If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274260506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.276165,"lon":-113.631521,"icon":""}]} |
Location: 00/06-05-027-26W4/0 | |
Location Alias: 00/06-05-27-26 W4M | |
Location Alias 2: 00/06-05-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 05 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 6-5-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0438276 | |
License Date: 2011-11-01 | |
License Status: Issued | |
Spud Date: 2012-01-21 | |
Final Drill Date: 2012-01-22 | |
Well Total Depth: 1031.00 m | |
Surface Hole Latitude: 51.276165 | |
Surface Hole Longitude: -113.631521 |
Date | Event |
---|---|
2011-11-01 | Obtained License |
2012-01-21 | Surface Casing Operation Performed |
2012-01-22 | Finished Drilling |
2012-01-22 | Production Casing Operation Performed |
2012-01-22 | Rig Released |
2012-01-22 | Well Mode changed to Drilled and Cased |
2012-01-25 | Well Log Performed |
2012-02-15 | Perforation Treatment Performed - Jet Perforation |
2012-02-21 | Perforation Treatment Performed - Fractured |
2012-02-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-22 | Well Mode changed to Testing |
2012-03-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-22 | Well Mode changed to Test Completed |
2013-04-27 | Well Began Production |
2013-04-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2013-04-27 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-21 | Precision Drilling Corporation | 239 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-15 | Perforation | 216.00 | 218.00 | 13 |
2012-02-15 | Perforation | 398.70 | 399.70 | 13 |
2012-02-15 | Perforation | 444.00 | 444.50 | 13 |
2012-02-15 | Perforation | 486.50 | 488.50 | 13 |
2012-02-15 | Perforation | 499.40 | 499.90 | 13 |
2012-02-15 | Perforation | 502.60 | 503.10 | 13 |
2012-02-15 | Perforation | 505.80 | 506.30 | 13 |
2012-02-15 | Perforation | 513.50 | 515.00 | 13 |
2012-02-15 | Perforation | 526.00 | 526.50 | 13 |
2012-02-15 | Perforation | 529.70 | 530.20 | 13 |
2012-02-15 | Perforation | 542.20 | 542.70 | 13 |
2012-02-15 | Perforation | 253.50 | 255.00 | 13 |
2012-02-15 | Perforation | 550.50 | 551.00 | 13 |
2012-02-15 | Perforation | 570.40 | 571.90 | 13 |
2012-02-15 | Perforation | 579.40 | 580.40 | 13 |
2012-02-15 | Perforation | 596.20 | 597.20 | 13 |
2012-02-15 | Perforation | 601.50 | 603.00 | 13 |
2012-02-15 | Perforation | 608.40 | 608.90 | 13 |
2012-02-15 | Perforation | 614.40 | 614.90 | 13 |
2012-02-15 | Perforation | 626.00 | 627.00 | 13 |
2012-02-15 | Perforation | 635.00 | 636.50 | 13 |
2012-02-15 | Perforation | 639.10 | 639.60 | 13 |
2012-02-15 | Perforation | 288.00 | 289.00 | 13 |
2012-02-15 | Perforation | 648.40 | 648.90 | 13 |
2012-02-15 | Perforation | 649.60 | 650.10 | 13 |
2012-02-15 | Perforation | 657.70 | 658.20 | 13 |
2012-02-15 | Perforation | 660.00 | 660.50 | 13 |
2012-02-15 | Perforation | 673.00 | 673.50 | 13 |
2012-02-15 | Perforation | 679.30 | 679.80 | 13 |
2012-02-21 | Fracture | 253.50 | 679.80 | 0 |
2012-02-15 | Perforation | 312.90 | 313.40 | 13 |
2012-02-15 | Perforation | 342.00 | 345.00 | 13 |
2012-02-15 | Perforation | 369.10 | 370.10 | 13 |
2012-02-15 | Perforation | 378.50 | 379.00 | 13 |
2012-02-15 | Perforation | 388.00 | 388.50 | 13 |
2012-02-15 | Perforation | 393.00 | 394.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 48 | 0.0 | 0.0 | 0.0 |
2013 | 5976 | 0.0 | 0.0 | 0.0 |
2014 | 8716 | 0.0 | 0.0 | 0.0 |
2015 | 8696 | 0.0 | 0.0 | 0.0 |
2016 | 8621 | 0.0 | 0.0 | 0.0 |
2017 | 8627 | 0.0 | 0.0 | 0.0 |
2018 | 8721 | 0.0 | 0.0 | 0.0 |
2019 | 8650 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[6]