X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274233206000

Well Details

Well ID: 0274233206000
Loading map...
Location: 00/06-32-027-23W4/0
Location Alias: 00/06-32-27-23 W4M
Location Alias 2: 00/06-32-027-23 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 23
Section: 32
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 6-32-27-23
Operator Name: Ember Resources Inc.
License Number: 0330478
License Date: 2005-05-05
License Status: Issued
Spud Date: 2005-05-22
Final Drill Date: 2005-05-24
Well Total Depth: 629.00 m
Surface Hole Latitude: 51.350171
Surface Hole Longitude: -113.204818

For data sources see[1][2]

Well History

Date Event
2005-05-05 Obtained License
2005-05-22 Surface Casing Operation Performed
2005-05-24 Finished Drilling
2005-05-24 Well Mode changed to Drilled and Cased
2005-05-25 Production Casing Operation Performed
2005-05-25 Rig Released
2005-05-28 Well Log Performed
2005-05-29 Well Log Performed
2005-06-23 Perforation Treatment Performed - Jet Perforation
2005-07-24 Perforation Treatment Performed - Jet Perforation
2005-07-28 Perforation Treatment Performed - Fractured
2005-08-12 Well Began Production
2005-08-12 Well Fluid changed to Coalbed Methane-Coals and Other
2005-08-12 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-23 Perforation 549.00 553.00 13
2005-07-24 Perforation 443.50 444.00 13
2005-07-24 Perforation 435.80 436.30 13
2005-07-24 Perforation 426.60 427.10 13
2005-07-24 Perforation 417.20 417.70 13
2005-07-24 Perforation 369.00 369.50 13
2005-07-24 Perforation 364.60 365.10 13
2005-07-24 Perforation 360.80 361.30 13
2005-07-24 Perforation 358.90 359.40 13
2005-07-24 Perforation 356.80 357.30 13
2005-07-24 Perforation 354.80 355.30 13
2005-07-24 Perforation 507.70 508.20 13
2005-07-24 Perforation 352.60 353.10 13
2005-07-24 Perforation 332.90 333.40 13
2005-07-24 Perforation 331.40 331.90 13
2005-07-24 Perforation 328.10 328.60 13
2005-07-24 Perforation 321.00 321.50 13
2005-07-24 Perforation 314.60 315.10 13
2005-07-24 Perforation 308.70 309.20 13
2005-07-24 Perforation 301.70 302.20 13
2005-07-24 Perforation 295.10 295.60 13
2005-07-24 Perforation 268.10 268.60 13
2005-07-24 Perforation 500.00 500.50 13
2005-07-24 Perforation 260.50 261.00 13
2005-07-24 Perforation 253.10 253.60 13
2005-07-24 Perforation 229.80 230.30 13
2005-07-24 Perforation 220.90 221.40 13
2005-07-24 Perforation 216.60 217.10 13
2005-07-24 Perforation 204.90 205.40 13
2005-07-24 Perforation 200.80 201.30 13
2005-07-28 Fracture 200.80 508.20 0
2005-07-24 Perforation 495.00 495.50 13
2005-07-24 Perforation 493.10 493.60 13
2005-07-24 Perforation 491.30 491.80 13
2005-07-24 Perforation 490.30 490.80 13
2005-07-24 Perforation 456.70 457.20 13
2005-07-24 Perforation 449.30 449.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3308 0.0 0.0 0.0
2006 8595 0.0 0.0 0.0
2007 8391 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8702 0.0 0.0 0.0
2012 8593 0.0 0.0 0.0
2013 8390 0.0 0.0 0.0
2014 8714 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8596 0.0 0.0 0.0
2018 8714 0.0 0.0 0.0
2019 8537 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[5]

References