X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265033303000

Well Details

Well ID: 0265033303000
Loading map...
Location: 00/03-33-026-03W5/0
Location Alias: 00/03-33-26-03 W5M
Location Alias 2: 00/03-33-026-03 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 03
Section: 33
County/Municipality: Rocky View County
Well Name: NAL LOCHEND 3-33-26-3
Operator Name: NAL Resources Limited
License Number: 0456913
License Date: 2013-05-13
License Status: Issued
Spud Date: 2013-06-09
Final Drill Date: 2013-06-21
Well Total Depth: 3895.00 m
Surface Hole Latitude: 51.272777
Surface Hole Longitude: -114.367585

For data sources see[1][2]

Well History

Date Event
2013-05-13 Obtained License
2013-06-11 Surface Casing Operation Performed
2013-06-13 Direction Drilling Operation Performed - Deviate
2013-06-15 Direction Drilling Operation Performed - Horizontal
2013-06-21 Finished Drilling
2013-06-21 Perforation Treatment Performed - Open-Hole Completion
2013-06-21 Well Log Performed
2013-06-21 Well Mode changed to Drilled and Cased
2013-06-22 Well Log Performed
2013-06-24 Liner Casing Operation Performed
2013-06-24 Production Casing Operation Performed
2013-06-25 Rig Released
2013-07-01 Well Began Production
2013-07-01 Well Fluid changed to Crude Oil
2013-07-01 Well Mode changed to Pumping
2013-07-04 Well Log Performed
2013-07-05 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-06-09 Horizon Drilling Inc. 39 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-06-13 1926.90 Deviate (5 - 79 degrees)
2013-06-15 2404.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-06-21 Open Hole/Barefoot Completion 3890.00 3895.00 0
2013-07-05 Multi-Stage Fracture 3234.00 3234.10 0
2013-07-05 Multi-Stage Fracture 3156.70 3156.80 0
2013-07-05 Multi-Stage Fracture 3080.00 3080.10 0
2013-07-05 Multi-Stage Fracture 3003.50 3003.60 0
2013-07-05 Multi-Stage Fracture 2927.80 2927.90 0
2013-07-05 Multi-Stage Fracture 2852.00 2852.10 0
2013-07-05 Multi-Stage Fracture 2774.70 2774.80 0
2013-07-05 Multi-Stage Fracture 2699.00 2699.10 0
2013-07-05 Multi-Stage Fracture 2638.10 2638.20 0
2013-07-05 Multi-Stage Fracture 2561.10 2561.20 0
2013-07-05 Multi-Stage Fracture 3849.90 3850.00 0
2013-07-05 Multi-Stage Fracture 3784.60 3784.70 0
2013-07-05 Multi-Stage Fracture 3708.50 3708.60 0
2013-07-05 Multi-Stage Fracture 3619.20 3619.30 0
2013-07-05 Multi-Stage Fracture 3542.00 3542.10 0
2013-07-05 Multi-Stage Fracture 3465.10 3465.20 0
2013-07-05 Multi-Stage Fracture 3388.20 3388.30 0
2013-07-05 Multi-Stage Fracture 3311.40 3311.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-05 2013-07-05 2,238 2,910 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.3764 N/A
water 7732-18-5 100 84.859 N/A
Sand (20/40) Trican silica crystalline 14808-60-7 100 7.6696 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 1.6154 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 3.6884 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 0.5056 N/A
PROBIO-100 Trican Bactericide/Biocide non-hazardous ingredients Not Available 100 0.0451 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0167 N/A
GCS-2 Trican Clay Control poly(N.N-diallyl-N.N-dimethylammonium chloride) 26062-79-3 100 0.1892 N/A
propylene glycol 57-55-6 100 0.1892 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1083 N/A
S- 2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0438 N/A
isopropanol 67-63-0 100 0.0438 N/A
methanol 67-56-1 100 0.0438 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0438 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0438 N/A
SS-4 Trican Surfactant aliphatic alcohol 8540 100 0.0568 N/A
aminofunctional polymer 8540 100 0.0568 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0568 N/A
isopropanol 67-63-0 100 0.0568 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-07-02 2013-07-12 Surface Water - Lake 2947

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 4205 0.0 0.0 0.0
2014 8112 0.0 0.0 0.0
2015 8661 0.0 0.0 0.0
2016 8641 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 7914 0.0 0.0 0.0
2019 7890 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-06-25 No Incident Encountered 0.00 0.00
2013-07-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References