If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0264253012020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 02/12-30-026-25W4/0 | |
| Location Alias: 02/12-30-26-25 W4M | |
| Location Alias 2: 02/12-30-026-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 026 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 30 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER 102 ENTICE 12-30-26-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0219363 | |
| License Date: 1998-12-04 | |
| License Status: Issued | |
| Spud Date: 1998-12-10 | |
| Final Drill Date: 1998-12-10 | |
| Well Total Depth: 741.00 m | |
| Surface Hole Latitude: 51.251432 | |
| Surface Hole Longitude: -113.490418 |
| Date | Event |
|---|---|
| 1998-12-04 | Obtained License |
| 1998-12-10 | Finished Drilling |
| 1998-12-10 | Surface Casing Operation Performed |
| 1998-12-11 | Production Casing Operation Performed |
| 1998-12-11 | Rig Released |
| 1998-12-11 | Well Mode changed to Drilled and Cased |
| 1998-12-20 | Perforation Treatment Performed - Jet Perforation |
| 1998-12-20 | Well Log Performed |
| 1999-01-30 | Well Log Performed |
| 1999-01-31 | Perforation Treatment Performed - Jet Perforation |
| 1999-01-31 | Well Log Performed |
| 1999-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-02-27 | Perforation Treatment Performed - Jet Perforation |
| 1999-02-27 | Plug Back Performed |
| 1999-02-27 | Well Log Performed |
| 1999-02-28 | Perforation Treatment Performed - Fractured |
| 1999-03-09 | Well Began Production |
| 1999-03-09 | Well Fluid changed to Gas |
| 1999-03-09 | Well Mode changed to Flowing |
| 1999-03-27 | Perforation Treatment Performed - Jet Perforation |
| 1999-03-27 | Well Log Performed |
| 1999-05-23 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1998-12-20 | Perforation | 694.00 | 702.00 | 14 |
| 1999-01-31 | Perforation | 685.00 | 689.00 | 14 |
| 1999-02-27 | Packing Device Capped w/Cement | 670.00 | 678.00 | 0 |
| 1999-02-27 | Perforation | 533.00 | 537.00 | 7 |
| 1999-02-27 | Perforation | 529.00 | 533.00 | 7 |
| 1999-02-28 | Fracture | 529.00 | 537.00 | 0 |
| 1999-03-27 | Perforation | 157.50 | 165.50 | 7 |
| 1999-05-23 | Fracture | 157.50 | 165.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1999 | 5034 | 0.0 | 0.0 | 0.0 |
| 2000 | 8506 | 0.0 | 0.0 | 0.0 |
| 2001 | 8612 | 0.0 | 0.0 | 0.0 |
| 2002 | 8736 | 0.0 | 0.0 | 0.0 |
| 2003 | 8715 | 0.0 | 0.0 | 0.0 |
| 2004 | 8767 | 0.0 | 0.0 | 0.0 |
| 2005 | 8742 | 0.0 | 0.0 | 0.0 |
| 2006 | 8705 | 0.0 | 0.0 | 0.0 |
| 2007 | 8733 | 0.0 | 0.0 | 0.0 |
| 2008 | 8645 | 0.0 | 0.0 | 0.0 |
| 2009 | 8316 | 0.0 | 0.0 | 0.0 |
| 2010 | 8600 | 0.0 | 0.0 | 0.0 |
| 2011 | 8713 | 0.0 | 0.0 | 0.0 |
| 2012 | 4368 | 0.0 | 0.0 | 0.0 |
| 2013 | 8638 | 0.0 | 0.0 | 0.0 |
| 2014 | 8606 | 0.0 | 0.0 | 0.0 |
| 2015 | 8746 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]