If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264243505002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.260559,"lon":-113.257737,"icon":""}]} |
Location: 00/05-35-026-24W4/2 | |
Location Alias: 00/05-35-26-24 W4M | |
Location Alias 2: 00/05-35-026-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 24 | |
Section: 35 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-35-26-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0323434 | |
License Date: 2005-01-06 | |
License Status: Issued | |
Spud Date: 2005-02-10 | |
Final Drill Date: 2005-02-14 | |
Well Total Depth: 929.00 m | |
Surface Hole Latitude: 51.260559 | |
Surface Hole Longitude: -113.257737 |
Date | Event |
---|---|
2005-01-06 | Obtained License |
2005-02-10 | Surface Casing Operation Performed |
2005-02-14 | Finished Drilling |
2005-02-14 | Well Mode changed to Drilled and Cased |
2005-02-15 | Production Casing Operation Performed |
2005-02-15 | Rig Released |
2005-02-17 | Well Log Performed |
2005-03-23 | Perforation Treatment Performed - Jet Perforation |
2005-04-13 | Perforation Treatment Performed - Fractured |
2010-08-08 | Perforation Treatment Performed - Jet Perforation |
2010-09-02 | Perforation Treatment Performed - Fractured |
2010-09-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-09-06 | Well Mode changed to Testing |
2010-09-27 | Perforation Treatment Performed - Fractured |
2010-10-07 | Well Began Production |
2010-10-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-10-07 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-03-23 | Perforation | 567.10 | 567.60 | 13 |
2005-03-23 | Perforation | 437.60 | 438.10 | 13 |
2005-03-23 | Perforation | 427.20 | 427.70 | 13 |
2005-03-23 | Perforation | 395.50 | 396.00 | 13 |
2005-03-23 | Perforation | 382.40 | 382.90 | 13 |
2005-03-23 | Perforation | 379.10 | 379.60 | 13 |
2005-03-23 | Perforation | 329.50 | 330.00 | 13 |
2005-03-23 | Perforation | 291.40 | 291.90 | 13 |
2005-03-23 | Perforation | 275.60 | 276.10 | 13 |
2005-03-23 | Perforation | 273.30 | 273.80 | 13 |
2005-03-23 | Perforation | 268.60 | 269.10 | 13 |
2005-03-23 | Perforation | 562.50 | 563.00 | 13 |
2005-03-23 | Perforation | 213.40 | 213.90 | 13 |
2005-04-13 | Fracture | 213.40 | 567.60 | 0 |
2010-08-08 | Perforation | 858.00 | 859.00 | 13 |
2010-08-08 | Perforation | 818.00 | 820.00 | 13 |
2010-08-08 | Perforation | 780.00 | 783.00 | 13 |
2010-08-08 | Perforation | 732.00 | 733.00 | 13 |
2010-08-08 | Perforation | 707.00 | 709.00 | 13 |
2010-08-08 | Perforation | 685.00 | 688.00 | 13 |
2010-08-08 | Perforation | 670.00 | 673.00 | 13 |
2010-08-08 | Perforation | 453.00 | 456.00 | 13 |
2005-03-23 | Perforation | 524.50 | 525.00 | 13 |
2010-08-08 | Perforation | 448.00 | 449.00 | 13 |
2010-08-08 | Perforation | 412.00 | 414.00 | 13 |
2010-08-08 | Perforation | 389.00 | 392.00 | 13 |
2010-08-08 | Perforation | 366.00 | 367.00 | 13 |
2010-08-08 | Perforation | 358.00 | 359.00 | 13 |
2010-08-08 | Perforation | 347.00 | 350.00 | 13 |
2010-08-08 | Perforation | 295.00 | 296.00 | 13 |
2010-08-08 | Perforation | 249.00 | 251.00 | 13 |
2010-08-08 | Perforation | 236.00 | 238.00 | 13 |
2010-08-08 | Perforation | 205.00 | 207.00 | 13 |
2005-03-23 | Perforation | 514.50 | 515.00 | 13 |
2010-09-02 | Fracture | 858.00 | 859.00 | 0 |
2010-09-02 | Fracture | 707.00 | 709.00 | 0 |
2010-09-02 | Fracture | 685.00 | 688.00 | 0 |
2010-09-27 | Fracture | 205.00 | 456.00 | 0 |
2005-03-23 | Perforation | 508.60 | 509.10 | 13 |
2005-03-23 | Perforation | 501.50 | 502.00 | 13 |
2005-03-23 | Perforation | 496.70 | 497.20 | 13 |
2005-03-23 | Perforation | 489.00 | 489.50 | 13 |
2005-03-23 | Perforation | 445.20 | 445.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2044 | 0.0 | 0.0 | 0.0 |
2011 | 8752 | 0.0 | 0.0 | 0.0 |
2012 | 8498 | 0.0 | 0.0 | 0.0 |
2013 | 8565 | 0.0 | 0.0 | 0.0 |
2014 | 8711 | 0.0 | 0.0 | 0.0 |
2015 | 8708 | 0.0 | 0.0 | 0.0 |
2016 | 8734 | 0.0 | 0.0 | 0.0 |
2017 | 8658 | 0.0 | 0.0 | 0.0 |
2018 | 8696 | 0.0 | 0.0 | 0.0 |
2019 | 6518 | 0.0 | 0.0 | 0.0 |
2020 | 60 | 0.0 | 0.0 | 0.0 |
For data sources see[5]