X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254262809000

Well Details

Well ID: 0254262809000
Loading map...
Location: 00/09-28-025-26W4/0
Location Alias: 00/09-28-25-26 W4M
Location Alias 2: 00/09-28-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 28
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 9-28-25-26
Operator Name: Ember Resources Inc.
License Number: 0203327
License Date: 1997-07-10
License Status: Issued
Spud Date: 1997-07-20
Final Drill Date: 1997-07-23
Well Total Depth: 1051.00 m
Surface Hole Latitude: 51.161999
Surface Hole Longitude: -113.565684

For data sources see[1][2]

Well History

Date Event
1997-07-10 Obtained License
1997-07-20 Surface Casing Operation Performed
1997-07-23 Finished Drilling
1997-07-24 Production Casing Operation Performed
1997-07-24 Rig Released
1997-07-24 Well Mode changed to Drilled and Cased
1997-08-06 Well Log Performed
1998-06-13 Perforation Treatment Performed - Jet Perforation
1998-06-13 Well Log Performed
1998-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-18 Plug Back Performed
1998-07-18 Well Log Performed
1998-07-19 Perforation Treatment Performed - Jet Perforation
1998-07-29 Perforation Treatment Performed - Fractured
1998-08-22 Well Log Performed
1998-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-23 Plug Back Performed
1998-10-05 Perforation Treatment Performed - Jet Perforation
1998-10-05 Well Log Performed
1998-12-21 Perforation Treatment Performed - Jet Perforation
1998-12-21 Well Log Performed
1999-01-12 Perforation Treatment Performed - Fractured
2000-05-24 Perforation Treatment Performed - Jet Perforation
2000-05-24 Well Log Performed
2000-07-18 Perforation Treatment Performed - Fractured
2000-12-23 Well Began Production
2000-12-23 Well Fluid changed to Gas
2000-12-23 Well Mode changed to Flowing
2011-09-12 Perforation Treatment Performed - Jet Perforation
2011-09-14 Perforation Treatment Performed - Fractured
2011-10-14 Well Fluid changed to Coalbed Methane-Coals and Other
2011-10-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-06-13 Perforation 945.00 949.00 13
1998-12-21 Perforation 725.50 727.50 14
1999-01-12 Fracture 695.50 727.50 0
2000-05-24 Perforation 446.00 450.00 14
2000-07-18 Fracture 446.00 450.00 0
2011-09-12 Perforation 215.10 216.60 13
2011-09-12 Perforation 221.80 222.30 13
2011-09-12 Perforation 264.10 264.60 13
2011-09-12 Perforation 288.00 291.00 13
2011-09-12 Perforation 293.50 295.00 13
2011-09-12 Perforation 325.50 326.00 13
1998-06-13 Perforation 948.50 951.00 13
2011-09-12 Perforation 338.10 338.60 13
2011-09-12 Perforation 345.50 347.00 13
2011-09-12 Perforation 369.00 371.00 13
2011-09-12 Perforation 379.00 381.00 13
2011-09-12 Perforation 397.20 397.70 13
2011-09-12 Perforation 406.00 406.50 13
2011-09-12 Perforation 409.50 411.50 13
2011-09-12 Perforation 436.20 436.70 13
2011-09-12 Perforation 463.60 464.10 13
2011-09-12 Perforation 464.40 465.40 13
1998-07-18 Packing Device Capped w/Cement 936.00 944.00 0
2011-09-12 Perforation 466.20 466.70 13
2011-09-12 Perforation 471.30 471.80 13
2011-09-12 Perforation 472.60 474.10 13
2011-09-12 Perforation 477.50 478.00 13
2011-09-12 Perforation 478.40 479.40 13
2011-09-12 Perforation 483.40 484.40 13
2011-09-12 Perforation 494.50 495.00 13
2011-09-12 Perforation 497.50 498.00 13
2011-09-12 Perforation 502.40 503.90 13
2011-09-12 Perforation 516.60 517.60 13
1998-07-19 Perforation 940.00 941.00 14
2011-09-12 Perforation 518.50 520.00 13
2011-09-12 Perforation 520.00 520.50 13
2011-09-12 Perforation 524.00 524.50 13
2011-09-12 Perforation 570.00 571.00 13
2011-09-12 Perforation 581.10 582.60 13
2011-09-12 Perforation 589.30 590.30 13
2011-09-12 Perforation 592.90 593.90 13
2011-09-12 Perforation 599.40 599.90 13
2011-09-12 Perforation 629.30 630.30 13
2011-09-12 Perforation 634.10 634.60 13
1998-07-29 Fracture 940.00 941.00 0
2011-09-12 Perforation 636.60 637.10 13
2011-09-14 Fracture 215.10 637.10 0
1998-08-23 Packing Device Capped w/Cement 927.00 935.00 0
1998-10-05 Perforation 695.50 699.50 14
1998-10-05 Perforation 710.50 711.50 14
1998-12-21 Perforation 719.00 722.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 231 0.0 0.0 0.0
2001 8349 0.0 0.0 0.0
2002 8090 0.0 0.0 0.0
2003 8625 0.0 0.0 0.0
2004 8613 0.0 0.0 0.0
2005 8367 0.0 0.0 0.0
2006 8332 0.0 0.0 0.0
2007 8295 0.0 0.0 0.0
2008 8085 0.0 0.0 0.0
2009 7064 0.0 0.0 0.0
2010 8739 0.0 0.0 0.0
2011 7638 0.0 0.0 0.0
2012 4584 0.0 0.0 0.0
2013 8716 0.0 0.0 0.0
2014 8713 0.0 0.0 0.0
2015 8758 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References