X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264241010000

Well Details

Well ID: 0264241010000
Loading map...
Location: 00/10-10-026-24W4/0
Location Alias: 00/10-10-26-24 W4M
Location Alias 2: 00/10-10-026-24 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 24
Section: 10
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 10-10-26-24
Operator Name: Ember Resources Inc.
License Number: 0326397
License Date: 2005-02-14
License Status: Issued
Spud Date: 2005-08-03
Final Drill Date: 2005-08-05
Well Total Depth: 928.00 m
Surface Hole Latitude: 51.205465
Surface Hole Longitude: -113.266654

For data sources see[1][2]

Well History

Date Event
2005-02-14 Obtained License
2005-08-03 Surface Casing Operation Performed
2005-08-05 Finished Drilling
2005-08-05 Production Casing Operation Performed
2005-08-05 Rig Released
2005-08-05 Well Mode changed to Drilled and Cased
2005-08-09 Well Log Performed
2005-12-18 Perforation Treatment Performed - Jet Perforation
2005-12-19 Perforation Treatment Performed - Jet Perforation
2006-01-06 Perforation Treatment Performed - Fractured
2006-03-20 Well Began Production
2006-03-20 Well Fluid changed to Coalbed Methane-Coals Only
2006-03-20 Well Mode changed to Flowing
2006-10-31 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-18 Perforation 552.50 553.00 13
2005-12-18 Perforation 479.20 479.70 13
2005-12-18 Perforation 475.20 475.70 13
2005-12-18 Perforation 468.10 468.60 13
2005-12-18 Perforation 419.50 420.00 13
2005-12-18 Perforation 413.70 414.20 13
2005-12-18 Perforation 403.90 404.40 13
2005-12-18 Perforation 393.20 393.70 13
2005-12-18 Perforation 392.10 392.60 13
2005-12-19 Perforation 383.20 384.20 13
2005-12-19 Perforation 380.30 380.80 13
2005-12-18 Perforation 544.40 544.90 13
2005-12-19 Perforation 376.40 376.90 13
2005-12-19 Perforation 362.90 363.40 13
2005-12-19 Perforation 360.10 360.60 13
2005-12-19 Perforation 359.00 359.50 13
2005-12-19 Perforation 311.60 312.10 13
2005-12-19 Perforation 310.20 310.70 13
2005-12-19 Perforation 309.10 309.60 13
2005-12-19 Perforation 304.40 304.90 13
2005-12-19 Perforation 293.10 293.60 13
2005-12-19 Perforation 274.20 274.70 13
2005-12-18 Perforation 538.00 538.50 13
2005-12-19 Perforation 270.00 270.50 13
2005-12-19 Perforation 266.10 266.60 13
2005-12-19 Perforation 255.20 255.70 13
2005-12-19 Perforation 251.60 252.10 13
2005-12-19 Perforation 246.30 246.80 13
2005-12-19 Perforation 244.70 245.20 13
2005-12-19 Perforation 236.40 236.90 13
2005-12-19 Perforation 210.40 210.90 13
2005-12-19 Perforation 190.60 191.10 13
2006-01-06 Fracture 190.60 553.00 0
2005-12-18 Perforation 534.00 534.50 13
2005-12-18 Perforation 529.50 530.00 13
2005-12-18 Perforation 499.10 499.60 13
2005-12-18 Perforation 497.60 498.10 13
2005-12-18 Perforation 491.70 492.20 13
2005-12-18 Perforation 485.90 486.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6716 0.0 0.0 0.0
2007 8164 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8739 0.0 0.0 0.0
2012 8773 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8716 0.0 0.0 0.0
2016 8698 0.0 0.0 0.0
2017 8647 0.0 0.0 0.0
2018 8302 0.0 0.0 0.0
2019 8372 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

References