If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264020409000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.194069,"lon":-110.2151,"icon":""}]} |
Location: 00/09-04-026-02W4/0 | |
Location Alias: 00/09-04-26-02 W4M | |
Location Alias 2: 00/09-04-026-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 02 | |
Section: 04 | |
County/Municipality: Municipal District of Acadia No. 34 | |
Well Name: PAI CAPRON 9-4-26-2 | |
Operator Name: Pembina NGL Corporation | |
License Number: 0222569 | |
License Date: 1999-04-21 | |
License Status: RecCertified | |
Spud Date: 1999-05-05 | |
Final Drill Date: 1999-05-09 | |
Well Total Depth: 964.00 m | |
Surface Hole Latitude: 51.194069 | |
Surface Hole Longitude: -110.215100 |
Date | Event |
---|---|
1999-04-21 | Obtained License |
1999-05-06 | Surface Casing Operation Performed |
1999-05-09 | Finished Drilling |
1999-05-09 | Well Log Performed |
1999-05-10 | Liner Casing Operation Performed |
1999-05-10 | Rig Released |
1999-05-10 | Well Mode changed to Drilled and Cased |
1999-05-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-05-26 | Perforation Treatment Performed - Jet Perforation |
1999-05-26 | Plug Back Performed |
1999-05-26 | Well Log Performed |
1999-05-27 | Perforation Treatment Performed - Jet Perforation |
1999-05-28 | Perforation Treatment Performed - Fractured |
1999-05-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-05-29 | Perforation Treatment Performed - Jet Perforation |
1999-05-29 | Plug Back Performed |
1999-05-31 | Perforation Treatment Performed - Fractured |
1999-06-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-01 | Perforation Treatment Performed - Jet Perforation |
1999-06-01 | Plug Back Performed |
1999-06-01 | Well Log Performed |
1999-06-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-02 | Perforation Treatment Performed - Jet Perforation |
1999-06-02 | Plug Back Performed |
1999-06-02 | Well Log Performed |
1999-06-05 | Perforation Treatment Performed - Fractured |
1999-06-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-06 | Perforation Treatment Performed - Jet Perforation |
1999-06-06 | Plug Back Performed |
1999-06-06 | Well Log Performed |
2002-07-17 | Well Log Performed |
2002-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-07-18 | Plug Back Performed |
2002-07-18 | Well Mode changed to Abandoned Zone |
2002-07-20 | Well Abandoned |
2002-07-20 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-05-26 | Perforation | 927.00 | 930.50 | 17 |
1999-06-01 | Packing Device Capped w/Cement | 868.00 | 876.00 | 0 |
1999-06-01 | Perforation | 852.00 | 855.00 | 17 |
1999-06-02 | Perforation | 839.00 | 840.00 | 17 |
1999-06-02 | Packing Device Capped w/Cement | 835.00 | 837.00 | 0 |
1999-06-02 | Perforation | 825.00 | 829.00 | 17 |
1999-06-05 | Fracture | 825.00 | 829.00 | 0 |
1999-06-06 | Packing Device Capped w/Cement | 821.00 | 823.00 | 0 |
1999-06-06 | Perforation | 739.00 | 740.00 | 17 |
2002-07-18 | Packing Device Capped w/Cement | 724.00 | 732.00 | 0 |
1999-05-26 | Packing Device Capped w/Cement | 923.90 | 925.90 | 0 |
1999-05-26 | Perforation | 902.00 | 905.00 | 17 |
1999-05-27 | Perforation | 899.00 | 901.50 | 17 |
1999-05-28 | Fracture | 899.00 | 905.00 | 0 |
1999-05-29 | Packing Device Capped w/Cement | 897.70 | 901.70 | 0 |
1999-05-29 | Packing Device Capped w/Cement | 889.00 | 897.00 | 0 |
1999-05-29 | Perforation | 878.00 | 881.00 | 17 |
1999-05-31 | Fracture | 878.00 | 881.00 | 0 |
For data sources see[4]