If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264213214000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.255163,"lon":-112.90519,"icon":""}]} |
Location: 00/14-32-026-21W4/0 | |
Location Alias: 00/14-32-26-21 W4M | |
Location Alias 2: 00/14-32-026-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 21 | |
Section: 32 | |
County/Municipality: Wheatland County | |
Well Name: APEL HZ HUSSAR 14-32-26-21 | |
Operator Name: TimberRock Energy Corp. | |
License Number: 0434534 | |
License Date: 2011-06-21 | |
License Status: Suspension | |
Spud Date: 2011-08-04 | |
Final Drill Date: 2011-08-24 | |
Well Total Depth: 3003.00 m | |
Surface Hole Latitude: 51.255163 | |
Surface Hole Longitude: -112.905190 |
Date | Event |
---|---|
2011-06-21 | Obtained License |
2011-08-06 | Surface Casing Operation Performed |
2011-08-09 | Direction Drilling Operation Performed - Horizontal |
2011-08-13 | Intermediate Casing Operation Performed |
2011-08-24 | Finished Drilling |
2011-08-24 | Well Mode changed to Drilled and Cased |
2011-08-26 | Well Log Performed |
2011-08-28 | Liner Casing Operation Performed |
2011-08-29 | Rig Released |
2011-10-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-15 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-17 | Well Began Production |
2012-02-17 | Well Fluid changed to Crude Oil |
2012-02-17 | Well Mode changed to Pumping |
2017-07-01 | Well Fluid changed to Crude Oil |
2017-07-01 | Well Mode changed to Suspended |
2019-11-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-28 | Plug Back Performed |
2019-11-28 | Well Fluid changed to Crude Oil |
2019-11-28 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-09 | 1276.40 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-15 | Open Hole/Barefoot Completion | 1647.00 | 3003.00 | 0 |
2011-10-20 | Multi-Stage Fracture | 2403.60 | 2403.70 | 0 |
2011-10-20 | Multi-Stage Fracture | 2344.90 | 2345.00 | 0 |
2011-10-20 | Multi-Stage Fracture | 2286.20 | 2286.30 | 0 |
2011-10-20 | Multi-Stage Fracture | 2227.30 | 2227.40 | 0 |
2011-10-21 | Multi-Stage Fracture | 2168.40 | 2168.50 | 0 |
2011-10-21 | Multi-Stage Fracture | 2109.70 | 2109.80 | 0 |
2011-10-21 | Multi-Stage Fracture | 2050.80 | 2050.90 | 0 |
2011-10-21 | Multi-Stage Fracture | 1978.00 | 1978.10 | 0 |
2011-10-21 | Multi-Stage Fracture | 1932.30 | 1932.40 | 0 |
2011-10-21 | Multi-Stage Fracture | 1818.70 | 1818.80 | 0 |
2011-10-15 | Multi-Stage Fracture | 2973.30 | 2973.40 | 0 |
2011-10-21 | Multi-Stage Fracture | 1746.70 | 1746.80 | 0 |
2019-11-28 | Packing Device Capped w/Cement | 1505.50 | 1513.50 | 0 |
2011-10-19 | Multi-Stage Fracture | 2914.40 | 2914.50 | 0 |
2011-10-19 | Multi-Stage Fracture | 2856.00 | 2856.10 | 0 |
2011-10-19 | Multi-Stage Fracture | 2783.50 | 2783.60 | 0 |
2011-10-20 | Multi-Stage Fracture | 2724.50 | 2724.60 | 0 |
2011-10-20 | Multi-Stage Fracture | 2579.80 | 2579.90 | 0 |
2011-10-20 | Multi-Stage Fracture | 2521.10 | 2521.20 | 0 |
2011-10-20 | Multi-Stage Fracture | 2475.50 | 2475.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7247 | 0.0 | 0.0 | 0.0 |
2013 | 8531 | 0.0 | 0.0 | 0.0 |
2014 | 8316 | 0.0 | 0.0 | 0.0 |
2015 | 2303 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-11-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]