X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274162007000

Well Details

Well ID: 0274162007000
Loading map...
Location: 00/07-20-027-16W4/0
Location Alias: 00/07-20-27-16 W4M
Location Alias 2: 00/07-20-027-16 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 16
Section: 20
County/Municipality: Special Areas No. 2
Well Name: KEWANEE B CESS 7-20-27-16
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0017234
License Date: 1959-06-11
License Status: RecCertified
Spud Date: 1959-06-15
Final Drill Date: 1959-06-26
Well Total Depth: 1292.40 m
Surface Hole Latitude: 51.319680
Surface Hole Longitude: -112.217206

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-11 Obtained License
1959-06-20 Drill Stem Test Performed
1959-06-22 Drill Stem Test Performed
1959-06-23 Drill Stem Test Performed
1959-06-26 Finished Drilling
1959-06-26 Well Mode changed to Drilled and Cased
1959-06-28 Production Casing Operation Performed
1959-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-16 Perforation Treatment Performed - Jet Perforation
1959-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-18 Perforation Treatment Performed - Fractured
1959-07-18 Perforation Treatment Performed - Jet Perforation
1959-07-20 Perforation Treatment Performed - Jet Perforation
1959-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-21 Perforation Treatment Performed - Fractured
1959-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-06 Perforation Treatment Performed - Cement Squeeze
1961-02-26 Perforation Treatment Performed - Cement Squeeze
1961-03-05 Perforation Treatment Performed - Cement Squeeze
1961-03-10 Perforation Treatment Performed - Cement Squeeze
1961-03-15 Perforation Treatment Performed - Cement Squeeze
1961-03-18 Perforation Treatment Performed - Cement Squeeze
1961-04-05 Perforation Treatment Performed - Condensate Squeeze
1961-05-13 Well Began Production
1961-05-13 Well Fluid changed to Crude Oil
1961-05-13 Well Mode changed to Pumping
1962-12-04 Well Fluid changed to Crude Oil
1962-12-04 Well Mode changed to Suspended
1963-04-05 Well Fluid changed to Crude Oil
1963-04-05 Well Mode changed to Pumping
1963-11-25 Well Fluid changed to Crude Oil
1963-11-25 Well Mode changed to Suspended
1964-04-01 Well Fluid changed to Crude Oil
1964-04-01 Well Mode changed to Pumping
1964-11-18 Well Fluid changed to Crude Oil
1964-11-18 Well Mode changed to Suspended
1965-07-06 Well Fluid changed to Crude Oil
1965-07-06 Well Mode changed to Pumping
1965-12-02 Well Fluid changed to Crude Oil
1965-12-02 Well Mode changed to Suspended
1967-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1967-08-01 Well Fluid changed to Crude Oil
1967-08-01 Well Mode changed to Abandoned Zone
1967-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-02 Perforation Treatment Performed - Jet Perforation
1967-08-03 Perforation Treatment Performed - Fractured
1967-08-04 Perforation Treatment Performed - Fractured
1967-08-04 Perforation Treatment Performed - Jet Perforation
1968-06-23 Perforation Treatment Performed - Cement Plug
1968-06-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-07-16 Perforation 1279.20 1282.30 13
1959-07-29 Acid Treatment 1254.60 1258.80 0
1961-02-06 Cement Squeeze 1254.60 1258.80 0
1961-02-26 Cement Squeeze 1268.30 1270.70 0
1961-03-05 Cement Squeeze 1254.60 1258.80 0
1961-03-10 Cement Squeeze 1230.50 1269.20 0
1961-03-15 Cement Squeeze 1254.60 1258.80 0
1961-03-15 Cement Squeeze 1268.30 1270.70 0
1961-03-18 Cement Squeeze 1254.60 1258.80 0
1961-03-18 Cement Squeeze 1268.30 1270.70 0
1961-04-05 Condensate Squeeze 1279.20 1282.30 0
1959-07-16 Acid Treatment 1279.20 1282.30 0
1967-08-01 Packing Device Capped w/Cement 1264.30 1264.30 0
1967-08-02 Perforation 1253.00 1257.30 13
1967-08-02 Acid Treatment 1253.00 1257.30 0
1967-08-03 Fracture 1253.00 1257.30 0
1967-08-04 Perforation 1253.00 1257.30 7
1967-08-04 Fracture 1253.00 1257.30 0
1968-06-23 Cement Plug 1242.40 1260.70 0
1959-07-18 Perforation 1268.30 1270.70 13
1959-07-18 Acid Treatment 1268.30 1270.70 0
1959-07-18 Fracture 1268.30 1270.70 0
1959-07-20 Perforation 1254.60 1258.80 13
1959-07-21 Acid Treatment 1254.60 1258.80 0
1959-07-21 Fracture 1254.60 1258.80 0
1959-07-28 Acid Treatment 1254.60 1258.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References