X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264242308000

Well Details

Well ID: 0264242308000
Loading map...
Location: 00/08-23-026-24W4/0
Location Alias: 00/08-23-26-24 W4M
Location Alias 2: 00/08-23-026-24 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 24
Section: 23
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 8-23-26-24
Operator Name: Ember Resources Inc.
License Number: 0315287
License Date: 2004-09-24
License Status: Issued
Spud Date: 2004-09-28
Final Drill Date: 2004-10-04
Well Total Depth: 655.00 m
Surface Hole Latitude: 51.232041
Surface Hole Longitude: -113.239421

For data sources see[1][2]

Well History

Date Event
2004-09-24 Obtained License
2004-09-28 Surface Casing Operation Performed
2004-10-04 Finished Drilling
2004-10-04 Production Casing Operation Performed
2004-10-04 Rig Released
2004-10-04 Well Mode changed to Drilled and Cased
2004-10-14 Well Log Performed
2004-10-26 Perforation Treatment Performed - Jet Perforation
2004-10-31 Perforation Treatment Performed - Fractured
2005-03-22 Well Began Production
2005-03-22 Well Fluid changed to Coalbed Methane-Coals Only
2005-03-22 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-10-26 Perforation 552.00 552.50 13
2004-10-26 Perforation 485.20 485.70 13
2004-10-26 Perforation 476.60 477.10 13
2004-10-26 Perforation 427.60 428.10 13
2004-10-26 Perforation 425.90 426.40 13
2004-10-26 Perforation 425.10 425.60 13
2004-10-26 Perforation 420.80 421.30 13
2004-10-26 Perforation 413.40 413.90 13
2004-10-26 Perforation 409.60 410.10 13
2004-10-26 Perforation 389.50 390.00 13
2004-10-26 Perforation 388.10 388.60 13
2004-10-26 Perforation 547.50 548.00 13
2004-10-26 Perforation 383.20 383.70 13
2004-10-26 Perforation 371.30 371.80 13
2004-10-26 Perforation 367.30 367.80 13
2004-10-26 Perforation 365.60 366.10 13
2004-10-26 Perforation 361.60 362.10 13
2004-10-26 Perforation 326.00 326.50 13
2004-10-26 Perforation 289.80 290.30 13
2004-10-26 Perforation 274.90 275.40 13
2004-10-26 Perforation 261.20 261.70 13
2004-10-26 Perforation 259.10 259.60 13
2004-10-26 Perforation 546.20 546.70 13
2004-10-26 Perforation 255.20 255.70 13
2004-10-31 Fracture 255.20 552.50 0
2004-10-26 Perforation 508.60 509.10 13
2004-10-26 Perforation 507.40 507.90 13
2004-10-26 Perforation 503.30 503.80 13
2004-10-26 Perforation 497.80 498.30 13
2004-10-26 Perforation 496.10 496.60 13
2004-10-26 Perforation 489.30 489.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 6635 0.0 0.0 0.0
2006 8319 0.0 0.0 0.0
2007 8133 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8739 0.0 0.0 0.0
2012 8749 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8715 0.0 0.0 0.0
2016 8698 0.0 0.0 0.0
2017 8660 0.0 0.0 0.0
2018 8645 0.0 0.0 0.0
2019 8471 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[5]

References