If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274260607000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.27638,"lon":-113.631416,"icon":""}]} |
Location: 00/07-06-027-26W4/0 | |
Location Alias: 00/07-06-27-26 W4M | |
Location Alias 2: 00/07-06-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 06 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 7-6-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0438278 | |
License Date: 2011-11-01 | |
License Status: Issued | |
Spud Date: 2012-01-16 | |
Final Drill Date: 2012-01-18 | |
Well Total Depth: 1391.00 m | |
Surface Hole Latitude: 51.276380 | |
Surface Hole Longitude: -113.631416 |
Date | Event |
---|---|
2011-11-01 | Obtained License |
2012-01-16 | Direction Drilling Operation Performed - Deviate |
2012-01-16 | Surface Casing Operation Performed |
2012-01-18 | Finished Drilling |
2012-01-18 | Production Casing Operation Performed |
2012-01-18 | Rig Released |
2012-01-18 | Well Mode changed to Drilled and Cased |
2012-01-25 | Well Log Performed |
2012-02-19 | Perforation Treatment Performed - Jet Perforation |
2012-02-20 | Perforation Treatment Performed - Fractured |
2012-02-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-22 | Well Mode changed to Testing |
2012-05-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-05-22 | Well Mode changed to Test Completed |
2013-04-27 | Well Began Production |
2013-04-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2013-04-27 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-16 | Precision Drilling Corporation | 239 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-16 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-19 | Perforation | 304.00 | 306.00 | 13 |
2012-02-19 | Perforation | 521.20 | 521.70 | 13 |
2012-02-19 | Perforation | 533.00 | 533.50 | 13 |
2012-02-19 | Perforation | 535.50 | 537.00 | 13 |
2012-02-19 | Perforation | 539.90 | 540.90 | 13 |
2012-02-19 | Perforation | 547.20 | 547.70 | 13 |
2012-02-19 | Perforation | 609.00 | 609.50 | 13 |
2012-02-19 | Perforation | 648.50 | 651.50 | 13 |
2012-02-19 | Perforation | 662.00 | 665.00 | 13 |
2012-02-19 | Perforation | 685.00 | 685.50 | 13 |
2012-02-19 | Perforation | 688.10 | 688.60 | 13 |
2012-02-19 | Perforation | 334.90 | 335.40 | 13 |
2012-02-19 | Perforation | 690.60 | 691.10 | 13 |
2012-02-19 | Perforation | 691.40 | 691.90 | 13 |
2012-02-19 | Perforation | 694.90 | 695.90 | 13 |
2012-02-19 | Perforation | 703.50 | 705.50 | 13 |
2012-02-19 | Perforation | 709.10 | 709.60 | 13 |
2012-02-19 | Perforation | 742.20 | 743.20 | 13 |
2012-02-19 | Perforation | 753.10 | 753.60 | 13 |
2012-02-19 | Perforation | 762.00 | 764.00 | 13 |
2012-02-19 | Perforation | 770.00 | 771.00 | 13 |
2012-02-19 | Perforation | 780.40 | 781.90 | 13 |
2012-02-19 | Perforation | 344.60 | 346.10 | 13 |
2012-02-19 | Perforation | 782.10 | 783.10 | 13 |
2012-02-19 | Perforation | 793.00 | 794.50 | 13 |
2012-02-19 | Perforation | 818.50 | 820.00 | 13 |
2012-02-19 | Perforation | 824.10 | 825.60 | 13 |
2012-02-19 | Perforation | 832.90 | 833.40 | 13 |
2012-02-19 | Perforation | 840.90 | 841.40 | 13 |
2012-02-19 | Perforation | 857.50 | 859.50 | 13 |
2012-02-19 | Perforation | 869.40 | 870.90 | 13 |
2012-02-19 | Perforation | 874.70 | 875.20 | 13 |
2012-02-19 | Perforation | 889.20 | 889.70 | 13 |
2012-02-19 | Perforation | 350.00 | 352.00 | 13 |
2012-02-19 | Perforation | 902.20 | 902.70 | 13 |
2012-02-19 | Perforation | 905.30 | 906.30 | 13 |
2012-02-19 | Perforation | 922.60 | 923.10 | 13 |
2012-02-19 | Perforation | 923.40 | 923.90 | 13 |
2012-02-19 | Perforation | 932.60 | 933.10 | 13 |
2012-02-19 | Perforation | 943.40 | 943.90 | 13 |
2012-02-20 | Fracture | 334.90 | 943.90 | 0 |
2012-02-19 | Perforation | 365.10 | 365.60 | 13 |
2012-02-19 | Perforation | 429.70 | 430.70 | 13 |
2012-02-19 | Perforation | 483.30 | 483.80 | 13 |
2012-02-19 | Perforation | 507.80 | 508.80 | 13 |
2012-02-19 | Perforation | 515.00 | 515.50 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 48 | 0.0 | 0.0 | 0.0 |
2013 | 5976 | 0.0 | 0.0 | 0.0 |
2014 | 8716 | 0.0 | 0.0 | 0.0 |
2015 | 8696 | 0.0 | 0.0 | 0.0 |
2016 | 8621 | 0.0 | 0.0 | 0.0 |
2017 | 8627 | 0.0 | 0.0 | 0.0 |
2018 | 8721 | 0.0 | 0.0 | 0.0 |
2019 | 8650 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[7]