X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274262706020

Well Details

Well ID: 0274262706020
Loading map...
Location: 02/06-27-027-26W4/0
Location Alias: 02/06-27-27-26 W4M
Location Alias 2: 02/06-27-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 27
County/Municipality: Rocky View County
Well Name: EMBER 102 ENTICE 6-27-27-26
Operator Name: Ember Resources Inc.
License Number: 0269774
License Date: 2002-05-03
License Status: Issued
Spud Date: 2002-05-26
Final Drill Date: 2002-05-29
Well Total Depth: 696.00 m
Surface Hole Latitude: 51.334065
Surface Hole Longitude: -113.583407

For data sources see[1][2]

Well History

Date Event
2002-05-03 Obtained License
2002-05-26 Surface Casing Operation Performed
2002-05-29 Finished Drilling
2002-05-29 Production Casing Operation Performed
2002-05-29 Rig Released
2002-05-29 Well Mode changed to Drilled and Cased
2002-06-10 Well Log Performed
2002-06-26 Perforation Treatment Performed - Jet Perforation
2002-07-06 Perforation Treatment Performed - Fractured
2002-08-14 Well Log Performed
2003-06-04 Well Began Production
2003-06-04 Well Fluid changed to Gas
2003-06-04 Well Mode changed to Flowing
2003-11-23 Well Log Performed
2003-12-01 Well Fluid changed to Gas
2003-12-01 Well Mode changed to Suspended
2005-03-01 Well Fluid changed to Coalbed Methane-Coals Only
2005-03-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-06-26 Perforation 627.30 628.30 13
2002-06-26 Perforation 562.20 564.20 13
2002-06-26 Perforation 538.10 540.10 13
2002-06-26 Perforation 531.30 533.30 13
2002-06-26 Perforation 510.90 511.90 13
2002-06-26 Perforation 504.90 505.90 13
2002-06-26 Perforation 496.80 497.80 13
2002-06-26 Perforation 487.50 488.50 13
2002-06-26 Perforation 475.50 477.50 13
2002-06-26 Perforation 463.80 464.80 13
2002-06-26 Perforation 352.90 353.90 13
2002-06-26 Perforation 624.50 625.50 13
2002-06-26 Perforation 346.80 347.80 13
2002-06-26 Perforation 343.90 344.90 13
2002-06-26 Perforation 340.50 341.50 13
2002-06-26 Perforation 233.50 235.50 13
2002-06-26 Perforation 219.80 221.80 13
2002-07-06 Fracture 219.80 628.30 0
2002-06-26 Perforation 616.50 617.50 13
2002-06-26 Perforation 613.80 614.80 13
2002-06-26 Perforation 604.90 605.90 13
2002-06-26 Perforation 601.90 602.90 13
2002-06-26 Perforation 598.10 599.10 13
2002-06-26 Perforation 587.60 589.60 13
2002-06-26 Perforation 569.40 570.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 3980 0.0 0.0 0.0
2005 7343 0.0 0.0 0.0
2006 8712 0.0 0.0 0.0
2007 8689 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8722 0.0 0.0 0.0
2012 8715 0.0 0.0 0.0
2013 8752 0.0 0.0 0.0
2014 8625 0.0 0.0 0.0
2015 8614 0.0 0.0 0.0
2016 8698 0.0 0.0 0.0
2017 8544 0.0 0.0 0.0
2018 8638 0.0 0.0 0.0
2019 8659 0.0 0.0 0.0
2020 2108 0.0 0.0 0.0

For data sources see[5]

References