X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274262414000

Well Details

Well ID: 0274262414000
Loading map...
Location: 00/14-24-027-26W4/0
Location Alias: 00/14-24-27-26 W4M
Location Alias 2: 00/14-24-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 24
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 14-24-27-26
Operator Name: Ember Resources Inc.
License Number: 0305397
License Date: 2004-03-05
License Status: Issued
Spud Date: 2004-06-29
Final Drill Date: 2004-07-05
Well Total Depth: 744.00 m
Surface Hole Latitude: 51.328220
Surface Hole Longitude: -113.538507

For data sources see[1][2]

Well History

Date Event
2004-03-05 Obtained License
2004-06-29 Surface Casing Operation Performed
2004-07-05 Finished Drilling
2004-07-05 Well Mode changed to Drilled and Cased
2004-07-06 Production Casing Operation Performed
2004-07-06 Rig Released
2004-07-21 Well Log Performed
2004-09-16 Perforation Treatment Performed - Jet Perforation
2004-10-11 Perforation Treatment Performed - Fractured
2004-10-15 Well Fluid changed to Gas
2004-10-15 Well Mode changed to Testing
2005-04-08 Well Began Production
2005-04-08 Well Fluid changed to Gas
2005-04-08 Well Mode changed to Flowing
2005-07-03 Perforation Treatment Performed - Jet Perforation
2005-07-15 Perforation Treatment Performed - Fractured
2005-07-26 Well Fluid changed to Coalbed Methane-Coals and Other
2005-07-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-09-16 Perforation 542.50 545.50 14
2005-07-03 Perforation 217.80 218.30 13
2005-07-03 Perforation 317.30 317.80 13
2005-07-03 Perforation 324.20 324.70 13
2005-07-03 Perforation 443.30 443.80 13
2005-07-03 Perforation 453.70 454.20 13
2005-07-03 Perforation 460.40 460.90 13
2005-07-03 Perforation 471.40 471.90 13
2005-07-03 Perforation 480.00 480.50 13
2005-07-03 Perforation 494.50 495.00 13
2005-07-03 Perforation 517.70 518.20 13
2004-09-16 Perforation 667.50 670.50 14
2005-07-03 Perforation 520.00 520.50 13
2005-07-03 Perforation 554.40 554.90 13
2005-07-03 Perforation 559.90 560.40 13
2005-07-03 Perforation 570.70 571.20 13
2005-07-03 Perforation 572.10 572.60 13
2005-07-03 Perforation 580.20 580.70 13
2005-07-03 Perforation 585.80 586.30 13
2005-07-03 Perforation 587.80 588.30 13
2005-07-03 Perforation 598.60 599.10 13
2005-07-03 Perforation 600.00 600.50 13
2004-09-16 Perforation 685.50 688.50 14
2005-07-03 Perforation 615.60 616.10 13
2005-07-15 Fracture 205.70 616.10 0
2004-09-16 Perforation 698.00 702.00 14
2004-10-11 Fracture 698.00 702.00 0
2004-10-11 Fracture 685.50 688.50 0
2004-10-11 Fracture 542.50 545.50 0
2005-07-03 Perforation 205.70 206.20 13
2005-07-03 Perforation 207.20 207.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5832 0.0 0.0 0.0
2006 8712 0.0 0.0 0.0
2007 8689 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8722 0.0 0.0 0.0
2012 8571 0.0 0.0 0.0
2013 8752 0.0 0.0 0.0
2014 8625 0.0 0.0 0.0
2015 8614 0.0 0.0 0.0
2016 8698 0.0 0.0 0.0
2017 8544 0.0 0.0 0.0
2018 8638 0.0 0.0 0.0
2019 8659 0.0 0.0 0.0
2020 2108 0.0 0.0 0.0

For data sources see[5]

References