If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274260403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.271851,"lon":-113.605785,"icon":""}]} |
Location: 00/03-04-027-26W4/0 | |
Location Alias: 00/03-04-27-26 W4M | |
Location Alias 2: 00/03-04-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 04 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 3-4-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0438627 | |
License Date: 2011-11-08 | |
License Status: Issued | |
Spud Date: 2012-01-20 | |
Final Drill Date: 2012-01-21 | |
Well Total Depth: 1040.00 m | |
Surface Hole Latitude: 51.271851 | |
Surface Hole Longitude: -113.605785 |
Date | Event |
---|---|
2011-11-08 | Obtained License |
2012-01-20 | Surface Casing Operation Performed |
2012-01-21 | Finished Drilling |
2012-01-21 | Production Casing Operation Performed |
2012-01-21 | Rig Released |
2012-01-21 | Well Mode changed to Drilled and Cased |
2012-01-28 | Well Log Performed |
2012-02-10 | Perforation Treatment Performed - Jet Perforation |
2012-02-17 | Perforation Treatment Performed - Fractured |
2012-02-23 | Perforation Treatment Performed - Jet Perforation |
2012-02-25 | Perforation Treatment Performed - Fractured |
2012-02-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-27 | Well Mode changed to Testing |
2012-03-09 | Well Began Production |
2012-03-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-09 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-20 | Precision Drilling Corporation | 255 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-10 | Perforation | 548.50 | 551.50 | 13 |
2012-02-23 | Perforation | 379.30 | 380.30 | 13 |
2012-02-23 | Perforation | 385.90 | 386.90 | 13 |
2012-02-23 | Perforation | 397.50 | 400.00 | 13 |
2012-02-23 | Perforation | 430.30 | 430.80 | 13 |
2012-02-23 | Perforation | 472.00 | 474.00 | 13 |
2012-02-23 | Perforation | 481.40 | 481.90 | 13 |
2012-02-23 | Perforation | 485.50 | 486.00 | 13 |
2012-02-23 | Perforation | 489.00 | 490.50 | 13 |
2012-02-23 | Perforation | 498.80 | 499.80 | 13 |
2012-02-23 | Perforation | 511.30 | 511.80 | 13 |
2012-02-10 | Perforation | 602.00 | 605.00 | 13 |
2012-02-23 | Perforation | 527.00 | 528.00 | 13 |
2012-02-23 | Perforation | 532.70 | 533.20 | 13 |
2012-02-23 | Perforation | 535.50 | 536.00 | 13 |
2012-02-23 | Perforation | 554.30 | 555.80 | 13 |
2012-02-23 | Perforation | 561.90 | 563.40 | 13 |
2012-02-23 | Perforation | 582.10 | 582.60 | 13 |
2012-02-23 | Perforation | 587.70 | 588.70 | 13 |
2012-02-23 | Perforation | 593.50 | 594.50 | 13 |
2012-02-23 | Perforation | 614.50 | 615.50 | 13 |
2012-02-23 | Perforation | 623.30 | 624.30 | 13 |
2012-02-17 | Fracture | 548.50 | 551.50 | 0 |
2012-02-23 | Perforation | 627.00 | 628.00 | 13 |
2012-02-23 | Perforation | 633.40 | 633.90 | 13 |
2012-02-23 | Perforation | 641.90 | 642.40 | 13 |
2012-02-23 | Perforation | 663.00 | 663.50 | 13 |
2012-02-23 | Perforation | 664.40 | 664.90 | 13 |
2012-02-23 | Perforation | 668.90 | 669.40 | 13 |
2012-02-25 | Fracture | 302.00 | 669.40 | 0 |
2012-02-17 | Fracture | 602.00 | 605.00 | 0 |
2012-02-23 | Perforation | 210.00 | 212.50 | 13 |
2012-02-23 | Perforation | 302.00 | 302.50 | 13 |
2012-02-23 | Perforation | 358.90 | 360.40 | 13 |
2012-02-23 | Perforation | 364.80 | 365.30 | 13 |
2012-02-23 | Perforation | 368.50 | 369.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7204 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8716 | 0.0 | 0.0 | 0.0 |
2015 | 8696 | 0.0 | 0.0 | 0.0 |
2016 | 8621 | 0.0 | 0.0 | 0.0 |
2017 | 8628 | 0.0 | 0.0 | 0.0 |
2018 | 8721 | 0.0 | 0.0 | 0.0 |
2019 | 8650 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[6]