If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0265033101000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.27175,"lon":-114.397267,"icon":""}]} |
| Location: 00/01-31-026-03W5/0 | |
| Location Alias: 00/01-31-26-03 W5M | |
| Location Alias 2: 00/01-31-026-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 026 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 31 | |
| County/Municipality: Rocky View County | |
| Well Name: TRIOIL HZ LOCHEND 1-31-26-3 | |
| Operator Name: ORLEN Upstream Canada Ltd. | |
| License Number: 0444125 | |
| License Date: 2012-02-14 | |
| License Status: Issued | |
| Spud Date: 2012-02-22 | |
| Final Drill Date: 2012-03-11 | |
| Well Total Depth: 3873.00 m | |
| Surface Hole Latitude: 51.271750 | |
| Surface Hole Longitude: -114.397267 |
| Date | Event |
|---|---|
| 2012-02-14 | Obtained License |
| 2012-02-22 | Lost Circulation Occurred |
| 2012-02-26 | Surface Casing Operation Performed |
| 2012-02-29 | Direction Drilling Operation Performed - Horizontal |
| 2012-03-10 | Well Log Performed |
| 2012-03-11 | Finished Drilling |
| 2012-03-11 | Well Mode changed to Drilled and Cased |
| 2012-03-12 | Liner Casing Operation Performed |
| 2012-03-12 | Production Casing Operation Performed |
| 2012-03-15 | Rig Released |
| 2012-03-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-03-20 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-03-20 | Well Began Production |
| 2012-03-20 | Well Fluid changed to Crude Oil |
| 2012-03-20 | Well Mode changed to Flowing |
| 2012-03-21 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-22 | Ensign Drilling Inc. | 511 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-29 | 2009.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-03-20 | Open Hole/Barefoot Completion | 3842.90 | 3873.00 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 3247.70 | 3247.80 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 3174.30 | 3174.40 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 3111.70 | 3111.80 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 3049.70 | 3049.80 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 2987.70 | 2987.80 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 2925.30 | 2925.40 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 2862.40 | 2862.50 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 2798.10 | 2798.20 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 2735.50 | 2735.60 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 2673.70 | 2673.80 | 0 |
| 2012-03-20 | Multi-Stage Fracture | 3838.20 | 3838.30 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 2611.40 | 2611.50 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 2549.00 | 2549.10 | 0 |
| 2012-03-20 | Multi-Stage Fracture | 3763.60 | 3763.70 | 0 |
| 2012-03-20 | Multi-Stage Fracture | 3689.40 | 3689.50 | 0 |
| 2012-03-20 | Multi-Stage Fracture | 3616.10 | 3616.20 | 0 |
| 2012-03-20 | Multi-Stage Fracture | 3542.20 | 3542.30 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 3467.20 | 3467.30 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 3393.90 | 3394.00 | 0 |
| 2012-03-21 | Multi-Stage Fracture | 3320.50 | 3320.60 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 3936 | 0.0 | 0.0 | 0.0 |
| 2013 | 8275 | 0.0 | 0.0 | 0.0 |
| 2014 | 7759 | 0.0 | 0.0 | 0.0 |
| 2015 | 8418 | 0.0 | 0.0 | 0.0 |
| 2016 | 7640 | 0.0 | 0.0 | 0.0 |
| 2017 | 8696 | 0.0 | 0.0 | 0.0 |
| 2018 | 8540 | 0.0 | 0.0 | 0.0 |
| 2019 | 7116 | 0.0 | 0.0 | 0.0 |
| 2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-02-22 | Lost Circulation | 24.00 | 33.00 |
| 2012-03-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]