X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274261006000

Well Details

Well ID: 0274261006000
Loading map...
Location: 00/06-10-027-26W4/0
Location Alias: 00/06-10-27-26 W4M
Location Alias 2: 00/06-10-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 10
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 6-10-27-26
Operator Name: Ember Resources Inc.
License Number: 0315348
License Date: 2004-09-27
License Status: Issued
Spud Date: 2005-01-11
Final Drill Date: 2005-01-12
Well Total Depth: 789.00 m
Surface Hole Latitude: 51.289957
Surface Hole Longitude: -113.581842

For data sources see[1][2]

Well History

Date Event
2004-09-27 Obtained License
2005-01-11 Surface Casing Operation Performed
2005-01-12 Finished Drilling
2005-01-12 Production Casing Operation Performed
2005-01-12 Rig Released
2005-01-12 Well Mode changed to Drilled and Cased
2005-01-19 Well Log Performed
2005-02-19 Perforation Treatment Performed - Jet Perforation
2005-02-27 Well Fluid changed to Gas
2005-02-27 Well Mode changed to Testing
2005-05-09 Well Began Production
2005-05-09 Well Fluid changed to Gas
2005-05-09 Well Mode changed to Flowing
2005-07-05 Perforation Treatment Performed - Jet Perforation
2005-07-06 Perforation Treatment Performed - Fractured
2005-07-19 Well Fluid changed to Coalbed Methane-Coals and Other
2005-07-19 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-19 Perforation 722.00 725.00 13
2005-07-05 Perforation 575.10 575.60 13
2005-07-05 Perforation 569.60 570.10 13
2005-07-05 Perforation 566.40 566.90 13
2005-07-05 Perforation 542.20 542.70 13
2005-07-05 Perforation 536.30 536.80 13
2005-07-05 Perforation 535.30 535.80 13
2005-07-05 Perforation 514.40 514.90 13
2005-07-05 Perforation 507.30 507.80 13
2005-07-05 Perforation 485.60 486.10 13
2005-07-05 Perforation 481.20 481.70 13
2005-07-05 Perforation 650.20 650.70 13
2005-07-05 Perforation 475.40 475.90 13
2005-07-05 Perforation 469.40 469.90 13
2005-07-05 Perforation 464.90 465.40 13
2005-07-05 Perforation 415.00 415.50 13
2005-07-05 Perforation 413.70 414.20 13
2005-07-05 Perforation 362.20 362.70 13
2005-07-05 Perforation 352.30 352.80 13
2005-07-05 Perforation 349.80 350.30 13
2005-07-05 Perforation 341.50 342.00 13
2005-07-05 Perforation 284.90 285.40 13
2005-07-05 Perforation 644.10 644.60 13
2005-07-05 Perforation 242.60 243.10 13
2005-07-05 Perforation 226.50 227.00 13
2005-07-05 Perforation 224.50 225.00 13
2005-07-05 Perforation 222.20 222.70 13
2005-07-06 Fracture 222.20 650.70 0
2005-07-05 Perforation 628.70 629.20 13
2005-07-05 Perforation 626.70 627.20 13
2005-07-05 Perforation 609.20 609.70 13
2005-07-05 Perforation 605.30 605.80 13
2005-07-05 Perforation 596.40 596.90 13
2005-07-05 Perforation 582.20 582.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5059 0.0 0.0 0.0
2006 8743 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8743 0.0 0.0 0.0
2011 8755 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8716 0.0 0.0 0.0
2015 8696 0.0 0.0 0.0
2016 8621 0.0 0.0 0.0
2017 8627 0.0 0.0 0.0
2018 8721 0.0 0.0 0.0
2019 8650 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

References