X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264111102000

Well Details

Well ID: 0264111102000
Loading map...
Location: 00/02-11-026-11W4/0
Location Alias: 00/02-11-26-11 W4M
Location Alias 2: 00/02-11-026-11 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 11
Section: 11
County/Municipality: Special Areas No. 2
Well Name: GULF SUNNYNOOK 2-11-26-11
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0179671
License Date: 1995-08-01
License Status: RecCertified
Spud Date: 1995-08-10
Final Drill Date: 1995-08-13
Well Total Depth: 1046.00 m
Surface Hole Latitude: 51.200799
Surface Hole Longitude: -111.432348

For data sources see[1][2]

Well History

Date Event
1995-08-01 Obtained License
1995-08-11 Surface Casing Operation Performed
1995-08-13 Finished Drilling
1995-08-13 Well Log Performed
1995-08-13 Well Mode changed to Drilled and Cased
1995-08-14 Production Casing Operation Performed
1995-08-15 Rig Released
1995-08-23 Well Log Performed
1995-08-24 Perforation Treatment Performed - Jet Perforation
1995-08-30 Perforation Treatment Performed - Fractured
1996-07-19 Well Log Performed
1996-07-20 Perforation Treatment Performed - Jet Perforation
1996-07-23 Perforation Treatment Performed - Jet Perforation
1996-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-16 Well Began Production
1996-08-16 Well Fluid changed to Crude Oil
1996-08-16 Well Mode changed to Flowing
1996-10-22 Well Log Performed
1997-07-01 Well Fluid changed to Crude Oil
1997-07-01 Well Mode changed to Suspended
1997-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-18 Plug Back Performed
1997-07-18 Well Log Performed
1997-07-19 Well Abandoned
1997-07-19 Well Fluid changed to Crude Oil
1997-07-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-08-24 Perforation 991.00 994.00 13
1995-08-30 Fracture 991.00 994.00 0
1996-07-20 Perforation 1036.00 1040.00 14
1996-07-23 Perforation 1025.00 1030.50 14
1996-07-24 Acid Treatment 991.00 1040.00 0
1997-07-18 Packing Device Capped w/Cement 1012.00 1020.00 0
1997-07-18 Packing Device Capped w/Cement 970.00 978.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1056 0.0 0.0 0.0
1997 480 0.0 0.0 0.0

For data sources see[5]

References