If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264283411000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.266258,"lon":-113.832905,"icon":""}]} |
Location: 00/11-34-026-28W4/0 | |
Location Alias: 00/11-34-26-28 W4M | |
Location Alias 2: 00/11-34-026-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 28 | |
Section: 34 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSS 11-34-26-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0409836 | |
License Date: 2009-03-23 | |
License Status: Amended | |
Spud Date: 2009-11-22 | |
Final Drill Date: 2009-11-29 | |
Well Total Depth: 1204.00 m | |
Surface Hole Latitude: 51.266258 | |
Surface Hole Longitude: -113.832905 |
Date | Event |
---|---|
2009-03-23 | Obtained License |
2009-11-22 | Surface Casing Operation Performed |
2009-11-29 | Finished Drilling |
2009-11-29 | Production Casing Operation Performed |
2009-11-29 | Rig Released |
2009-11-29 | Well Mode changed to Drilled and Cased |
2009-12-02 | Well Log Performed |
2009-12-19 | Well Log Performed |
2010-01-20 | Perforation Treatment Performed - Jet Perforation |
2010-02-02 | Well Fluid changed to Gas |
2010-02-02 | Well Mode changed to Testing |
2010-02-20 | Perforation Treatment Performed - Fractured |
2010-04-22 | Well Began Production |
2010-04-22 | Well Fluid changed to Gas |
2010-04-22 | Well Mode changed to Flowing |
2010-10-23 | Perforation Treatment Performed - Jet Perforation |
2010-12-16 | Perforation Treatment Performed - Fractured |
2010-12-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-22 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-20 | Perforation | 1072.00 | 1075.00 | 13 |
2010-10-23 | Perforation | 682.40 | 682.90 | 13 |
2010-10-23 | Perforation | 552.30 | 552.80 | 13 |
2010-10-23 | Perforation | 594.00 | 597.00 | 13 |
2010-10-23 | Perforation | 503.00 | 507.00 | 13 |
2010-10-23 | Perforation | 488.00 | 489.00 | 13 |
2010-10-23 | Perforation | 605.50 | 607.50 | 13 |
2010-10-23 | Perforation | 421.50 | 422.00 | 13 |
2010-10-23 | Perforation | 723.00 | 725.00 | 13 |
2010-10-23 | Perforation | 618.50 | 620.50 | 13 |
2010-10-23 | Perforation | 840.40 | 840.90 | 13 |
2010-01-20 | Perforation | 1047.00 | 1049.00 | 13 |
2010-10-23 | Perforation | 830.80 | 831.30 | 13 |
2010-10-23 | Perforation | 826.30 | 826.80 | 13 |
2010-10-23 | Perforation | 846.90 | 847.40 | 13 |
2010-10-23 | Perforation | 863.30 | 863.80 | 13 |
2010-10-23 | Perforation | 858.90 | 859.40 | 13 |
2010-10-23 | Perforation | 849.10 | 849.60 | 13 |
2010-10-23 | Perforation | 787.70 | 788.70 | 13 |
2010-10-23 | Perforation | 762.40 | 762.90 | 13 |
2010-10-23 | Perforation | 760.20 | 760.70 | 13 |
2010-10-23 | Perforation | 772.30 | 773.30 | 13 |
2010-02-20 | Fracture | 1072.00 | 1075.00 | 0 |
2010-10-23 | Perforation | 821.80 | 822.80 | 13 |
2010-10-23 | Perforation | 805.50 | 806.00 | 13 |
2010-10-23 | Perforation | 798.80 | 799.30 | 13 |
2010-12-16 | Fracture | 723.00 | 725.00 | 0 |
2010-12-16 | Fracture | 682.40 | 863.80 | 0 |
2010-02-20 | Fracture | 1047.00 | 1049.00 | 0 |
2010-10-23 | Perforation | 538.80 | 539.30 | 13 |
2010-10-23 | Perforation | 480.80 | 481.30 | 13 |
2010-10-23 | Perforation | 423.80 | 424.30 | 13 |
2010-10-23 | Perforation | 549.20 | 549.70 | 13 |
2010-10-23 | Perforation | 693.00 | 693.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 6156 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8567 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8723 | 0.0 | 0.0 | 0.0 |
2016 | 8690 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8622 | 0.0 | 0.0 | 0.0 |
2019 | 8540 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[5]