X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265012806000

Well Details

Well ID: 0265012806000
Loading map...
Location: 00/06-28-026-01W5/0
Location Alias: 00/06-28-26-01 W5M
Location Alias 2: 00/06-28-026-01 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 01
Section: 28
County/Municipality: Rocky View County
Well Name: BVI ET AL CROSSFIELD 6-28-26-1
Operator Name: Obsidian Energy Ltd.
License Number: 0090633
License Date: 1981-06-10
License Status: RecCertified
Spud Date: 1981-06-15
Final Drill Date: 1981-07-20
Well Total Depth: 2545.00 m
Surface Hole Latitude: 51.245943
Surface Hole Longitude: -114.089573

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-10 Obtained License
1981-06-15 Direction Drilling Operation Performed - 98
1981-06-15 Lost Circulation Occurred
1981-07-08 Drill Stem Test Performed
1981-07-20 Finished Drilling
1981-07-20 Well Log Performed
1981-07-20 Well Mode changed to Drilled and Cased
1981-07-24 Production Casing Operation Performed
1981-08-20 Perforation Treatment Performed - Jet Perforation
1981-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-08-24 Perforation Treatment Performed - Jet Perforation
1981-08-26 Perforation Treatment Performed - Fractured
1981-08-28 Perforation Treatment Performed - Bridge Plug No Cement Required
1981-09-03 Perforation Treatment Performed - Jet Perforation
1981-09-08 Perforation Treatment Performed - Fractured
1981-09-20 Well Began Production
1981-09-20 Well Fluid changed to Crude Oil
1981-09-20 Well Mode changed to Pumping
1984-07-31 Well Fluid changed to Crude Oil
1984-07-31 Well Mode changed to Suspended
1989-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-10 Plug Back Performed
1989-06-10 Well Log Performed
1989-06-13 Well Abandoned
1989-06-13 Well Fluid changed to Crude Oil
1989-06-13 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1981-06-15 1204.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-08-20 Perforation 2480.50 2484.50 7
1989-06-10 Packing Device Capped w/Cement 1947.00 1955.00 0
1981-08-20 Perforation 2485.30 2487.00 7
1981-08-22 Acid Treatment 2480.50 2487.00 0
1981-08-23 Packing Device Capped w/Cement 2462.00 2470.00 0
1981-08-24 Perforation 2188.50 2194.50 7
1981-08-26 Fracture 2188.50 2194.50 0
1981-08-28 Bridge Plug, No Cement 2174.80 2174.80 0
1981-09-03 Perforation 1959.80 1960.80 7
1981-09-08 Fracture 1959.80 1960.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1824 0.0 0.0 0.0
1982 8496 0.0 0.0 0.0
1983 7065 0.0 0.0 0.0
1984 5148 0.0 0.0 0.0
1989 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-06-15 Lost Circulation 26.00 282.00

For data sources see[7]

References