X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264241816000

Well Details

Well ID: 0264241816000
Loading map...
Location: 00/16-18-026-24W4/0
Location Alias: 00/16-18-26-24 W4M
Location Alias 2: 00/16-18-026-24 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 24
Section: 18
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 16-18-26-24
Operator Name: Ember Resources Inc.
License Number: 0348635
License Date: 2006-01-11
License Status: Issued
Spud Date: 2006-01-13
Final Drill Date: 2006-01-13
Well Total Depth: 766.00 m
Surface Hole Latitude: 51.225209
Surface Hole Longitude: -113.335009

For data sources see[1][2]

Well History

Date Event
2006-01-11 Obtained License
2006-01-13 Finished Drilling
2006-01-13 Surface Casing Operation Performed
2006-01-13 Well Mode changed to Drilled and Cased
2006-01-14 Production Casing Operation Performed
2006-01-14 Rig Released
2006-01-18 Well Log Performed
2006-02-07 Perforation Treatment Performed - Jet Perforation
2006-02-21 Perforation Treatment Performed - Fractured
2006-02-25 Well Fluid changed to Gas
2006-02-25 Well Mode changed to Testing
2006-03-07 Perforation Treatment Performed - Jet Perforation
2006-03-15 Perforation Treatment Performed - Fractured
2006-04-03 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-07 Perforation 452.00 454.00 13
2006-03-07 Perforation 499.70 500.20 13
2006-03-07 Perforation 492.70 493.20 13
2006-03-07 Perforation 434.50 435.00 13
2006-03-07 Perforation 432.20 432.70 13
2006-03-07 Perforation 424.10 424.60 13
2006-03-07 Perforation 416.40 416.90 13
2006-03-07 Perforation 414.90 415.40 13
2006-03-07 Perforation 411.60 412.10 13
2006-03-07 Perforation 410.40 410.90 13
2006-03-07 Perforation 402.20 402.70 13
2006-02-21 Fracture 452.00 454.00 0
2006-03-07 Perforation 400.50 401.00 13
2006-03-07 Perforation 397.30 397.80 13
2006-03-07 Perforation 394.10 395.10 13
2006-03-07 Perforation 342.50 343.00 13
2006-03-07 Perforation 311.40 311.90 13
2006-03-07 Perforation 298.50 299.50 13
2006-03-07 Perforation 288.10 288.60 13
2006-03-07 Perforation 277.80 278.30 13
2006-03-07 Perforation 276.10 276.60 13
2006-03-07 Perforation 266.00 266.50 13
2006-03-07 Perforation 563.80 564.30 13
2006-03-07 Perforation 263.50 264.00 13
2006-03-07 Perforation 211.00 211.50 13
2006-03-15 Fracture 211.00 564.30 0
2006-03-07 Perforation 560.90 561.40 13
2006-03-07 Perforation 528.70 529.20 13
2006-03-07 Perforation 523.30 523.80 13
2006-03-07 Perforation 518.50 519.00 13
2006-03-07 Perforation 512.10 512.60 13
2006-03-07 Perforation 504.60 505.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 96 0.0 0.0 0.0

For data sources see[5]

References