X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274260706000

Well Details

Well ID: 0274260706000
Loading map...
Location: 00/06-07-027-26W4/0
Location Alias: 00/06-07-27-26 W4M
Location Alias 2: 00/06-07-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 07
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 6-7-27-26
Operator Name: Ember Resources Inc.
License Number: 0307560
License Date: 2004-04-22
License Status: Issued
Spud Date: 2004-09-18
Final Drill Date: 2004-09-22
Well Total Depth: 798.00 m
Surface Hole Latitude: 51.291881
Surface Hole Longitude: -113.652597

For data sources see[1][2]

Well History

Date Event
2004-04-22 Obtained License
2004-09-18 Surface Casing Operation Performed
2004-09-22 Finished Drilling
2004-09-22 Production Casing Operation Performed
2004-09-22 Rig Released
2004-09-22 Well Mode changed to Drilled and Cased
2004-10-02 Well Log Performed
2004-10-27 Perforation Treatment Performed - Jet Perforation
2004-11-11 Perforation Treatment Performed - Fractured
2005-05-29 Well Began Production
2005-05-29 Well Fluid changed to Coalbed Methane-Coals Only
2005-05-29 Well Mode changed to Flowing
2007-10-12 Well Log Performed
2009-02-02 Well Log Performed
2009-09-09 Well Log Performed
2010-08-12 Well Log Performed
2013-10-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-10-27 Perforation 688.40 688.90 13
2004-10-27 Perforation 612.70 613.20 13
2004-10-27 Perforation 611.10 611.60 13
2004-10-27 Perforation 591.50 592.00 13
2004-10-27 Perforation 582.70 583.20 13
2004-10-27 Perforation 580.30 580.80 13
2004-10-27 Perforation 565.00 565.50 13
2004-10-27 Perforation 556.80 557.30 13
2004-10-27 Perforation 537.70 538.20 13
2004-10-27 Perforation 531.30 531.80 13
2004-10-27 Perforation 527.80 528.30 13
2004-10-27 Perforation 685.50 686.00 13
2004-10-27 Perforation 526.60 527.10 13
2004-10-27 Perforation 519.10 519.60 13
2004-10-27 Perforation 515.60 516.10 13
2004-10-27 Perforation 398.70 399.20 13
2004-10-27 Perforation 394.00 394.50 13
2004-10-27 Perforation 391.70 392.20 13
2004-10-27 Perforation 387.10 387.60 13
2004-10-27 Perforation 377.50 378.00 13
2004-10-27 Perforation 321.10 321.60 13
2004-10-27 Perforation 239.10 239.60 13
2004-10-27 Perforation 674.70 675.20 13
2004-10-27 Perforation 236.20 236.70 13
2004-11-11 Fracture 236.20 688.90 0
2004-10-27 Perforation 672.80 673.30 13
2004-10-27 Perforation 653.60 654.10 13
2004-10-27 Perforation 648.80 649.30 13
2004-10-27 Perforation 639.90 640.40 13
2004-10-27 Perforation 620.90 621.40 13
2004-10-27 Perforation 613.50 614.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5123 0.0 0.0 0.0
2006 8743 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8543 0.0 0.0 0.0
2010 8239 0.0 0.0 0.0
2011 8755 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8716 0.0 0.0 0.0
2015 8696 0.0 0.0 0.0
2016 8621 0.0 0.0 0.0
2017 8627 0.0 0.0 0.0
2018 8721 0.0 0.0 0.0
2019 8650 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

References