X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264272901000

Well Details

Well ID: 0264272901000
Loading map...
Location: 00/01-29-026-27W4/0
Location Alias: 00/01-29-26-27 W4M
Location Alias 2: 00/01-29-026-27 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 27
Section: 29
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 1-29-26-27
Operator Name: Ember Resources Inc.
License Number: 0272418
License Date: 2002-08-06
License Status: Issued
Spud Date: 2002-09-18
Final Drill Date: 2002-09-21
Well Total Depth: 1229.00 m
Surface Hole Latitude: 51.244299
Surface Hole Longitude: -113.725117

For data sources see[1][2]

Well History

Date Event
2002-08-06 Obtained License
2002-08-25 Surface Casing Operation Performed
2002-09-19 Direction Drilling Operation Performed - Deviate
2002-09-20 Production Casing Operation Performed
2002-09-21 Finished Drilling
2002-09-21 Rig Released
2002-09-21 Well Mode changed to Drilled and Cased
2002-10-03 Well Log Performed
2002-10-08 Perforation Treatment Performed - Jet Perforation
2002-11-01 Well Began Production
2002-11-01 Well Fluid changed to Gas
2002-11-01 Well Mode changed to Flowing
2005-11-08 Perforation Treatment Performed - Jet Perforation
2005-11-15 Perforation Treatment Performed - Fractured
2006-10-01 Well Fluid changed to Gas
2006-10-01 Well Mode changed to Suspended
2007-09-11 Well Log Performed
2008-08-18 Well Log Performed
2008-09-12 Well Log Performed
2009-09-23 Well Log Performed
2010-11-20 Well Log Performed
2013-09-30 Well Log Performed
2017-04-24 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-09-19 252.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-10-08 Perforation 1007.50 1009.00 17
2005-11-08 Perforation 724.70 725.20 13
2005-11-08 Perforation 712.50 713.00 13
2005-11-08 Perforation 711.70 712.20 13
2005-11-08 Perforation 690.40 690.90 13
2005-11-08 Perforation 684.50 685.50 13
2005-11-08 Perforation 673.50 674.00 13
2005-11-08 Perforation 650.70 651.20 13
2005-11-08 Perforation 645.60 646.10 13
2005-11-08 Perforation 642.70 643.20 13
2005-11-08 Perforation 630.70 631.20 13
2002-10-08 Perforation 998.00 999.50 17
2005-11-08 Perforation 611.50 612.00 13
2005-11-08 Perforation 602.90 603.40 13
2005-11-08 Perforation 597.00 597.50 13
2005-11-08 Perforation 593.10 593.60 13
2005-11-08 Perforation 590.50 591.00 13
2005-11-08 Perforation 578.30 578.80 13
2005-11-08 Perforation 508.80 509.30 13
2005-11-08 Perforation 475.20 475.70 13
2005-11-08 Perforation 458.00 458.50 13
2005-11-08 Perforation 441.20 442.20 13
2002-10-08 Perforation 856.00 858.00 17
2005-11-08 Perforation 321.70 322.20 13
2005-11-08 Perforation 319.20 319.70 13
2005-11-08 Perforation 316.30 316.80 13
2005-11-15 Fracture 316.30 764.20 0
2005-11-08 Perforation 763.70 764.20 13
2005-11-08 Perforation 757.40 757.90 13
2005-11-08 Perforation 745.90 746.40 13
2005-11-08 Perforation 744.10 745.10 13
2005-11-08 Perforation 737.40 737.90 13
2005-11-08 Perforation 727.50 728.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1460 0.0 0.0 0.0
2003 8290 0.0 0.0 0.0
2004 8745 0.0 0.0 0.0
2005 6126 0.0 0.0 0.0

For data sources see[6]

References