X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264243206000

Well Details

Well ID: 0264243206000
Loading map...
Location: 00/06-32-026-24W4/0
Location Alias: 00/06-32-26-24 W4M
Location Alias 2: 00/06-32-026-24 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 24
Section: 32
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 6-32-26-24
Operator Name: Ember Resources Inc.
License Number: 0412494
License Date: 2009-09-22
License Status: Issued
Spud Date: 2010-01-18
Final Drill Date: 2010-01-28
Well Total Depth: 690.00 m
Surface Hole Latitude: 51.260645
Surface Hole Longitude: -113.324223

For data sources see[1][2]

Well History

Date Event
2009-09-22 Obtained License
2010-01-19 Surface Casing Operation Performed
2010-01-28 Finished Drilling
2010-01-28 Well Mode changed to Drilled and Cased
2010-01-29 Production Casing Operation Performed
2010-01-29 Rig Released
2010-02-02 Well Log Performed
2010-02-16 Perforation Treatment Performed - Jet Perforation
2010-04-08 Perforation Treatment Performed - Jet Perforation
2010-05-12 Perforation Treatment Performed - Fractured
2010-06-03 Well Began Production
2010-06-03 Well Fluid changed to Coalbed Methane-Coals and Other
2010-06-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-16 Perforation 276.00 279.00 13
2010-04-08 Perforation 261.50 262.00 13
2010-04-08 Perforation 268.60 269.10 13
2010-04-08 Perforation 360.00 361.00 13
2010-04-08 Perforation 215.00 218.00 13
2010-04-08 Perforation 231.00 234.00 13
2010-04-08 Perforation 199.00 201.00 13
2010-04-08 Perforation 210.00 212.00 13
2010-04-08 Perforation 290.00 291.00 13
2010-04-08 Perforation 355.00 356.00 13
2010-04-08 Perforation 236.00 238.00 13
2010-02-16 Perforation 584.00 586.00 13
2010-04-08 Perforation 247.00 249.00 13
2010-04-08 Perforation 468.70 469.20 13
2010-04-08 Perforation 475.10 475.60 13
2010-04-08 Perforation 414.40 415.40 13
2010-04-08 Perforation 427.10 430.10 13
2010-04-08 Perforation 477.90 478.40 13
2010-04-08 Perforation 503.20 503.70 13
2010-04-08 Perforation 547.40 547.90 13
2010-04-08 Perforation 485.40 486.40 13
2010-04-08 Perforation 500.90 501.40 13
2010-02-16 Perforation 665.00 667.00 13
2010-04-08 Perforation 370.20 370.70 13
2010-04-08 Perforation 377.40 377.90 13
2010-04-08 Perforation 341.00 344.00 13
2010-04-08 Perforation 347.00 348.00 13
2010-04-08 Perforation 386.90 387.90 13
2010-04-08 Perforation 399.20 399.70 13
2010-04-08 Perforation 389.90 390.90 13
2010-04-08 Perforation 392.00 392.50 13
2010-05-12 Fracture 210.00 521.00 0
2010-05-12 Fracture 258.70 547.90 0
2010-04-08 Perforation 518.00 521.00 13
2010-04-08 Perforation 258.70 259.20 13
2010-04-08 Perforation 433.00 435.00 13
2010-04-08 Perforation 458.00 460.00 13
2010-04-08 Perforation 316.20 316.70 13
2010-04-08 Perforation 320.00 321.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5088 0.0 0.0 0.0
2011 8753 0.0 0.0 0.0
2012 8779 0.0 0.0 0.0
2013 8716 0.0 0.0 0.0
2014 8713 0.0 0.0 0.0
2015 8712 0.0 0.0 0.0
2016 8743 0.0 0.0 0.0
2017 8602 0.0 0.0 0.0
2018 8727 0.0 0.0 0.0
2019 8721 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[5]

References