X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265031406000

Well Details

Well ID: 0265031406000
Loading map...
Location: 00/06-14-026-03W5/0
Location Alias: 00/06-14-26-03 W5M
Location Alias 2: 00/06-14-026-03 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 03
Section: 14
County/Municipality: Rocky View County
Well Name: NAL LOCHEND 6-14-26-3
Operator Name: NAL Resources Limited
License Number: 0083259
License Date: 1980-06-05
License Status: Abandoned
Spud Date: 1980-06-15
Final Drill Date: 1980-08-10
Well Total Depth: 2896.00 m
Surface Hole Latitude: 51.216161
Surface Hole Longitude: -114.321163

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-05 Obtained License
1980-07-20 Drill Stem Test Performed
1980-07-24 Well Log Performed
1980-08-10 Finished Drilling
1980-08-10 Well Mode changed to Drilled and Cased
1980-08-11 Well Log Performed
1980-08-12 Drill Stem Test Performed
1980-08-13 Drill Stem Test Performed
1980-08-15 Liner Casing Operation Performed
1980-09-11 Perforation Treatment Performed - Jet Perforation
1980-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-13 Perforation Treatment Performed - Jet Perforation
1980-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-27 Plug Back Performed
1980-09-28 Perforation Treatment Performed - Jet Perforation
1980-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-01 Perforation Treatment Performed - Jet Perforation
1980-10-01 Plug Back Performed
1980-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-08 Plug Back Performed
1980-10-09 Perforation Treatment Performed - Jet Perforation
1980-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-15 Plug Back Performed
1980-10-16 Perforation Treatment Performed - Jet Perforation
1980-10-20 Perforation Treatment Performed - Fractured
1981-01-03 Well Began Production
1981-01-03 Well Fluid changed to Crude Oil
1981-01-03 Well Mode changed to Pumping
1982-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-01 Well Fluid changed to Crude Oil
1986-08-01 Well Mode changed to Suspended
1987-10-01 Well Fluid changed to Crude Oil
1987-10-01 Well Mode changed to Pumping
2009-03-28 Well Log Performed
2009-03-30 Perforation Treatment Performed - Cement Plug
2009-03-30 Plug Back Performed
2009-03-30 Well Log Performed
2009-03-31 Perforation Treatment Performed - Jet Perforation
2009-03-31 Well Log Performed
2009-04-01 Perforation Treatment Performed - Cement Squeeze
2009-04-01 Plug Back Performed
2009-04-29 Perforation Treatment Performed - Jet Perforation
2009-04-30 Perforation Treatment Performed - Cement Squeeze
2009-04-30 Plug Back Performed
2009-05-30 Perforation Treatment Performed - Cement Plug
2009-05-30 Plug Back Performed
2009-05-30 Well Fluid changed to Crude Oil
2009-05-30 Well Mode changed to Abandoned Zone
2009-06-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-11 Perforation 2798.00 2799.50 13
1980-10-01 Perforation 2751.50 2752.80 6
1980-10-01 Perforation 2755.50 2757.60 6
1980-10-03 Acid Treatment 2751.50 2757.60 0
1980-10-06 Acid Treatment 2751.50 2757.60 0
1980-10-08 Packing Device Capped w/Cement 2740.00 2748.00 0
1980-10-09 Perforation 2494.00 2495.30 13
1980-10-09 Perforation 2496.00 2497.30 13
1980-10-10 Acid Treatment 2494.00 2497.30 0
1980-10-15 Packing Device Capped w/Cement 2483.00 2491.00 0
1980-10-16 Perforation 2220.30 2223.00 13
1980-09-12 Acid Treatment 2798.00 2799.50 0
1980-10-20 Fracture 2220.30 2223.00 0
1982-12-12 Acid Treatment 2220.00 2223.00 0
2009-03-30 Cement Plug 2240.00 2248.00 0
2009-03-31 Perforation 885.00 886.00 13
2009-04-01 Cement Squeeze 870.00 901.00 0
2009-04-29 Perforation 515.00 525.00 13
2009-04-30 Cement Squeeze 515.00 525.00 0
2009-05-30 Cement Plug 449.00 541.40 0
1980-09-13 Perforation 2797.50 2800.50 13
1980-09-13 Acid Treatment 2797.50 2800.50 0
1980-09-27 Packing Device Capped w/Cement 2789.00 2796.00 0
1980-09-28 Perforation 2781.20 2782.10 13
1980-09-28 Perforation 2782.90 2784.50 13
1980-09-29 Acid Treatment 2781.20 2784.50 0
1980-10-01 Packing Device Capped w/Cement 2773.00 2779.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 759 0.0 0.0 0.0
1981 7416 0.0 0.0 0.0
1982 7076 0.0 0.0 0.0
1983 8748 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8399 0.0 0.0 0.0
1986 2712 0.0 0.0 0.0
1987 2208 0.0 0.0 0.0
1988 7804 0.0 0.0 0.0
1989 7780 0.0 0.0 0.0
1990 7883 0.0 0.0 0.0
1991 7694 0.0 0.0 0.0
1992 7212 0.0 0.0 0.0
1993 7276 0.0 0.0 0.0
1994 3304 0.0 0.0 0.0
1995 4548 0.0 0.0 0.0
1996 6263 0.0 0.0 0.0
1997 7771 0.0 0.0 0.0
1998 6292 0.0 0.0 0.0
1999 5784 0.0 0.0 0.0
2000 6839 0.0 0.0 0.0
2001 8465 0.0 0.0 0.0
2002 8265 0.0 0.0 0.0
2003 5767 0.0 0.0 0.0
2004 8688 0.0 0.0 0.0
2005 1012 0.0 0.0 0.0
2006 5208 0.0 0.0 0.0
2007 7367 0.0 0.0 0.0
2008 4348 0.0 0.0 0.0
2009 1368 0.0 0.0 0.0

For data sources see[5]

References