X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264291307000

Well Details

Well ID: 0264291307000
Loading map...
Location: 00/07-13-026-29W4/0
Location Alias: 00/07-13-26-29 W4M
Location Alias 2: 00/07-13-026-29 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 29
Section: 13
County/Municipality: Rocky View County
Well Name: WASCANA CROSS 7-13-26-29
Operator Name: CNOOC Petroleum North America ULC
License Number: 0021708
License Date: 1961-11-17
License Status: Abandoned
Spud Date: 1961-11-26
Final Drill Date: 1962-01-03
Well Total Depth: 2659.10 m
Surface Hole Latitude: 51.218084
Surface Hole Longitude: -113.920621

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-11-17 Obtained License
1962-01-03 Finished Drilling
1962-01-03 Well Mode changed to Drilled and Cased
1962-01-04 Drill Stem Test Performed
1962-01-08 Liner Casing Operation Performed
1962-03-12 Perforation Treatment Performed - Open-Hole Completion
1962-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-04-02 Well Began Production
1962-04-02 Well Fluid changed to Gas
1962-04-02 Well Mode changed to Flowing
1963-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-19 Perforation Treatment Performed - Nitrogen Treatment
1965-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-05-02 Perforation Treatment Performed - Condensate Squeeze
2011-07-01 Well Fluid changed to Gas
2011-07-01 Well Mode changed to Suspended
2015-05-17 Well Log Performed
2015-05-19 Well Log Performed
2015-05-21 Perforation Treatment Performed - Cement Squeeze
2015-05-21 Plug Back Performed
2015-05-21 Well Fluid changed to Gas
2015-05-21 Well Mode changed to Abandoned Zone
2015-05-22 Perforation Treatment Performed - Jet Perforation
2015-05-22 Well Log Performed
2015-05-23 Perforation Treatment Performed - Cement Plug
2015-05-23 Perforation Treatment Performed - Remedial Casing
2015-05-23 Plug Back Performed
2015-05-24 Perforation Treatment Performed - Jet Perforation
2015-05-25 Perforation Treatment Performed - Cement Plug
2015-05-25 Perforation Treatment Performed - Remedial Casing
2015-05-25 Plug Back Performed
2015-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-05-26 Perforation Treatment Performed - Jet Perforation
2015-05-26 Plug Back Performed
2015-05-26 Well Log Performed
2015-05-27 Perforation Treatment Performed - Cement Plug
2015-05-27 Perforation Treatment Performed - Cement Squeeze
2015-05-27 Plug Back Performed
2015-10-21 Well Abandoned
2015-10-21 Well Fluid changed to Gas
2015-10-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-03-12 Open Hole/Barefoot Completion 2637.40 2658.50 0
2015-05-22 Perforation 2235.00 2239.00 17
2015-05-22 Perforation 2166.00 2170.00 17
2015-05-22 Perforation 2158.00 2162.00 17
2015-05-22 Perforation 2029.00 2033.00 17
2015-05-22 Perforation 1948.00 1952.00 17
2015-05-22 Perforation 1671.00 1675.00 17
2015-05-23 Remedial Casing Cementing 1671.00 2548.00 0
2015-05-23 Cement Plug 1617.50 2595.00 0
2015-05-24 Perforation 1040.00 1044.00 17
2015-05-25 Remedial Casing Cementing 1040.00 1044.00 0
1962-03-15 Acid Treatment 2637.40 2658.50 0
2015-05-25 Cement Plug 843.30 1065.00 0
2015-05-26 Packing Device Capped w/Cement 692.00 702.00 0
2015-05-26 Perforation 489.00 493.00 17
2015-05-27 Cement Squeeze 489.00 493.00 0
2015-05-27 Cement Plug 452.60 486.00 0
1962-03-16 Acid Treatment 2637.40 2658.50 0
1963-06-19 Nitrogen Treatment 2637.40 2658.50 0
1963-06-19 Acid Treatment 2637.40 2658.50 0
1965-05-02 Acid Treatment 2637.40 2658.50 0
1965-05-02 Condensate Squeeze 2637.40 2658.50 0
2015-05-21 Cement Squeeze 2637.40 2658.50 0
2015-05-22 Perforation 2544.00 2548.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1363 0.0 0.0 0.0
1969 8052 0.0 0.0 0.0
1970 7743 0.0 0.0 0.0
1971 8057 0.0 0.0 0.0
1972 8426 0.0 0.0 0.0
1973 7611 0.0 0.0 0.0
1974 8587 0.0 0.0 0.0
1975 8586 0.0 0.0 0.0
1976 8260 0.0 0.0 0.0
1977 8748 0.0 0.0 0.0
1978 8348 0.0 0.0 0.0
1979 8658 0.0 0.0 0.0
1980 8176 0.0 0.0 0.0
1981 7229 0.0 0.0 0.0
1982 6104 0.0 0.0 0.0
1983 6539 0.0 0.0 0.0
1984 7413 0.0 0.0 0.0
1985 8526 0.0 0.0 0.0
1986 8215 0.0 0.0 0.0
1987 8585 0.0 0.0 0.0
1988 8518 0.0 0.0 0.0
1989 8150 0.0 0.0 0.0
1990 8117 0.0 0.0 0.0
1991 7660 0.0 0.0 0.0
1992 7692 0.0 0.0 0.0
1993 8611 0.0 0.0 0.0
1994 8443 0.0 0.0 0.0
1995 8643 0.0 0.0 0.0
1996 8027 0.0 0.0 0.0
1997 8530 0.0 0.0 0.0
1998 6497 0.0 0.0 0.0
1999 8124 0.0 0.0 0.0
2000 8229 0.0 0.0 0.0
2001 8341 0.0 0.0 0.0
2002 7552 0.0 0.0 0.0
2003 8513 0.0 0.0 0.0
2004 8621 0.0 0.0 0.0
2005 8750 0.0 0.0 0.0
2006 8751 0.0 0.0 0.0
2007 7425 0.0 0.0 0.0
2008 8618 0.0 0.0 0.0
2009 8275 0.0 0.0 0.0
2010 7826 0.0 0.0 0.0
2011 2814 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References