X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264233103000

Well Details

Well ID: 0264233103000
Loading map...
Location: 00/03-31-026-23W4/0
Location Alias: 00/03-31-26-23 W4M
Location Alias 2: 00/03-31-026-23 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 23
Section: 31
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 3-31-26-23
Operator Name: Ember Resources Inc.
License Number: 0311306
License Date: 2004-07-05
License Status: Issued
Spud Date: 2004-07-18
Final Drill Date: 2004-07-28
Well Total Depth: 902.00 m
Surface Hole Latitude: 51.257294
Surface Hole Longitude: -113.204313

For data sources see[1][2]

Well History

Date Event
2004-07-05 Obtained License
2004-07-18 Surface Casing Operation Performed
2004-07-28 Finished Drilling
2004-07-28 Production Casing Operation Performed
2004-07-28 Rig Released
2004-07-28 Well Mode changed to Drilled and Cased
2004-08-18 Well Log Performed
2004-09-23 Perforation Treatment Performed - Jet Perforation
2004-11-10 Perforation Treatment Performed - Fractured
2004-11-14 Well Fluid changed to Coalbed Methane-Coals and Other
2004-11-14 Well Mode changed to Testing
2005-01-09 Perforation Treatment Performed - Jet Perforation
2005-02-26 Perforation Treatment Performed - Fractured
2005-03-09 Well Began Production
2005-03-09 Well Fluid changed to Coalbed Methane-Coals and Other
2005-03-09 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-09-23 Perforation 826.00 828.00 13
2005-01-09 Perforation 497.20 497.70 13
2005-01-09 Perforation 495.30 495.80 13
2005-01-09 Perforation 480.70 481.20 13
2005-01-09 Perforation 472.80 473.30 13
2005-01-09 Perforation 469.10 469.60 13
2005-01-09 Perforation 414.40 414.90 13
2005-01-09 Perforation 412.10 412.60 13
2005-01-09 Perforation 408.20 408.70 13
2005-01-09 Perforation 400.50 401.00 13
2005-01-09 Perforation 399.70 400.20 13
2004-09-23 Perforation 805.50 809.50 13
2005-01-09 Perforation 397.00 397.50 13
2005-01-09 Perforation 391.90 392.40 13
2005-01-09 Perforation 379.40 379.90 13
2005-01-09 Perforation 375.10 375.60 13
2005-01-09 Perforation 370.30 370.80 13
2005-01-09 Perforation 364.40 364.90 13
2005-01-09 Perforation 360.30 360.80 13
2005-01-09 Perforation 306.40 306.90 13
2005-01-09 Perforation 264.40 264.90 13
2005-01-09 Perforation 258.00 258.80 13
2004-09-23 Perforation 761.00 763.00 13
2005-01-09 Perforation 243.70 244.20 13
2005-01-09 Perforation 239.00 239.50 13
2005-01-09 Perforation 184.50 185.00 13
2005-02-26 Fracture 184.50 536.60 0
2004-09-23 Perforation 428.00 431.00 13
2004-11-10 Fracture 826.00 828.00 0
2004-11-10 Fracture 805.50 809.50 0
2005-01-09 Perforation 536.10 536.60 13
2005-01-09 Perforation 532.70 533.20 13
2005-01-09 Perforation 527.00 527.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 7111 0.0 0.0 0.0
2006 8743 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8740 0.0 0.0 0.0
2012 8501 0.0 0.0 0.0
2013 8737 0.0 0.0 0.0
2014 8706 0.0 0.0 0.0
2015 8704 0.0 0.0 0.0
2016 8738 0.0 0.0 0.0
2017 8667 0.0 0.0 0.0
2018 8719 0.0 0.0 0.0
2019 8705 0.0 0.0 0.0
2020 2133 0.0 0.0 0.0

For data sources see[5]

References