-09-29 | Perforation | 587.70 | 588.20 | 13 |
| 2005-09-29 | Perforation | 582.20 | 582.70 | 13 |
| 2005-09-29 | Perforation | 576.30 | 576.80 | 13 |
| 2005-09-29 | Perforation | 575.40 | 575.90 | 13 |
| 2005-09-29 | Perforation | 548.40 | 548.90 | 13 |
| 2005-09-29 | Perforation | 541.60 | 542.10 | 13 |
| 2005-09-29 | Perforation | 538.70 | 539.20 | 13 |
| 2005-02-06 | Perforation | 761.00 | 765.00 | 13 |
| 2005-09-29 | Perforation | 515.30 | 515.80 | 13 |
| 2005-09-29 | Perforation | 486.20 | 487.20 | 13 |
| 2005-09-29 | Perforation | 474.40 | 474.90 | 13 |
| 2005-09-29 | Perforation | 365.90 | 366.40 | 13 |
| 2005-09-29 | Perforation | 356.20 | 356.70 | 13 |
| 2005-09-29 | Perforation | 353.00 | 353.50 | 13 |
| 2005-09-29 | Perforation | 245.20 | 246.20 | 13 |
| 2005-09-29 | Perforation | 236.60 | 237.10 | 13 |
| 2005-09-29 | Perforation | 235.40 | 235.90 | 13 |
| 2005-10-12 | Fracture | 235.40 | 644.50 | 0 |
| 2005-02-06 | Perforation | 736.00 | 740.00 | 13 |
| 2005-02-06 | Perforation | 725.00 | 728.00 | 13 |
| 2005-04-23 | Fracture | 860.00 | 864.00 | 0 |
| 2005-04-23 | Fracture | 761.00 | 765.00 | 0 |
| 2005-09-29 | Perforation | 644.00 | 644.50 | 13 |
| 2005-09-29 | Perforation | 630.60 | 631.10 | 13 |
| 2005-09-29 | Perforation | 618.90 | 619.40 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 2832 | 0.0 | 0.0 | 0.0 |
| 2006 | 8751 | 0.0 | 0.0 | 0.0 |
| 2007 | 8576 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8743 | 0.0 | 0.0 | 0.0 |
| 2011 | 8754 | 0.0 | 0.0 | 0.0 |
| 2012 | 8638 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8728 | 0.0 | 0.0 | 0.0 |
| 2015 | 8694 | 0.0 | 0.0 | 0.0 |
| 2016 | 8724 | 0.0 | 0.0 | 0.0 |
| 2017 | 8580 | 0.0 | 0.0 | 0.0 |
| 2018 | 8697 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]