X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0255011306000

Well Details

Well ID: 0255011306000
Loading map...
Location: 00/06-13-025-01W5/0
Location Alias: 00/06-13-25-01 W5M
Location Alias 2: 00/06-13-025-01 W5/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 5
Range: 01
Section: 13
County/Municipality: Calgary
Well Name: BONAVISTA CROSS 6-13-25-1
Operator Name: Bonavista Energy Corporation
License Number: 0020906
License Date: 1961-06-13
License Status: Abandoned
Spud Date: 1961-06-13
Final Drill Date: 1961-06-22
Well Total Depth: 1773.90 m
Surface Hole Latitude: 51.130570
Surface Hole Longitude: -114.014868

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-06-13 Obtained License
1961-06-22 Finished Drilling
1961-06-22 Well Mode changed to Drilled and Cased
1961-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-23 Perforation Treatment Performed - Bullet Perforation
1961-06-23 Production Casing Operation Performed
1961-07-03 Well Began Production
1961-07-03 Well Fluid changed to Crude Oil
1961-07-03 Well Mode changed to Flowing
1961-07-26 Perforation Treatment Performed - Cement Squeeze
1961-07-31 Perforation Treatment Performed - Cement Squeeze
1961-08-19 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-19 Perforation Treatment Performed - Fractured
1962-10-12 Well Fluid changed to Crude Oil
1962-10-12 Well Mode changed to Pumping
1998-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-01 Plug Back Performed
1998-10-02 Perforation Treatment Performed - Cement Squeeze
1998-10-02 Perforation Treatment Performed - Jet Perforation
1998-10-06 Well Abandoned
1998-10-06 Well Fluid changed to Crude Oil
1998-10-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-06-23 Bullet Perforation 1758.10 1761.10 7
1998-10-01 Packing Device Capped w/Cement 1733.30 1748.30 0
1998-10-02 Perforation 282.80 282.80 20
1998-10-02 Cement Squeeze 282.80 282.80 0
1961-06-23 Acid Treatment 1758.10 1761.10 0
1961-07-26 Cement Squeeze 1758.10 1761.10 0
1961-07-31 Cement Squeeze 1758.10 1761.10 0
1961-08-19 Hydra Jet Perforation 1757.20 1757.50 0
1961-08-19 Hydra Jet Perforation 1757.80 1758.10 0
1961-08-19 Hydra Jet Perforation 1758.40 1758.70 0
1961-08-19 Acid Treatment 1757.20 1758.70 0
1961-08-19 Fracture 1757.20 1758.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 8279 0.0 0.0 0.0
1970 8376 0.0 0.0 0.0
1971 8567 0.0 0.0 0.0
1972 8615 0.0 0.0 0.0
1973 7536 0.0 0.0 0.0
1974 7890 0.0 0.0 0.0
1975 7703 0.0 0.0 0.0
1976 7772 0.0 0.0 0.0
1977 6917 0.0 0.0 0.0
1978 6940 0.0 0.0 0.0
1979 7990 0.0 0.0 0.0
1980 7870 0.0 0.0 0.0
1981 7558 0.0 0.0 0.0
1982 8088 0.0 0.0 0.0
1983 8699 0.0 0.0 0.0
1984 8721 0.0 0.0 0.0
1985 8739 0.0 0.0 0.0
1986 8648 0.0 0.0 0.0
1987 8699 0.0 0.0 0.0
1988 8694 0.0 0.0 0.0
1989 8615 0.0 0.0 0.0
1990 8710 0.0 0.0 0.0
1991 8524 0.0 0.0 0.0
1992 7967 0.0 0.0 0.0
1993 7847 0.0 0.0 0.0
1994 8344 0.0 0.0 0.0
1995 7967 0.0 0.0 0.0
1996 8007 0.0 0.0 0.0
1997 4274 0.0 0.0 0.0
1998 426 0.0 0.0 0.0

For data sources see[5]

References