If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264242012000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.234683,"lon":-113.328628,"icon":""}]} |
Location: 00/12-20-026-24W4/0 | |
Location Alias: 00/12-20-26-24 W4M | |
Location Alias 2: 00/12-20-026-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 24 | |
Section: 20 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 12-20-26-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0260231 | |
License Date: 2001-10-02 | |
License Status: Amended | |
Spud Date: 2001-10-24 | |
Final Drill Date: 2001-10-28 | |
Well Total Depth: 1015.00 m | |
Surface Hole Latitude: 51.234683 | |
Surface Hole Longitude: -113.328628 |
Date | Event |
---|---|
2001-10-02 | Obtained License |
2001-10-26 | Direction Drilling Operation Performed - Deviate |
2001-10-26 | Surface Casing Operation Performed |
2001-10-28 | Finished Drilling |
2001-11-06 | Well Log Performed |
2001-11-07 | Production Casing Operation Performed |
2001-11-07 | Rig Released |
2001-11-07 | Well Mode changed to Drilled and Cased |
2002-01-25 | Well Log Performed |
2002-03-25 | Perforation Treatment Performed - Jet Perforation |
2002-08-28 | Perforation Treatment Performed - Fractured |
2002-09-20 | Perforation Treatment Performed - Jet Perforation |
2002-10-15 | Perforation Treatment Performed - Jet Perforation |
2002-11-11 | Perforation Treatment Performed - Fractured |
2002-11-26 | Perforation Treatment Performed - Jet Perforation |
2004-02-20 | Well Began Production |
2004-02-20 | Well Fluid changed to Gas |
2004-02-20 | Well Mode changed to Flowing |
2006-12-11 | Well Log Performed |
2006-12-14 | Perforation Treatment Performed - Jet Perforation |
2006-12-17 | Perforation Treatment Performed - Fractured |
2007-01-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2007-01-11 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2001-10-26 | 80.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-03-25 | Perforation | 717.00 | 721.00 | 7 |
2006-12-14 | Perforation | 572.10 | 572.60 | 7 |
2006-12-14 | Perforation | 537.40 | 537.90 | 7 |
2006-12-14 | Perforation | 534.70 | 535.70 | 7 |
2006-12-14 | Perforation | 530.20 | 531.20 | 7 |
2006-12-14 | Perforation | 528.80 | 529.30 | 7 |
2006-12-14 | Perforation | 522.90 | 523.90 | 7 |
2006-12-14 | Perforation | 516.00 | 516.50 | 7 |
2006-12-14 | Perforation | 512.10 | 513.10 | 7 |
2006-12-14 | Perforation | 505.20 | 505.70 | 7 |
2006-12-14 | Perforation | 463.50 | 464.50 | 7 |
2002-08-28 | Fracture | 717.00 | 721.00 | 0 |
2006-12-14 | Perforation | 454.30 | 454.80 | 7 |
2006-12-14 | Perforation | 443.30 | 443.80 | 7 |
2006-12-14 | Perforation | 441.90 | 442.40 | 7 |
2006-12-14 | Perforation | 432.80 | 433.30 | 7 |
2006-12-14 | Perforation | 432.10 | 432.60 | 7 |
2006-12-14 | Perforation | 424.20 | 424.70 | 7 |
2006-12-14 | Perforation | 422.00 | 423.00 | 7 |
2006-12-14 | Perforation | 418.00 | 420.00 | 7 |
2006-12-14 | Perforation | 411.70 | 412.20 | 7 |
2006-12-14 | Perforation | 408.40 | 408.90 | 7 |
2002-09-20 | Perforation | 698.00 | 700.00 | 7 |
2006-12-14 | Perforation | 403.70 | 405.70 | 7 |
2006-12-14 | Perforation | 387.20 | 387.70 | 7 |
2006-12-14 | Perforation | 365.10 | 365.60 | 7 |
2006-12-14 | Perforation | 362.80 | 363.30 | 7 |
2006-12-14 | Perforation | 361.40 | 361.90 | 7 |
2006-12-14 | Perforation | 353.80 | 354.30 | 7 |
2006-12-14 | Perforation | 353.00 | 353.50 | 7 |
2006-12-17 | Fracture | 353.00 | 602.50 | 0 |
2002-10-15 | Perforation | 545.00 | 547.00 | 7 |
2002-11-11 | Fracture | 545.00 | 547.00 | 0 |
2002-11-26 | Perforation | 466.00 | 469.00 | 7 |
2006-12-14 | Perforation | 602.00 | 602.50 | 7 |
2006-12-14 | Perforation | 593.10 | 593.60 | 7 |
2006-12-14 | Perforation | 574.60 | 575.60 | 7 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 2414 | 0.0 | 0.0 | 0.0 |
2005 | 528 | 0.0 | 0.0 | 0.0 |
2006 | 3732 | 0.0 | 0.0 | 0.0 |
2007 | 7975 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 7370 | 0.0 | 0.0 | 0.0 |
2011 | 2520 | 0.0 | 0.0 | 0.0 |
2012 | 2583 | 0.0 | 0.0 | 0.0 |
2013 | 5231 | 0.0 | 0.0 | 0.0 |
2014 | 6148 | 0.0 | 0.0 | 0.0 |
2015 | 8487 | 0.0 | 0.0 | 0.0 |
2016 | 8522 | 0.0 | 0.0 | 0.0 |
2017 | 8432 | 0.0 | 0.0 | 0.0 |
2018 | 8634 | 0.0 | 0.0 | 0.0 |
2019 | 8721 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[6]