X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0255062216000

Well Details

Well ID: 0255062216000
Loading map...
Location: 00/16-22-025-06W5/0
Location Alias: 00/16-22-25-06 W5M
Location Alias 2: 00/16-22-025-06 W5/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 5
Range: 06
Section: 22
County/Municipality: Stoney 142, 143, 144
Well Name: SHELL 22 UNIT 1 JUMPW 16-22-25-6
Operator Name: Shell Canada Limited
License Number: 0095791
License Date: 1982-04-30
License Status: Abandoned
Spud Date: 1982-05-03
Final Drill Date: 1982-07-21
Well Total Depth: 3805.00 m
Surface Hole Latitude: 51.149262
Surface Hole Longitude: -114.760426

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-04-30 Obtained License
1982-07-21 Finished Drilling
1982-07-21 Well Mode changed to Drilled and Cased
1982-07-25 Production Casing Operation Performed
1982-11-03 Perforation Treatment Performed - Jet Perforation
1982-11-05 Perforation Treatment Performed - Jet Perforation
1982-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-25 Perforation Treatment Performed - Fractured
1982-12-09 Well Began Production
1982-12-09 Well Fluid changed to Gas
1982-12-09 Well Mode changed to Flowing
1993-08-30 Well Fluid changed to Gas
1993-08-30 Well Mode changed to Suspended
1996-12-06 Perforation Treatment Performed - Jet Perforation
1996-12-07 Well Log Performed
1996-12-14 Perforation Treatment Performed - Acid Wash - No Pressure
1997-01-09 Perforation Treatment Performed - Fractured
2012-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-12 Plug Back Performed
2012-05-12 Well Fluid changed to Gas
2012-05-12 Well Mode changed to Abandoned Zone
2012-05-20 Perforation Treatment Performed - Jet Perforation
2012-05-22 Perforation Treatment Performed - Cement Squeeze
2012-05-22 Plug Back Performed
2012-05-23 Perforation Treatment Performed - Jet Perforation
2012-05-24 Perforation Treatment Performed - Cement Squeeze
2012-05-24 Perforation Treatment Performed - Jet Perforation
2012-05-24 Plug Back Performed
2012-05-26 Perforation Treatment Performed - Cement Plug
2012-05-26 Plug Back Performed
2013-10-10 Well Log Performed
2013-10-14 Perforation Treatment Performed - Jet Perforation
2013-10-14 Well Log Performed
2013-10-16 Perforation Treatment Performed - Cement Squeeze
2013-10-16 Plug Back Performed
2013-10-17 Perforation Treatment Performed - Jet Perforation
2013-10-17 Well Log Performed
2013-10-18 Perforation Treatment Performed - Cement Squeeze
2013-10-18 Plug Back Performed
2013-10-19 Perforation Treatment Performed - Jet Perforation
2013-10-19 Well Log Performed
2013-10-20 Perforation Treatment Performed - Cement Squeeze
2013-10-20 Plug Back Performed
2013-10-22 Plug Back Performed
2014-08-07 Well Log Performed
2014-09-19 Well Abandoned
2014-09-26 Well Fluid changed to Gas
2014-09-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-03 Perforation 3627.00 3651.00 7
1982-11-25 Fracture 3557.00 3651.00 0
1996-12-06 Perforation 3558.00 3559.00 7
1996-12-06 Perforation 3560.00 3562.00 7
1996-12-06 Perforation 3571.00 3572.00 7
1996-12-06 Perforation 3577.00 3578.00 7
1996-12-06 Perforation 3601.00 3602.00 7
1996-12-06 Perforation 3612.00 3687.00 7
1996-12-14 Acid Wash 3558.00 3687.00 0
1997-01-09 Fracture 3558.00 3687.00 0
2012-05-12 Packing Device Capped w/Cement 3418.20 3498.00 0
1982-11-05 Perforation 3615.00 3639.00 7
2012-05-20 Perforation 1780.00 1781.00 20
2012-05-22 Cement Squeeze 1780.00 1781.00 0
2012-05-23 Perforation 904.00 905.00 13
2012-05-24 Cement Squeeze 904.00 905.00 0
2012-05-24 Perforation 599.00 600.00 13
2012-05-26 Cement Plug 511.50 616.40 0
2013-10-14 Perforation 3031.00 3033.00 17
2013-10-16 Cement Squeeze 3031.00 3032.00 0
2013-10-17 Perforation 2745.00 2748.00 17
2013-10-18 Cement Squeeze 2745.00 2748.00 0
1982-11-05 Perforation 3602.00 3609.00 7
2013-10-19 Perforation 2060.00 2063.00 17
2013-10-20 Cement Squeeze 2060.00 2063.00 0
1982-11-05 Perforation 3582.00 3592.00 7
1982-11-05 Perforation 3578.50 3582.00 7
1982-11-05 Perforation 3572.00 3577.00 7
1982-11-05 Perforation 3562.00 3568.00 7
1982-11-05 Perforation 3557.00 3558.00 7
1982-11-20 Acid Treatment 3557.00 3651.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 508 0.0 0.0 0.0
1983 5053 0.0 0.0 0.0
1984 5698 0.0 0.0 0.0
1985 5058 0.0 0.0 0.0
1986 5171 0.0 0.0 0.0
1987 2429 0.0 0.0 0.0
1989 447 0.0 0.0 0.0
1991 1 0.0 0.0 0.0
1992 3 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-28 No Incident Encountered 0.00 0.00
2013-10-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References