If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274261301020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.303102,"lon":-113.526827,"icon":""}]} |
Location: 02/01-13-027-26W4/0 | |
Location Alias: 02/01-13-27-26 W4M | |
Location Alias 2: 02/01-13-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 13 | |
County/Municipality: Rocky View County | |
Well Name: EMBER 102 ENTICE 1-13-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0310400 | |
License Date: 2004-06-16 | |
License Status: Issued | |
Spud Date: 2004-07-01 | |
Final Drill Date: 2004-07-23 | |
Well Total Depth: 744.00 m | |
Surface Hole Latitude: 51.303102 | |
Surface Hole Longitude: -113.526827 |
Date | Event |
---|---|
2004-06-16 | Obtained License |
2004-07-01 | Surface Casing Operation Performed |
2004-07-23 | Finished Drilling |
2004-07-23 | Well Mode changed to Drilled and Cased |
2004-07-24 | Production Casing Operation Performed |
2004-07-24 | Rig Released |
2004-09-11 | Well Log Performed |
2004-10-18 | Perforation Treatment Performed - Jet Perforation |
2004-10-29 | Perforation Treatment Performed - Jet Perforation |
2005-01-15 | Perforation Treatment Performed - Jet Perforation |
2005-02-10 | Perforation Treatment Performed - Fractured |
2005-02-27 | Well Began Production |
2005-02-27 | Well Fluid changed to Gas |
2005-02-27 | Well Mode changed to Flowing |
2005-06-29 | Perforation Treatment Performed - Jet Perforation |
2005-07-07 | Perforation Treatment Performed - Fractured |
2005-07-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-07-20 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-10-18 | Perforation | 697.00 | 701.00 | 13 |
2005-06-29 | Perforation | 571.10 | 572.10 | 13 |
2005-06-29 | Perforation | 561.10 | 561.60 | 13 |
2005-06-29 | Perforation | 555.00 | 555.50 | 13 |
2005-06-29 | Perforation | 533.90 | 534.40 | 13 |
2005-06-29 | Perforation | 515.20 | 515.70 | 13 |
2005-06-29 | Perforation | 514.20 | 514.70 | 13 |
2005-06-29 | Perforation | 493.70 | 494.20 | 13 |
2005-06-29 | Perforation | 488.30 | 488.80 | 13 |
2005-06-29 | Perforation | 482.20 | 482.70 | 13 |
2005-06-29 | Perforation | 472.50 | 473.00 | 13 |
2004-10-29 | Perforation | 637.00 | 640.00 | 14 |
2005-06-29 | Perforation | 467.60 | 468.10 | 13 |
2005-06-29 | Perforation | 462.60 | 463.10 | 13 |
2005-06-29 | Perforation | 448.50 | 449.00 | 13 |
2005-06-29 | Perforation | 447.10 | 447.60 | 13 |
2005-06-29 | Perforation | 390.90 | 391.40 | 13 |
2005-06-29 | Perforation | 369.00 | 369.50 | 13 |
2005-06-29 | Perforation | 347.80 | 348.30 | 13 |
2005-06-29 | Perforation | 335.60 | 336.10 | 13 |
2005-06-29 | Perforation | 333.60 | 334.10 | 13 |
2005-06-29 | Perforation | 330.80 | 331.30 | 13 |
2005-01-15 | Perforation | 545.00 | 548.00 | 13 |
2005-06-29 | Perforation | 326.00 | 326.50 | 13 |
2005-06-29 | Perforation | 225.50 | 226.00 | 13 |
2005-06-29 | Perforation | 215.00 | 215.50 | 13 |
2005-06-29 | Perforation | 213.30 | 213.80 | 13 |
2005-07-07 | Fracture | 213.30 | 614.30 | 0 |
2005-02-10 | Fracture | 545.00 | 548.00 | 0 |
2005-06-29 | Perforation | 613.80 | 614.30 | 13 |
2005-06-29 | Perforation | 596.70 | 597.20 | 13 |
2005-06-29 | Perforation | 588.10 | 588.60 | 13 |
2005-06-29 | Perforation | 584.50 | 585.00 | 13 |
2005-06-29 | Perforation | 579.70 | 580.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 6839 | 0.0 | 0.0 | 0.0 |
2006 | 8712 | 0.0 | 0.0 | 0.0 |
2007 | 8689 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8722 | 0.0 | 0.0 | 0.0 |
2012 | 8739 | 0.0 | 0.0 | 0.0 |
2013 | 8752 | 0.0 | 0.0 | 0.0 |
2014 | 8625 | 0.0 | 0.0 | 0.0 |
2015 | 8614 | 0.0 | 0.0 | 0.0 |
2016 | 8698 | 0.0 | 0.0 | 0.0 |
2017 | 8544 | 0.0 | 0.0 | 0.0 |
2018 | 8637 | 0.0 | 0.0 | 0.0 |
2019 | 8659 | 0.0 | 0.0 | 0.0 |
2020 | 2108 | 0.0 | 0.0 | 0.0 |
For data sources see[5]