If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264271409002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.220174,"lon":-113.656803,"icon":""}]} |
Location: 00/09-14-026-27W4/2 | |
Location Alias: 00/09-14-26-27 W4M | |
Location Alias 2: 00/09-14-026-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 27 | |
Section: 14 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 9-14-26-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0223124 | |
License Date: 1999-05-21 | |
License Status: Issued | |
Spud Date: 1999-05-30 | |
Final Drill Date: 2001-04-27 | |
Well Total Depth: 1104.00 m | |
Surface Hole Latitude: 51.220174 | |
Surface Hole Longitude: -113.656803 |
Date | Event |
---|---|
1999-05-21 | Obtained License |
1999-05-30 | Surface Casing Operation Performed |
2001-04-27 | Finished Drilling |
2001-04-27 | Well Mode changed to Drilled and Cased |
2001-04-28 | Production Casing Operation Performed |
2001-04-28 | Rig Released |
2001-05-10 | Well Log Performed |
2001-05-26 | Perforation Treatment Performed - Jet Perforation |
2001-06-27 | Perforation Treatment Performed - Fractured |
2005-09-04 | Perforation Treatment Performed - Jet Perforation |
2005-10-27 | Perforation Treatment Performed - Fractured |
2005-12-06 | Well Began Production |
2005-12-06 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-12-06 | Well Mode changed to Flowing |
2007-08-02 | Well Log Performed |
2007-10-11 | Well Log Performed |
2008-08-13 | Well Log Performed |
2009-09-25 | Well Log Performed |
2010-12-03 | Well Log Performed |
2013-10-08 | Well Log Performed |
2017-04-12 | Well Fluid changed to Coalbed Methane-Coals Only |
2017-04-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-05-26 | Perforation | 959.00 | 961.00 | 17 |
2005-09-04 | Perforation | 676.80 | 677.30 | 13 |
2005-09-04 | Perforation | 673.60 | 674.10 | 13 |
2005-09-04 | Perforation | 662.60 | 663.10 | 13 |
2005-09-04 | Perforation | 649.60 | 650.10 | 13 |
2005-09-04 | Perforation | 641.50 | 642.00 | 13 |
2005-09-04 | Perforation | 632.90 | 633.40 | 13 |
2005-09-04 | Perforation | 624.30 | 624.80 | 13 |
2005-09-04 | Perforation | 606.40 | 606.90 | 13 |
2005-09-04 | Perforation | 595.60 | 596.10 | 13 |
2005-09-04 | Perforation | 579.70 | 580.20 | 13 |
2001-05-26 | Perforation | 953.00 | 957.00 | 17 |
2005-09-04 | Perforation | 570.00 | 570.50 | 13 |
2005-09-04 | Perforation | 561.60 | 562.10 | 13 |
2005-09-04 | Perforation | 550.40 | 550.90 | 13 |
2005-09-04 | Perforation | 543.30 | 543.80 | 13 |
2005-09-04 | Perforation | 539.20 | 539.70 | 13 |
2005-09-04 | Perforation | 535.00 | 535.50 | 13 |
2005-09-04 | Perforation | 528.40 | 528.90 | 13 |
2005-09-04 | Perforation | 525.80 | 526.30 | 13 |
2005-09-04 | Perforation | 521.30 | 521.80 | 13 |
2005-09-04 | Perforation | 476.10 | 476.60 | 13 |
2001-05-26 | Perforation | 793.50 | 795.50 | 17 |
2005-09-04 | Perforation | 459.20 | 459.70 | 13 |
2005-09-04 | Perforation | 412.60 | 413.10 | 13 |
2005-09-04 | Perforation | 404.60 | 405.10 | 13 |
2005-09-04 | Perforation | 400.90 | 401.40 | 13 |
2005-09-04 | Perforation | 393.00 | 393.50 | 13 |
2005-09-04 | Perforation | 388.30 | 388.80 | 13 |
2005-09-04 | Perforation | 330.10 | 330.60 | 13 |
2005-10-27 | Fracture | 330.10 | 721.60 | 0 |
2001-06-27 | Fracture | 793.50 | 961.00 | 0 |
2005-09-04 | Perforation | 721.10 | 721.60 | 13 |
2005-09-04 | Perforation | 709.40 | 709.90 | 13 |
2005-09-04 | Perforation | 706.40 | 706.90 | 13 |
2005-09-04 | Perforation | 689.00 | 689.50 | 13 |
2005-09-04 | Perforation | 681.80 | 682.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 523 | 0.0 | 0.0 | 0.0 |
2006 | 531 | 0.0 | 0.0 | 0.0 |
2007 | 6250 | 0.0 | 0.0 | 0.0 |
2008 | 7936 | 0.0 | 0.0 | 0.0 |
2009 | 7818 | 0.0 | 0.0 | 0.0 |
2010 | 7105 | 0.0 | 0.0 | 0.0 |
2011 | 8737 | 0.0 | 0.0 | 0.0 |
2012 | 4368 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8758 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]