If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264243016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.254481,"lon":-113.33124,"icon":""}]} |
Location: 00/16-30-026-24W4/0 | |
Location Alias: 00/16-30-26-24 W4M | |
Location Alias 2: 00/16-30-026-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 24 | |
Section: 30 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 16-30-26-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0333165 | |
License Date: 2005-06-17 | |
License Status: Issued | |
Spud Date: 2005-07-16 | |
Final Drill Date: 2005-07-30 | |
Well Total Depth: 943.00 m | |
Surface Hole Latitude: 51.254481 | |
Surface Hole Longitude: -113.331240 |
Date | Event |
---|---|
2005-06-17 | Obtained License |
2005-07-16 | Surface Casing Operation Performed |
2005-07-30 | Finished Drilling |
2005-07-30 | Production Casing Operation Performed |
2005-07-30 | Rig Released |
2005-07-30 | Well Mode changed to Drilled and Cased |
2005-08-02 | Well Log Performed |
2005-08-20 | Perforation Treatment Performed - Jet Perforation |
2005-08-30 | Perforation Treatment Performed - Jet Perforation |
2005-10-19 | Perforation Treatment Performed - Jet Perforation |
2005-11-01 | Perforation Treatment Performed - Fractured |
2005-12-12 | Well Began Production |
2005-12-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-12-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-20 | Perforation | 861.00 | 862.00 | 13 |
2005-10-19 | Perforation | 450.60 | 451.10 | 13 |
2005-10-19 | Perforation | 449.10 | 449.60 | 13 |
2005-10-19 | Perforation | 442.90 | 443.40 | 13 |
2005-10-19 | Perforation | 438.50 | 439.00 | 13 |
2005-10-19 | Perforation | 437.50 | 438.00 | 13 |
2005-10-19 | Perforation | 435.30 | 435.80 | 13 |
2005-10-19 | Perforation | 430.90 | 431.40 | 13 |
2005-10-19 | Perforation | 421.00 | 422.00 | 13 |
2005-10-19 | Perforation | 410.10 | 410.60 | 13 |
2005-10-19 | Perforation | 408.90 | 409.40 | 13 |
2005-08-30 | Perforation | 609.50 | 610.50 | 13 |
2005-10-19 | Perforation | 407.90 | 408.40 | 13 |
2005-10-19 | Perforation | 405.00 | 405.50 | 13 |
2005-10-19 | Perforation | 392.00 | 392.50 | 13 |
2005-10-19 | Perforation | 388.90 | 389.40 | 13 |
2005-10-19 | Perforation | 385.80 | 386.30 | 13 |
2005-10-19 | Perforation | 371.10 | 371.60 | 13 |
2005-10-19 | Perforation | 344.40 | 344.90 | 13 |
2005-10-19 | Perforation | 335.60 | 336.60 | 13 |
2005-10-19 | Perforation | 315.40 | 315.90 | 13 |
2005-10-19 | Perforation | 302.00 | 302.50 | 13 |
2005-10-19 | Perforation | 555.80 | 556.30 | 13 |
2005-10-19 | Perforation | 293.20 | 293.70 | 13 |
2005-10-19 | Perforation | 287.80 | 288.30 | 13 |
2005-10-19 | Perforation | 277.60 | 278.10 | 13 |
2005-10-19 | Perforation | 274.30 | 274.80 | 13 |
2005-10-19 | Perforation | 270.80 | 271.30 | 13 |
2005-10-19 | Perforation | 266.90 | 271.30 | 13 |
2005-11-01 | Fracture | 266.90 | 556.30 | 0 |
2005-10-19 | Perforation | 524.20 | 524.70 | 13 |
2005-10-19 | Perforation | 522.40 | 522.90 | 13 |
2005-10-19 | Perforation | 507.70 | 508.20 | 13 |
2005-10-19 | Perforation | 499.90 | 500.40 | 13 |
2005-10-19 | Perforation | 497.00 | 497.50 | 13 |
2005-10-19 | Perforation | 490.50 | 491.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 480 | 0.0 | 0.0 | 0.0 |
2006 | 8039 | 0.0 | 0.0 | 0.0 |
2007 | 8559 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8753 | 0.0 | 0.0 | 0.0 |
2012 | 8779 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8712 | 0.0 | 0.0 | 0.0 |
2016 | 8743 | 0.0 | 0.0 | 0.0 |
2017 | 8602 | 0.0 | 0.0 | 0.0 |
2018 | 8727 | 0.0 | 0.0 | 0.0 |
2019 | 8721 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[5]