X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265023104002

Well Details

Well ID: 0265023104002
Loading map...
Location: 00/04-31-026-02W5/2
Location Alias: 00/04-31-26-02 W5M
Location Alias 2: 00/04-31-026-02 W5/02
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 02
Section: 31
County/Municipality: Rocky View County
Well Name: RHODES ET AL LOCHEND 4-31-26-2
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0104609
License Date: 1983-12-09
License Status: Abandoned
Spud Date: 1983-12-13
Final Drill Date: 1983-12-26
Well Total Depth: 2165.00 m
Surface Hole Latitude: 51.258090
Surface Hole Longitude: -114.279769

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-12-09 Obtained License
1983-12-13 Lost Circulation Occurred
1983-12-26 Finished Drilling
1983-12-26 Well Mode changed to Drilled and Cased
1983-12-29 Production Casing Operation Performed
1984-01-26 Well Log Performed
1984-01-27 Perforation Treatment Performed - Jet Perforation
1984-01-28 Perforation Treatment Performed - Fractured
1984-02-01 Perforation Treatment Performed - Jet Perforation
1984-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-02 Well Log Performed
1984-02-24 Well Began Production
1984-02-24 Well Fluid changed to Crude Oil
1984-02-24 Well Mode changed to Pumping
1984-07-04 Well Log Performed
1996-07-01 Well Fluid changed to Crude Oil
1996-07-01 Well Mode changed to Suspended
2019-09-23 Well Log Performed
2019-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-24 Plug Back Performed
2019-09-24 Well Fluid changed to Crude Oil
2019-09-24 Well Log Performed
2019-09-24 Well Mode changed to Abandoned Zone
2019-09-25 Perforation Treatment Performed - Jet Perforation
2019-09-25 Well Log Performed
2019-09-26 Perforation Treatment Performed - Cement Plug
2019-09-26 Perforation Treatment Performed - Jet Perforation
2019-09-26 Plug Back Performed
2019-09-26 Well Log Performed
2019-09-27 Perforation Treatment Performed - Jet Perforation
2019-09-27 Well Log Performed
2019-09-28 Perforation Treatment Performed - Cement Squeeze
2019-09-28 Plug Back Performed
2019-09-29 Well Log Performed
2019-10-01 Perforation Treatment Performed - Cement Plug
2019-10-01 Plug Back Performed
2019-10-01 Well Log Performed
2019-10-03 Well Abandoned
2019-10-03 Well Fluid changed to Crude Oil
2019-10-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-01-27 Perforation 2132.50 2134.00 7
2019-09-25 Perforation 1812.90 1813.90 13
2019-09-25 Perforation 1776.00 1777.00 13
2019-09-25 Perforation 1765.00 1766.00 13
2019-09-25 Perforation 1725.50 1726.50 13
2019-09-25 Perforation 1693.00 1694.00 13
2019-09-25 Perforation 1689.80 1690.80 13
2019-09-25 Perforation 1673.00 1674.00 13
2019-09-26 Perforation 1238.00 1239.00 13
2019-09-26 Perforation 1222.00 1223.00 13
2019-09-26 Perforation 1194.00 1195.00 13
1984-01-28 Fracture 2132.50 2134.00 0
2019-09-26 Perforation 1025.00 1026.00 13
2019-09-26 Perforation 931.00 932.00 13
2019-09-26 Perforation 904.00 905.00 13
2019-09-26 Perforation 896.00 897.00 13
2019-09-26 Perforation 847.00 848.00 13
2019-09-26 Perforation 819.00 820.00 13
2019-09-26 Cement Plug 615.00 1900.00 0
2019-09-27 Perforation 618.50 619.50 13
2019-09-27 Perforation 568.50 569.50 13
2019-09-27 Perforation 549.50 550.50 13
1984-02-01 Perforation 2102.00 2105.50 7
2019-09-27 Perforation 514.50 515.50 13
2019-09-27 Perforation 474.00 475.00 13
2019-09-27 Perforation 452.00 453.00 13
2019-09-27 Perforation 398.00 399.00 13
2019-09-27 Perforation 365.00 366.00 13
2019-09-27 Perforation 305.00 306.00 13
2019-09-28 Cement Squeeze 305.00 619.50 0
2019-10-01 Cement Plug 226.50 227.50 0
1984-02-02 Acid Treatment 2102.00 2105.50 0
2019-09-24 Packing Device Capped w/Cement 2114.00 2122.00 0
2019-09-24 Packing Device Capped w/Cement 2087.00 2095.00 0
2019-09-24 Packing Device Capped w/Cement 1892.00 1900.00 0
2019-09-25 Perforation 1864.00 1865.00 13
2019-09-25 Perforation 1851.00 1852.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6443 0.0 0.0 0.0
1985 6311 0.0 0.0 0.0
1986 8709 0.0 0.0 0.0
1987 8662 0.0 0.0 0.0
1988 8301 0.0 0.0 0.0
1989 8459 0.0 0.0 0.0
1990 8424 0.0 0.0 0.0
1991 7656 0.0 0.0 0.0
1992 3772 0.0 0.0 0.0
1993 6915 0.0 0.0 0.0
1994 4440 0.0 0.0 0.0
1995 1628 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-12-13 Lost Circulation 0.10 181.00
2019-10-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References