X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265033602000

Well Details

Well ID: 0265033602000
Loading map...
Location: 00/02-36-026-03W5/0
Location Alias: 00/02-36-26-03 W5M
Location Alias 2: 00/02-36-026-03 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 03
Section: 36
County/Municipality: Rocky View County
Well Name: TRIOIL HZ LOCHEND 2-36-26-3
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0431351
License Date: 2011-02-09
License Status: Suspension
Spud Date: 2011-02-15
Final Drill Date: 2011-03-04
Well Total Depth: 3378.00 m
Surface Hole Latitude: 51.269970
Surface Hole Longitude: -114.291798

For data sources see[1][2]

Well History

Date Event
2011-02-09 Obtained License
2011-02-17 Surface Casing Operation Performed
2011-02-20 Direction Drilling Operation Performed - Horizontal
2011-02-26 Intermediate Casing Operation Performed
2011-02-26 Production Casing Operation Performed
2011-03-04 Finished Drilling
2011-03-04 Well Mode changed to Drilled and Cased
2011-03-06 Liner Casing Operation Performed
2011-03-06 Perforation Treatment Performed - Slotted Liner or Casing
2011-03-07 Rig Released
2011-04-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-02 Perforation Treatment Performed - Open-Hole Completion
2011-04-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-01 Well Began Production
2011-05-01 Well Fluid changed to Crude Oil
2011-05-01 Well Mode changed to Flowing
2016-04-01 Well Fluid changed to Crude Oil
2016-04-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-20 1842.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-06 Slotted Liner 2263.40 3378.00 0
2011-04-02 Multi-Stage Fracture 2969.50 2969.60 0
2011-04-02 Multi-Stage Fracture 2918.40 2918.50 0
2011-04-02 Multi-Stage Fracture 2868.00 2868.10 0
2011-04-03 Multi-Stage Fracture 2805.40 2805.50 0
2011-04-03 Multi-Stage Fracture 2754.50 2754.60 0
2011-04-03 Multi-Stage Fracture 2703.60 2703.70 0
2011-04-03 Multi-Stage Fracture 2641.60 2641.70 0
2011-04-03 Multi-Stage Fracture 2590.80 2590.90 0
2011-04-03 Multi-Stage Fracture 2539.60 2539.70 0
2011-04-03 Multi-Stage Fracture 2488.20 2488.30 0
2011-04-02 Open Hole/Barefoot Completion 3373.00 3378.00 0
2011-04-03 Multi-Stage Fracture 2425.90 2426.00 0
2011-04-03 Multi-Stage Fracture 2374.90 2375.00 0
2011-04-03 Multi-Stage Fracture 2323.70 2323.80 0
2011-04-02 Multi-Stage Fracture 3352.30 3352.40 0
2011-04-02 Multi-Stage Fracture 3298.90 3299.00 0
2011-04-02 Multi-Stage Fracture 3236.20 3236.30 0
2011-04-02 Multi-Stage Fracture 3184.90 3185.00 0
2011-04-02 Multi-Stage Fracture 3133.90 3134.00 0
2011-04-02 Multi-Stage Fracture 3082.80 3082.90 0
2011-04-02 Multi-Stage Fracture 3020.30 3020.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5586 0.0 0.0 0.0
2012 8734 0.0 0.0 0.0
2013 8715 0.0 0.0 0.0
2014 8649 0.0 0.0 0.0
2015 4007 0.0 0.0 0.0

For data sources see[6]

References