If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264262502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.244888,"lon":-113.500221,"icon":""}]} |
Location: 00/02-25-026-26W4/0 | |
Location Alias: 00/02-25-26-26 W4M | |
Location Alias 2: 00/02-25-026-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 26 | |
Section: 25 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 2-25-26-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425519 | |
License Date: 2010-11-04 | |
License Status: Issued | |
Spud Date: 2011-01-17 | |
Final Drill Date: 2011-02-06 | |
Well Total Depth: 1011.00 m | |
Surface Hole Latitude: 51.244888 | |
Surface Hole Longitude: -113.500221 |
Date | Event |
---|---|
2010-11-04 | Obtained License |
2011-01-17 | Surface Casing Operation Performed |
2011-02-06 | Finished Drilling |
2011-02-06 | Production Casing Operation Performed |
2011-02-06 | Rig Released |
2011-02-06 | Well Mode changed to Drilled and Cased |
2011-03-11 | Well Log Performed |
2011-08-09 | Perforation Treatment Performed - Jet Perforation |
2011-09-16 | Perforation Treatment Performed - Fractured |
2011-09-28 | Perforation Treatment Performed - Fractured |
2011-09-30 | Well Fluid changed to Gas |
2011-09-30 | Well Mode changed to Testing |
2011-10-13 | Perforation Treatment Performed - Jet Perforation |
2011-10-27 | Well Began Production |
2011-10-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-27 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-09 | Perforation | 530.00 | 533.00 | 13 |
2011-09-28 | Fracture | 814.00 | 817.00 | 0 |
2011-09-28 | Fracture | 874.00 | 876.00 | 0 |
2011-09-28 | Fracture | 893.00 | 896.00 | 0 |
2011-10-13 | Perforation | 216.80 | 217.30 | 13 |
2011-10-13 | Perforation | 220.00 | 221.00 | 13 |
2011-10-13 | Perforation | 258.90 | 259.40 | 13 |
2011-10-13 | Perforation | 282.00 | 285.00 | 13 |
2011-10-13 | Perforation | 287.00 | 290.00 | 13 |
2011-10-13 | Perforation | 315.70 | 316.20 | 13 |
2011-10-13 | Perforation | 322.60 | 323.10 | 13 |
2011-08-09 | Perforation | 750.00 | 752.00 | 13 |
2011-10-13 | Perforation | 333.00 | 335.00 | 13 |
2011-10-13 | Perforation | 337.40 | 338.40 | 13 |
2011-10-13 | Perforation | 348.00 | 351.00 | 13 |
2011-10-13 | Perforation | 365.00 | 369.00 | 13 |
2011-10-13 | Perforation | 385.30 | 385.80 | 13 |
2011-10-13 | Perforation | 397.00 | 399.00 | 13 |
2011-10-13 | Perforation | 403.00 | 406.00 | 13 |
2011-10-13 | Perforation | 413.00 | 416.00 | 13 |
2011-10-13 | Perforation | 439.10 | 440.10 | 13 |
2011-10-13 | Perforation | 454.90 | 455.90 | 13 |
2011-08-09 | Perforation | 814.00 | 817.00 | 13 |
2011-10-13 | Perforation | 458.70 | 460.20 | 13 |
2011-10-13 | Perforation | 462.80 | 463.30 | 13 |
2011-10-13 | Perforation | 471.70 | 472.20 | 13 |
2011-10-13 | Perforation | 479.80 | 480.30 | 13 |
2011-10-13 | Perforation | 486.00 | 486.50 | 13 |
2011-10-13 | Perforation | 501.10 | 502.10 | 13 |
2011-10-13 | Perforation | 502.60 | 503.10 | 13 |
2011-10-13 | Perforation | 504.50 | 505.50 | 13 |
2011-10-13 | Perforation | 545.10 | 545.60 | 13 |
2011-10-13 | Perforation | 550.70 | 551.20 | 13 |
2011-08-09 | Perforation | 874.00 | 876.00 | 13 |
2011-10-13 | Perforation | 558.00 | 558.50 | 13 |
2011-10-13 | Perforation | 570.60 | 571.60 | 13 |
2011-10-13 | Perforation | 576.50 | 578.00 | 13 |
2011-10-13 | Perforation | 582.00 | 583.00 | 13 |
2011-10-13 | Perforation | 584.50 | 585.50 | 13 |
2011-10-13 | Perforation | 597.60 | 598.10 | 13 |
2011-10-13 | Perforation | 616.30 | 616.80 | 13 |
2011-10-13 | Perforation | 619.80 | 620.30 | 13 |
2011-08-09 | Perforation | 893.00 | 896.00 | 13 |
2011-08-09 | Perforation | 905.00 | 908.00 | 13 |
2011-09-16 | Fracture | 905.00 | 908.00 | 0 |
2011-09-28 | Fracture | 530.00 | 533.00 | 0 |
2011-09-28 | Fracture | 750.00 | 752.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1586 | 0.0 | 0.0 | 0.0 |
2012 | 3351 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8716 | 0.0 | 0.0 | 0.0 |
2015 | 8630 | 0.0 | 0.0 | 0.0 |
2016 | 8758 | 0.0 | 0.0 | 0.0 |
2017 | 8578 | 0.0 | 0.0 | 0.0 |
2018 | 8354 | 0.0 | 0.0 | 0.0 |
2019 | 8610 | 0.0 | 0.0 | 0.0 |
2020 | 2174 | 0.0 | 0.0 | 0.0 |
For data sources see[5]