X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0255012608000

Well Details

Well ID: 0255012608000
Loading map...
Location: 00/08-26-025-01W5/0
Location Alias: 00/08-26-25-01 W5M
Location Alias 2: 00/08-26-025-01 W5/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 5
Range: 01
Section: 26
County/Municipality: Calgary
Well Name: PIONEER CANADA CROSSFIELD 8-26-25-1
Operator Name: TAQA North Ltd.
License Number: 0023718
License Date: 1963-01-28
License Status: RecCertified
Spud Date: 1963-02-04
Final Drill Date: 1963-02-16
Well Total Depth: 1786.10 m
Surface Hole Latitude: 51.159811
Surface Hole Longitude: -114.028642

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-01-28 Obtained License
1963-02-16 Finished Drilling
1963-02-16 Well Mode changed to Drilled and Cased
1963-02-18 Drill Stem Test Performed
1963-02-18 Production Casing Operation Performed
1963-02-27 Well Log Performed
1963-02-28 Perforation Treatment Performed - Bullet Perforation
1963-03-01 Perforation Treatment Performed - Cement Squeeze
1963-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-03 Perforation Treatment Performed - Jet Perforation
1963-03-04 Perforation Treatment Performed - Fractured
1963-03-27 Well Log Performed
1963-03-31 Perforation Treatment Performed - Cement Squeeze
1963-04-02 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-04-02 Perforation Treatment Performed - Fractured
1963-11-17 Well Began Production
1963-11-17 Well Fluid changed to Crude Oil
1963-11-17 Well Mode changed to Pumping
1972-04-01 Well Fluid changed to Crude Oil
1972-04-01 Well Mode changed to Suspended
1973-03-08 Well Began Injection
1973-03-08 Well Fluid changed to Water
1973-03-08 Well Type changed to Injection
1974-07-20 Perforation Treatment Performed - Jet Perforation
1974-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-23 Perforation Treatment Performed - Jet Perforation
1974-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-24 Well Log Performed
1977-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-03-29 Well Abandoned
1977-03-29 Well Fluid changed to Water
1977-03-29 Well Mode changed to Abandoned
1977-03-29 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-02-28 Bullet Perforation 1771.50 1772.10 13
1974-07-20 Perforation 1767.20 1767.80 7
1974-07-20 Perforation 1768.40 1769.70 7
1974-07-22 Acid Treatment 1767.20 1769.70 0
1974-10-23 Perforation 1767.20 1769.70 13
1974-10-24 Acid Treatment 1767.20 1769.70 0
1977-03-29 Packing Device Capped w/Cement 1731.30 1731.30 0
1963-03-01 Cement Squeeze 1771.50 1772.10 0
1963-03-03 Perforation 1767.50 1769.10 7
1963-03-03 Acid Treatment 1767.50 1769.10 0
1963-03-04 Fracture 1767.50 1769.10 0
1963-03-31 Cement Squeeze 1767.50 1769.10 0
1963-04-02 Hydra Jet Perforation 1767.80 1768.10 0
1963-04-02 Hydra Jet Perforation 1768.40 1768.80 0
1963-04-02 Fracture 1767.80 1768.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 192 0.0 0.0 0.0
1969 716 0.0 0.0 0.0
1970 72 0.0 0.0 0.0
1971 198 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0

For data sources see[5]

References