If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274261915002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.327391,"lon":-113.649451,"icon":""}]} |
| Location: 00/15-19-027-26W4/2 | |
| Location Alias: 00/15-19-27-26 W4M | |
| Location Alias 2: 00/15-19-027-26 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 19 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 15-19-27-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0307179 | |
| License Date: 2004-04-13 | |
| License Status: Issued | |
| Spud Date: 2004-11-01 | |
| Final Drill Date: 2005-01-06 | |
| Well Total Depth: 819.00 m | |
| Surface Hole Latitude: 51.327391 | |
| Surface Hole Longitude: -113.649451 |
| Date | Event |
|---|---|
| 2004-04-13 | Obtained License |
| 2004-11-01 | Surface Casing Operation Performed |
| 2005-01-06 | Finished Drilling |
| 2005-01-06 | Well Mode changed to Drilled and Cased |
| 2005-01-07 | Production Casing Operation Performed |
| 2005-01-07 | Rig Released |
| 2005-01-19 | Well Log Performed |
| 2005-02-05 | Perforation Treatment Performed - Jet Perforation |
| 2005-02-18 | Perforation Treatment Performed - Fractured |
| 2005-03-19 | Perforation Treatment Performed - Fractured |
| 2007-02-03 | Perforation Treatment Performed - Jet Perforation |
| 2007-02-11 | Perforation Treatment Performed - Fractured |
| 2007-02-21 | Well Began Production |
| 2007-02-21 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2007-02-21 | Well Mode changed to Flowing |
| 2017-04-24 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2017-04-24 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-02-05 | Perforation | 772.00 | 775.00 | 13 |
| 2007-02-03 | Perforation | 618.50 | 619.00 | 13 |
| 2007-02-03 | Perforation | 611.10 | 613.10 | 13 |
| 2007-02-03 | Perforation | 586.00 | 586.50 | 13 |
| 2007-02-03 | Perforation | 580.20 | 580.70 | 13 |
| 2007-02-03 | Perforation | 577.40 | 577.90 | 13 |
| 2007-02-03 | Perforation | 554.00 | 554.50 | 13 |
| 2007-02-03 | Perforation | 524.40 | 524.90 | 13 |
| 2007-02-03 | Perforation | 520.80 | 521.80 | 13 |
| 2007-02-03 | Perforation | 401.50 | 402.00 | 13 |
| 2007-02-03 | Perforation | 385.60 | 386.10 | 13 |
| 2005-02-18 | Fracture | 772.00 | 775.00 | 0 |
| 2007-02-03 | Perforation | 320.90 | 321.40 | 13 |
| 2007-02-03 | Perforation | 277.90 | 278.40 | 13 |
| 2007-02-03 | Perforation | 275.10 | 275.60 | 13 |
| 2007-02-03 | Perforation | 270.40 | 270.90 | 13 |
| 2007-02-03 | Perforation | 264.30 | 264.80 | 13 |
| 2007-02-03 | Perforation | 263.30 | 263.60 | 13 |
| 2007-02-03 | Perforation | 260.60 | 261.10 | 13 |
| 2007-02-11 | Fracture | 260.60 | 685.50 | 0 |
| 2005-03-19 | Fracture | 772.00 | 775.00 | 0 |
| 2007-02-03 | Perforation | 685.00 | 685.50 | 13 |
| 2007-02-03 | Perforation | 669.10 | 670.10 | 13 |
| 2007-02-03 | Perforation | 652.80 | 653.30 | 13 |
| 2007-02-03 | Perforation | 648.50 | 649.50 | 13 |
| 2007-02-03 | Perforation | 639.10 | 639.60 | 13 |
| 2007-02-03 | Perforation | 623.00 | 623.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 7352 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8719 | 0.0 | 0.0 | 0.0 |
| 2011 | 8754 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8728 | 0.0 | 0.0 | 0.0 |
| 2015 | 8694 | 0.0 | 0.0 | 0.0 |
| 2016 | 8724 | 0.0 | 0.0 | 0.0 |
| 2017 | 8580 | 0.0 | 0.0 | 0.0 |
| 2018 | 8697 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]