X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264250801020

Well Details

Well ID: 0264250801020
Loading map...
Location: 02/01-08-026-25W4/0
Location Alias: 02/01-08-26-25 W4M
Location Alias 2: 02/01-08-026-25 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 25
Section: 08
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 1-8-26-25
Operator Name: Ember Resources Inc.
License Number: 0261330
License Date: 2001-11-02
License Status: Issued
Spud Date: 2001-11-16
Final Drill Date: 2001-11-18
Well Total Depth: 667.00 m
Surface Hole Latitude: 51.199328
Surface Hole Longitude: -113.447720

For data sources see[1][2]

Well History

Date Event
2001-11-02 Obtained License
2001-11-16 Conductor Casing Operation Performed
2001-11-18 Finished Drilling
2001-11-18 Lost Circulation Occurred
2001-11-19 Production Casing Operation Performed
2001-11-19 Rig Released
2001-11-19 Well Mode changed to Drilled and Cased
2001-11-24 Well Log Performed
2001-12-12 Perforation Treatment Performed - Jet Perforation
2002-01-18 Perforation Treatment Performed - Fractured
2002-02-16 Well Log Performed
2006-08-15 Well Began Production
2006-08-15 Well Fluid changed to Coalbed Methane-Coals Only
2006-08-15 Well Mode changed to Flowing
2011-01-28 Perforation Treatment Performed - Jet Perforation
2011-02-16 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-12-12 Perforation 616.80 618.80 13
2001-12-12 Perforation 503.90 506.90 13
2001-12-12 Perforation 501.90 503.90 13
2001-12-12 Perforation 484.40 487.40 13
2001-12-12 Perforation 478.80 479.80 13
2001-12-12 Perforation 457.10 458.10 13
2001-12-12 Perforation 450.70 451.70 13
2001-12-12 Perforation 438.50 439.50 13
2001-12-12 Perforation 430.90 431.90 13
2001-12-12 Perforation 388.00 390.00 13
2001-12-12 Perforation 342.70 344.70 13
2001-12-12 Perforation 614.80 616.80 13
2001-12-12 Perforation 339.50 340.50 13
2001-12-12 Perforation 325.00 326.00 13
2001-12-12 Perforation 319.30 322.30 13
2001-12-12 Perforation 311.30 312.30 13
2001-12-12 Perforation 253.50 254.50 13
2001-12-12 Perforation 205.50 206.50 13
2002-01-18 Fracture 205.50 618.80 0
2011-01-28 Perforation 420.50 421.50 13
2011-01-28 Perforation 409.00 410.00 13
2011-01-28 Perforation 404.00 405.00 13
2001-12-12 Perforation 611.80 612.80 13
2011-01-28 Perforation 390.00 392.00 13
2011-01-28 Perforation 379.00 382.00 13
2011-01-28 Perforation 354.00 356.00 13
2011-01-28 Perforation 277.50 279.50 13
2011-02-16 Fracture 420.50 421.50 0
2011-02-16 Fracture 404.00 410.00 0
2011-02-16 Fracture 379.00 382.00 0
2011-02-16 Fracture 354.00 356.00 0
2011-02-16 Fracture 277.50 279.50 0
2001-12-12 Perforation 579.00 581.00 13
2001-12-12 Perforation 573.20 574.20 13
2001-12-12 Perforation 566.70 568.70 13
2001-12-12 Perforation 561.70 562.70 13
2001-12-12 Perforation 546.00 548.00 13
2001-12-12 Perforation 540.00 541.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3330 0.0 0.0 0.0
2007 3899 0.0 0.0 0.0
2008 8039 0.0 0.0 0.0
2009 2736 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8712 0.0 0.0 0.0
2012 8732 0.0 0.0 0.0
2013 8750 0.0 0.0 0.0
2014 8742 0.0 0.0 0.0
2015 8692 0.0 0.0 0.0
2016 8704 0.0 0.0 0.0
2017 8636 0.0 0.0 0.0
2018 8739 0.0 0.0 0.0
2019 8598 0.0 0.0 0.0
2020 2004 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-11-18 Lost Circulation 0.10 665.30

For data sources see[6]

References