X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265030903000

Well Details

Well ID: 0265030903000
Loading map...
Location: 00/03-09-026-03W5/0
Location Alias: 00/03-09-26-03 W5M
Location Alias 2: 00/03-09-026-03 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 03
Section: 09
County/Municipality: Rocky View County
Well Name: NAL HZ LOCHEND 3-9-26-3
Operator Name: NAL Resources Limited
License Number: 0495049
License Date: 2019-07-09
License Status: Issued
Spud Date: 2019-08-28
Final Drill Date: 2019-09-11
Well Total Depth: 5896.00 m
Surface Hole Latitude: 51.228279
Surface Hole Longitude: -114.376152

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-08-28 Horizon Drilling Inc. 43 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-08-31 2012.60 Deviate (5 - 79 degrees)
2019-09-02 2419.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-09-18 Multi-Stage Fracture 5838.00 5838.10 0
2019-09-19 Multi-Stage Fracture 5309.00 5309.10 0
2019-09-19 Multi-Stage Fracture 5250.00 5250.10 0
2019-09-19 Multi-Stage Fracture 5192.00 5192.10 0
2019-09-20 Multi-Stage Fracture 5075.00 5075.10 0
2019-09-20 Multi-Stage Fracture 5016.00 5016.10 0
2019-09-20 Multi-Stage Fracture 4958.00 4958.10 0
2019-09-20 Multi-Stage Fracture 4899.00 4899.10 0
2019-09-20 Multi-Stage Fracture 4841.00 4841.10 0
2019-09-20 Multi-Stage Fracture 4782.00 4782.10 0
2019-09-20 Multi-Stage Fracture 4724.00 4724.10 0
2019-09-19 Multi-Stage Fracture 5779.00 5779.10 0
2019-09-21 Multi-Stage Fracture 4665.00 4665.10 0
2019-09-21 Multi-Stage Fracture 4606.00 4606.10 0
2019-09-21 Multi-Stage Fracture 4548.00 4548.10 0
2019-09-21 Multi-Stage Fracture 4489.00 4489.10 0
2019-09-21 Multi-Stage Fracture 4430.00 4430.10 0
2019-09-21 Multi-Stage Fracture 4372.00 4372.10 0
2019-09-21 Multi-Stage Fracture 4313.00 4313.10 0
2019-09-21 Multi-Stage Fracture 4255.00 4255.10 0
2019-09-21 Multi-Stage Fracture 4196.00 4196.10 0
2019-09-21 Multi-Stage Fracture 4138.00 4138.10 0
2019-09-19 Multi-Stage Fracture 5718.00 5718.10 0
2019-09-21 Multi-Stage Fracture 4080.00 4080.10 0
2019-09-21 Multi-Stage Fracture 4022.00 4022.10 0
2019-09-21 Multi-Stage Fracture 3964.00 3964.10 0
2019-09-21 Multi-Stage Fracture 3905.00 3905.10 0
2019-09-21 Multi-Stage Fracture 3849.00 3849.10 0
2019-09-21 Multi-Stage Fracture 3791.00 3791.10 0
2019-09-21 Multi-Stage Fracture 3732.00 3732.10 0
2019-09-21 Multi-Stage Fracture 3673.00 3673.10 0
2019-09-21 Multi-Stage Fracture 3615.00 3615.10 0
2019-09-21 Multi-Stage Fracture 3560.00 3560.10 0
2019-09-19 Multi-Stage Fracture 5659.00 5659.10 0
2019-09-21 Multi-Stage Fracture 3502.00 3502.10 0
2019-09-21 Multi-Stage Fracture 3444.00 3444.10 0
2019-09-21 Multi-Stage Fracture 3385.00 3385.10 0
2019-09-21 Multi-Stage Fracture 3327.00 3327.10 0
2019-09-21 Multi-Stage Fracture 3271.00 3271.10 0
2019-09-21 Multi-Stage Fracture 3215.00 3215.10 0
2019-09-21 Multi-Stage Fracture 3156.00 3156.10 0
2019-09-21 Multi-Stage Fracture 3097.00 3097.10 0
2019-09-21 Multi-Stage Fracture 3043.00 3043.10 0
2019-09-21 Multi-Stage Fracture 2985.00 2985.10 0
2019-09-19 Multi-Stage Fracture 5601.00 5601.10 0
2019-09-21 Multi-Stage Fracture 2926.00 2926.10 0
2019-09-21 Multi-Stage Fracture 2868.00 2868.10 0
2019-09-21 Multi-Stage Fracture 2809.00 2809.10 0
2019-09-21 Multi-Stage Fracture 2750.00 2750.10 0
2019-09-21 Multi-Stage Fracture 2693.00 2693.10 0
2019-09-21 Multi-Stage Fracture 2634.00 2634.10 0
2019-09-21 Multi-Stage Fracture 2575.00 2575.10 0
2019-09-19 Multi-Stage Fracture 5543.00 5543.10 0
2019-09-19 Multi-Stage Fracture 5484.00 5484.10 0
2019-09-19 Multi-Stage Fracture 5425.00 5425.10 0
2019-09-19 Multi-Stage Fracture 5367.00 5367.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-09-18 2019-09-21 2,313 6,272 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 87.6519 N/A
Sand - Tier 1 30/50 Trican silica crystalline 14808-60-7 100 12.1208 N/A
Aqucar DB20 Biocide Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0104 N/A
polyethylene glycol 25322-68-3 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0867 N/A
FR-24 Concentrated Friction Reducer Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0473 N/A
non-hazardous ingredients Not Available 100 0.0473 N/A
SI-18 Scale Inhibitor Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.041 N/A
S-28 Surfactant Trican Surfactant methanol 67-56-1 100 0.0416 N/A
non-hazardous ingredients Not Available 100 0.0416 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0416 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1848 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-15 No Incident Encountered 0.00 0.00
2019-10-11 No Incident Encountered 0.00 0.00

For data sources see[8]

References