X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264011906000

Well Details

Well ID: 0264011906000
Loading map...
Location: 00/06-19-026-01W4/0
Location Alias: 00/06-19-26-01 W4M
Location Alias 2: 00/06-19-026-01 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 01
Section: 19
County/Municipality: Municipal District of Acadia No. 34
Well Name: PETROMARK ET AL GRAINDALE 6-19-26-1
Operator Name: Pasiciel, Harold
License Number: 0076743
License Date: 1979-07-10
License Status: RecCertified
Spud Date: 1979-09-21
Final Drill Date: 1979-09-27
Well Total Depth: 1029.00 m
Surface Hole Latitude: 51.231632
Surface Hole Longitude: -110.133625

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-10 Obtained License
1979-09-23 Lost Circulation Occurred
1979-09-24 Drill Stem Test Performed
1979-09-24 Lost Circulation Occurred
1979-09-25 Kick Occurred
1979-09-27 Drill Stem Test Performed
1979-09-27 Finished Drilling
1979-09-27 Well Mode changed to Drilled and Cased
1979-09-28 Drill Stem Test Performed
1979-09-29 Drill Stem Test Performed
1979-09-30 Production Casing Operation Performed
1980-01-14 Perforation Treatment Performed - Jet Perforation
1980-02-07 Well Began Production
1980-02-07 Well Fluid changed to Gas
1980-02-07 Well Mode changed to Flowing
1981-07-01 Well Fluid changed to Gas
1981-07-01 Well Mode changed to Suspended
1983-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-06-02 Well Abandoned
1983-06-02 Well Fluid changed to Gas
1983-06-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-01-14 Perforation 768.50 769.00 7
1983-06-02 Packing Device Capped w/Cement 752.00 760.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 6116 0.0 0.0 0.0
1981 2979 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-09-23 Lost Circulation 220.00 220.00
1979-09-24 Lost Circulation 766.00 790.00
1979-09-25 Kick 790.00 790.00

For data sources see[6]

References