X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274240602002

Well Details

Well ID: 0274240602002
Loading map...
Location: 00/02-06-027-24W4/2
Location Alias: 00/02-06-27-24 W4M
Location Alias 2: 00/02-06-027-24 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 24
Section: 06
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 2-6-27-24
Operator Name: Ember Resources Inc.
License Number: 0333224
License Date: 2005-06-20
License Status: Issued
Spud Date: 2005-07-23
Final Drill Date: 2005-08-02
Well Total Depth: 739.00 m
Surface Hole Latitude: 51.271167
Surface Hole Longitude: -113.366634

For data sources see[1][2]

Well History

Date Event
2005-06-20 Obtained License
2005-07-23 Surface Casing Operation Performed
2005-08-02 Finished Drilling
2005-08-02 Production Casing Operation Performed
2005-08-02 Rig Released
2005-08-02 Well Mode changed to Drilled and Cased
2005-08-06 Well Log Performed
2005-08-20 Perforation Treatment Performed - Jet Perforation
2005-08-30 Perforation Treatment Performed - Jet Perforation
2005-11-06 Perforation Treatment Performed - Jet Perforation
2005-11-29 Perforation Treatment Performed - Fractured
2006-02-01 Well Began Production
2006-02-01 Well Fluid changed to Coalbed Methane-Coals and Other
2006-02-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-20 Perforation 539.00 540.00 13
2005-11-06 Perforation 492.90 493.40 13
2005-11-06 Perforation 490.80 491.30 13
2005-11-06 Perforation 484.60 485.10 13
2005-11-06 Perforation 451.30 451.80 13
2005-11-06 Perforation 449.70 450.20 13
2005-11-06 Perforation 442.70 443.20 13
2005-11-06 Perforation 437.80 438.30 13
2005-11-06 Perforation 435.40 435.90 13
2005-11-06 Perforation 431.80 432.30 13
2005-11-06 Perforation 421.50 422.00 13
2005-08-30 Perforation 528.00 530.00 13
2005-11-06 Perforation 411.10 411.60 13
2005-11-06 Perforation 408.70 409.20 13
2005-11-06 Perforation 407.70 408.20 13
2005-11-06 Perforation 398.30 398.80 13
2005-11-06 Perforation 393.90 394.40 13
2005-11-06 Perforation 392.50 393.00 13
2005-11-06 Perforation 347.10 347.60 13
2005-11-06 Perforation 338.30 338.80 13
2005-11-06 Perforation 291.80 292.30 13
2005-11-06 Perforation 287.20 287.70 13
2005-11-06 Perforation 567.70 568.20 13
2005-11-06 Perforation 277.70 278.20 13
2005-11-06 Perforation 274.50 275.00 13
2005-11-06 Perforation 268.80 269.30 13
2005-11-06 Perforation 267.90 268.40 13
2005-11-06 Perforation 260.20 260.70 13
2005-11-06 Perforation 209.60 210.10 13
2005-11-29 Fracture 209.60 568.20 0
2005-11-06 Perforation 563.50 564.00 13
2005-11-06 Perforation 555.70 556.20 13
2005-11-06 Perforation 521.10 521.60 13
2005-11-06 Perforation 518.20 518.70 13
2005-11-06 Perforation 504.00 504.50 13
2005-11-06 Perforation 495.70 496.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7959 0.0 0.0 0.0
2007 6938 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8719 0.0 0.0 0.0
2012 4971 0.0 0.0 0.0
2013 8758 0.0 0.0 0.0
2014 8719 0.0 0.0 0.0
2015 8717 0.0 0.0 0.0
2016 8704 0.0 0.0 0.0
2017 8599 0.0 0.0 0.0
2018 8708 0.0 0.0 0.0
2019 8717 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[5]

References