X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264170106002

Well Details

Well ID: 0264170106002
Loading map...
Location: 00/06-01-026-17W4/2
Location Alias: 00/06-01-26-17 W4M
Location Alias 2: 00/06-01-026-17 W4/02
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 17
Section: 01
County/Municipality: Wheatland County
Well Name: TXNE 6C WINTERH 6-1-26-17
Operator Name: Torxen Energy Ltd.
License Number: 0421360
License Date: 2010-06-23
License Status: Issued
Spud Date: 2010-08-29
Final Drill Date: 2010-09-01
Well Total Depth: 1393.00 m
Surface Hole Latitude: 51.184504
Surface Hole Longitude: -112.254855

For data sources see[1][2]

Well History

Date Event
2010-06-23 Obtained License
2010-08-30 Surface Casing Operation Performed
2010-08-31 Direction Drilling Operation Performed - Deviate
2010-09-01 Finished Drilling
2010-09-01 Well Mode changed to Drilled and Cased
2010-09-02 Production Casing Operation Performed
2010-09-02 Rig Released
2010-09-02 Well Log Performed
2010-09-14 Perforation Treatment Performed - Jet Perforation
2010-09-14 Well Log Performed
2010-10-01 Perforation Treatment Performed - Fractured
2010-11-04 Well Log Performed
2011-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-17 Perforation Treatment Performed - Jet Perforation
2011-01-17 Plug Back Performed
2011-01-17 Well Log Performed
2011-01-26 Perforation Treatment Performed - Fractured
2011-03-12 Well Began Production
2011-03-12 Well Fluid changed to Gas
2011-03-12 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-31 225.80 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-14 Perforation 1353.00 1356.00 17
2010-10-01 Fracture 1353.00 1356.00 0
2011-01-17 Packing Device Capped w/Cement 1339.80 1347.80 0
2011-01-17 Perforation 1319.00 1323.00 17
2011-01-26 Fracture 1319.00 1323.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7001 0.0 0.0 0.0
2012 7740 0.0 0.0 0.0
2013 8067 0.0 0.0 0.0
2014 8408 0.0 0.0 0.0
2015 8346 0.0 0.0 0.0
2016 7965 0.0 0.0 0.0
2017 8172 0.0 0.0 0.0
2018 6486 0.0 0.0 0.0
2019 480 0.0 0.0 0.0

For data sources see[6]

References